메뉴 건너뛰기




Volumn 17, Issue 1, 2009, Pages 1-7

Modeling and Optimization for Scheduling of Chemical Batch Processes

Author keywords

chemical batch processes; optimization methods; scheduling

Indexed keywords

BATCH DATA PROCESSING; BENCHMARKING; CHEMICAL ENGINEERING; CHEMICAL INDUSTRY; CHEMICAL REACTIONS; INDUSTRIAL MANAGEMENT; OPTIMIZATION;

EID: 61349199084     PISSN: 10049541     EISSN: None     Source Type: Journal    
DOI: 10.1016/S1004-9541(09)60025-2     Document Type: Article
Times cited : (12)

References (19)
  • 1
    • 2442583184 scopus 로고    scopus 로고
    • "Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review"
    • Floudas C.A., and Lin X. "Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review". Comput. Chem. Eng. 28 (2004) 2109-2129
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 2109-2129
    • Floudas, C.A.1    Lin, X.2
  • 2
    • 33748760882 scopus 로고    scopus 로고
    • "Continuous-time models for short-term scheduling of multipurpose batch plants: a comparative study"
    • Shaik M.A., Janak S.L., and Floudas C.A. "Continuous-time models for short-term scheduling of multipurpose batch plants: a comparative study". Ind. Eng. Chem. Res 45 (2006) 6190-6209
    • (2006) Ind. Eng. Chem. Res , vol.45 , pp. 6190-6209
    • Shaik, M.A.1    Janak, S.L.2    Floudas, C.A.3
  • 3
    • 33748102266 scopus 로고    scopus 로고
    • "State-of-the-art review of optimization methods for short-term scheduling of batch processes"
    • Mendez C.A., Cerda J., Grossmann I.E., Harjunkoski I., and Fahl M. "State-of-the-art review of optimization methods for short-term scheduling of batch processes". Comput. Chem. Eng. 30 (2006) 913-946
    • (2006) Comput. Chem. Eng. , vol.30 , pp. 913-946
    • Mendez, C.A.1    Cerda, J.2    Grossmann, I.E.3    Harjunkoski, I.4    Fahl, M.5
  • 4
    • 0037635200 scopus 로고    scopus 로고
    • "New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants"
    • Maravelias C.T., and Grossmann I.E. "New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants". Ind. Eng. Chem. Res. 42 (2003) 3056-3074
    • (2003) Ind. Eng. Chem. Res. , vol.42 , pp. 3056-3074
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 5
    • 0035795519 scopus 로고    scopus 로고
    • "An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants"
    • Castro P., Barbosa-Povoa A.P.F.D., and Matos H. "An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants". Ind. Eng. Chem. Res. 40 (2001) 2059-2068
    • (2001) Ind. Eng. Chem. Res. , vol.40 , pp. 2059-2068
    • Castro, P.1    Barbosa-Povoa, A.P.F.D.2    Matos, H.3
  • 6
    • 0032216021 scopus 로고    scopus 로고
    • "Effective continuous-time formulation for short-term scheduling ·1· multipurpose batch process"
    • Ierapetritou M.G., and Floudas C.A. "Effective continuous-time formulation for short-term scheduling ·1· multipurpose batch process". Ind. Eng. Chem. Res. 37 11 (1998) 4341-4359
    • (1998) Ind. Eng. Chem. Res. , vol.37 , Issue.11 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 7
    • 0036568989 scopus 로고    scopus 로고
    • "A simple new continuous-time formulation for short-term scheduling of multipurpose batch processes"
    • Giannelos N.F., and Georgiadis M.C. "A simple new continuous-time formulation for short-term scheduling of multipurpose batch processes". Ind. Eng. Chem. Res. 41 (2002) 2178-2184
    • (2002) Ind. Eng. Chem. Res. , vol.41 , pp. 2178-2184
    • Giannelos, N.F.1    Georgiadis, M.C.2
  • 8
    • 15344346066 scopus 로고    scopus 로고
    • "A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants"
    • Sundaramoorthy A., and Karimi I.A. "A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants". Chem. Eng. Sci. 60 (2005) 2679-2702
    • (2005) Chem. Eng. Sci. , vol.60 , pp. 2679-2702
    • Sundaramoorthy, A.1    Karimi, I.A.2
  • 9
    • 54249168482 scopus 로고    scopus 로고
    • "A novel precedence-based and heuristic approach for short-term scheduling of multipurpose batch plants"
    • Pan M., Qian Y., and Li X. "A novel precedence-based and heuristic approach for short-term scheduling of multipurpose batch plants". Chem. Eng. Sci. 63 (2008) 4313-4332
    • (2008) Chem. Eng. Sci. , vol.63 , pp. 4313-4332
    • Pan, M.1    Qian, Y.2    Li, X.3
  • 10
    • 33745297996 scopus 로고    scopus 로고
    • "Modified MILP model for scheduling of sequential multipurpose batch plants"
    • (in Chinese).
    • Pan M., Qian Y., and Li X. "Modified MILP model for scheduling of sequential multipurpose batch plants". J. Chem. Ind. Eng. (China) 57 4 (2006) 861-866 (in Chinese).
    • (2006) J. Chem. Ind. Eng. (China) , vol.57 , Issue.4 , pp. 861-866
    • Pan, M.1    Qian, Y.2    Li, X.3
  • 11
    • 0346341169 scopus 로고    scopus 로고
    • "A new continuous-time MILP model for scheduling of multi-product batch plants"
    • (in Chinese).
    • Wu J., He X., Chen B., and Qiu T. "A new continuous-time MILP model for scheduling of multi-product batch plants". J. Chem. Ind. Eng. (China) 54 9 (2003) 1251-1256 (in Chinese).
    • (2003) J. Chem. Ind. Eng. (China) , vol.54 , Issue.9 , pp. 1251-1256
    • Wu, J.1    He, X.2    Chen, B.3    Qiu, T.4
  • 12
    • 0027545176 scopus 로고
    • "A general algorithm for short-term scheduling of batch operations. Part 1. MILP formulation"
    • Kondili E., Pantelides C.C., and Sargent R.W.H. "A general algorithm for short-term scheduling of batch operations. Part 1. MILP formulation". Comput. Chem. Eng. 17 (1993) 211-227
    • (1993) Comput. Chem. Eng. , vol.17 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 13
    • 0000763707 scopus 로고
    • "Unified frameworks for optimal process planning and scheduling"
    • Cache Publications, New York
    • Pantelides C.C. "Unified frameworks for optimal process planning and scheduling". Foundations of Computer-aided Process Operations (1994), Cache Publications, New York 253-274
    • (1994) Foundations of Computer-aided Process Operations , pp. 253-274
    • Pantelides, C.C.1
  • 14
    • 0027545175 scopus 로고
    • "A general algorithm for short-term scheduling of batch operations (II) Computational issues"
    • Shah N., Pantelides C.C., and Sargent W.H. "A general algorithm for short-term scheduling of batch operations (II) Computational issues". Comput. Chem. Eng. 2 (1993) 229-244
    • (1993) Comput. Chem. Eng. , vol.2 , pp. 229-244
    • Shah, N.1    Pantelides, C.C.2    Sargent, W.H.3
  • 15
    • 0031140322 scopus 로고    scopus 로고
    • "A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines"
    • Cerda J., Henning G.P., and Grossmann I.E. "A mixed-integer linear programming model for short-term scheduling of single-stage multiproduct batch plants with parallel lines". Ind. Eng. Chem. Res. 36 (1997) 1695-1707
    • (1997) Ind. Eng. Chem. Res. , vol.36 , pp. 1695-1707
    • Cerda, J.1    Henning, G.P.2    Grossmann, I.E.3
  • 16
    • 2442495043 scopus 로고    scopus 로고
    • "An MILP continuous-time framework for short-term scheduling of multipurpose batch processes under different operation strategies"
    • Mendez C.A., and Cerda J. "An MILP continuous-time framework for short-term scheduling of multipurpose batch processes under different operation strategies". Optimization and Engineering 4 (2003) 7-22
    • (2003) Optimization and Engineering , vol.4 , pp. 7-22
    • Mendez, C.A.1    Cerda, J.2
  • 17
    • 0001690679 scopus 로고
    • "Continuous time mixed integer linear programming model for short term scheduling of multistage batch plants"
    • Pinto J.M., and Grossmann I.E. "Continuous time mixed integer linear programming model for short term scheduling of multistage batch plants". Ind. Eng. Chem. Res. 34 9 (1995) 3037-3051
    • (1995) Ind. Eng. Chem. Res. , vol.34 , Issue.9 , pp. 3037-3051
    • Pinto, J.M.1    Grossmann, I.E.2
  • 18
    • 0037138682 scopus 로고    scopus 로고
    • "Scheduling parallel production lines with resource constraints (1) Model formulation"
    • Lamba N., and Karimi L.A. "Scheduling parallel production lines with resource constraints (1) Model formulation". Ind. Eng. Chem. Res. 41 (2002) 779-789
    • (2002) Ind. Eng. Chem. Res. , vol.41 , pp. 779-789
    • Lamba, N.1    Karimi, L.A.2
  • 19
    • 0031190611 scopus 로고    scopus 로고
    • "Mathematical programming formulation for scheduling of batch operations based on nonuniform time discretization"
    • Mockus L., and Reklaitis G.V. "Mathematical programming formulation for scheduling of batch operations based on nonuniform time discretization". Comput. Chem. Eng. 21 (1997) 1147-1156
    • (1997) Comput. Chem. Eng. , vol.21 , pp. 1147-1156
    • Mockus, L.1    Reklaitis, G.V.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.