-
1
-
-
0000545307
-
Concurrent engineering in design-build projects
-
Anumba, C. J., and Evbuomwan, N. F. O. (1997). " Concurrent engineering in design-build projects.." Constr. Manage. Econ., 15 (3), 271-281.
-
(1997)
Constr. Manage. Econ.
, vol.15
, Issue.3
, pp. 271-281
-
-
Anumba, C.J.1
Evbuomwan, N.F.O.2
-
3
-
-
33748152382
-
Strategies for overlapping dependent design activities
-
".
-
Bogus, S., Molenaar, K., and Diekmann, J. (2006). " Strategies for overlapping dependent design activities.." Construct. Manage. Econ., 24 (8), 829-837.
-
(2006)
Construct. Manage. Econ.
, vol.24
, Issue.8
, pp. 829-837
-
-
Bogus, S.1
Molenaar, K.2
Diekmann, J.3
-
4
-
-
27644447776
-
Evaluating the consequences of overlapping dependent activities
-
", ASCE, Reston, Va.
-
Bogus, S. M., Diekmann, J. E., and Molenaar, K. R. (2005a). " Evaluating the consequences of overlapping dependent activities.." Proc., Construction Research Congress, ASCE, Reston, Va.
-
(2005)
Proc., Construction Research Congress
-
-
Bogus, S.M.1
Diekmann, J.E.2
Molenaar, K.R.3
-
5
-
-
27744532171
-
Concurrent engineering approach to reducing design delivery time
-
".
-
Bogus, S. M., Molenaar, K. R., and Diekmann, J. E. (2005b). " Concurrent engineering approach to reducing design delivery time.." J. Constr. Eng. Manage., 131 (11), 1179-1185.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.11
, pp. 1179-1185
-
-
Bogus, S.M.1
Molenaar, K.R.2
Diekmann, J.E.3
-
6
-
-
1642360820
-
Proven practices in design-build and fast-track
-
ASCE, Reston, Va..
-
Elvin, G. (2003). " Proven practices in design-build and fast-track.." Proc., Architectural Engineering 2003 Conf., ASCE, Reston, Va., 184-191.
-
(2003)
Proc., Architectural Engineering 2003 Conf.
, pp. 184-191
-
-
Elvin, G.1
-
7
-
-
15944418637
-
Embodying product and process flexibility to cope with challenging project deliveries
-
".
-
Gil, N., Tommelein, I., Art, S., and Thomas, G. (2005). " Embodying product and process flexibility to cope with challenging project deliveries.." J. Constr. Eng. Manage., 131 (4), 439-448.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.4
, pp. 439-448
-
-
Gil, N.1
Tommelein, I.2
Art, S.3
Thomas, G.4
-
9
-
-
21344463623
-
-
Center for Integrated Facility Engineering (CIFE), Stanford Univ., Stanford, Calif.
-
Koo, B., and Fischer, M. (2003). " Formalizing construction sequencing constraints for rapid generation of schedule alternatives.." Center for Integrated Facility Engineering (CIFE), Stanford Univ., Stanford, Calif.
-
(2003)
Formalizing Construction Sequencing Constraints for Rapid Generation of Schedule Alternatives
-
-
Koo, B.1
Fischer, M.2
-
10
-
-
0001660022
-
Lean construction tools and techniques
-
", R. Best and G. De Valence, eds., Butterworth-Heinemann, Oxford, U.K..
-
Koskela, L., Howell, G., Ballard, G., and Tommelein, I. (2002). " Lean construction tools and techniques.." Design and construction: Building in value, R. Best, and, G. De Valence, eds., Butterworth-Heinemann, Oxford, U.K., 227-255.
-
(2002)
Design and Construction: Building in Value
, pp. 227-255
-
-
Koskela, L.1
Howell, G.2
Ballard, G.3
Tommelein, I.4
-
11
-
-
0030147006
-
Managing the simultaneous execution of coupled phases in concurrent product development
-
Krishnan, V. (1996). " Managing the simultaneous execution of coupled phases in concurrent product development.." IEEE Trans. Eng. Manage., 43 (2), 210-217.
-
(1996)
IEEE Trans. Eng. Manage.
, vol.43
, Issue.2
, pp. 210-217
-
-
Krishnan, V.1
-
12
-
-
0031108561
-
A model-based framework to overlap product development activities
-
".
-
Krishnan, V., Eppinger, S. D., and Whitney, D. E. (1997). " A model-based framework to overlap product development activities.." Manage. Sci., 43 (4), 437-451.
-
(1997)
Manage. Sci.
, vol.43
, Issue.4
, pp. 437-451
-
-
Krishnan, V.1
Eppinger, S.D.2
Whitney, D.E.3
-
13
-
-
25444435990
-
Quality and change management model for large scale concurrent design and construction projects
-
".
-
Lee, S., Pena-Mora, F., and Park, M. (2005). " Quality and change management model for large scale concurrent design and construction projects.." J. Constr. Eng. Manage., 131 (8), 890-902.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.8
, pp. 890-902
-
-
Lee, S.1
Pena-Mora, F.2
Park, M.3
-
14
-
-
0442293795
-
Integrating project activities: The theory and practice of managing the supply chain through clusters
-
".
-
Nicolini, D., Holti, R., and Smalley, M. (2001). " Integrating project activities: The theory and practice of managing the supply chain through clusters.." Construct. Manage. Econ., 19 (1), 37-47.
-
(2001)
Construct. Manage. Econ.
, vol.19
, Issue.1
, pp. 37-47
-
-
Nicolini, D.1
Holti, R.2
Smalley, M.3
-
16
-
-
17244362051
-
Dynamic planning and control methodology for design/build fast-track construction projects
-
Pena-Mora, F., and Li, M. (2001). " Dynamic planning and control methodology for design/build fast-track construction projects.." J. Constr. Eng. Manage., 127 (1), 1-17.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.1
, pp. 1-17
-
-
Pena-Mora, F.1
Li, M.2
-
19
-
-
0032349267
-
Agile product development: Managing development flexibility in uncertain environments
-
Thomke, S., and Reinertsen, D. (1998). " Agile product development: Managing development flexibility in uncertain environments.." California Manage. Rev., 41 (1), 8-30.
-
(1998)
California Manage. Rev.
, vol.41
, Issue.1
, pp. 8-30
-
-
Thomke, S.1
Reinertsen, D.2
|