-
1
-
-
0032104987
-
A framework for applying simulation in construction
-
AbouRizk S.M. A framework for applying simulation in construction. Can. J. Civil Eng. 25 (1998) 604-617
-
(1998)
Can. J. Civil Eng.
, vol.25
, pp. 604-617
-
-
AbouRizk, S.M.1
-
2
-
-
0032179802
-
An evolutionary approach to the capital budgeting of construction projects
-
Al-Tabtabai H., and Alex A.P. An evolutionary approach to the capital budgeting of construction projects. Cost Eng., ASCE 40 (1998) 28-34
-
(1998)
Cost Eng., ASCE
, vol.40
, pp. 28-34
-
-
Al-Tabtabai, H.1
Alex, A.P.2
-
4
-
-
0028425611
-
Site layout of construction temporary facilities using an enhanced-geographic information system (GIS)
-
Cheng M.Y., and O'Connor J.T. Site layout of construction temporary facilities using an enhanced-geographic information system (GIS). Automat. Const. 3 (1994) 11-19
-
(1994)
Automat. Const.
, vol.3
, pp. 11-19
-
-
Cheng, M.Y.1
O'Connor, J.T.2
-
5
-
-
0036028136
-
Site pre-cast yard layout arrangement through genetic algorithms
-
Cheung S.O., Tong T.K.L., and Tam C.M. Site pre-cast yard layout arrangement through genetic algorithms. Automat. Const. 11 (2002) 35-46
-
(2002)
Automat. Const.
, vol.11
, pp. 35-46
-
-
Cheung, S.O.1
Tong, T.K.L.2
Tam, C.M.3
-
6
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost trade-off problems
-
Feng C.W., Liu L., and Burns S.A. Using genetic algorithms to solve construction time-cost trade-off problems. J. Const. Eng. Manage., ASCE 11 (1997) 184-189
-
(1997)
J. Const. Eng. Manage., ASCE
, vol.11
, pp. 184-189
-
-
Feng, C.W.1
Liu, L.2
Burns, S.A.3
-
7
-
-
0033315084
-
-
D. Hajjar, S.M. AbouRizk, Simphony: an environment for building special purpose construction simulation tools, in: Proceedings of the 1999 Winter Simulation Conference, Phonenix, AZ, 1999, pp. 998-1006.
-
D. Hajjar, S.M. AbouRizk, Simphony: an environment for building special purpose construction simulation tools, in: Proceedings of the 1999 Winter Simulation Conference, Phonenix, AZ, 1999, pp. 998-1006.
-
-
-
-
8
-
-
0033101918
-
Development and validation of genetic algorithm-based facility layout - a case study in the pharmaceutical industry
-
Hamamoto S., Yih Y., and Salvendy G. Development and validation of genetic algorithm-based facility layout - a case study in the pharmaceutical industry. Int. J. Prod. Res. 37 (1999) 749-768
-
(1999)
Int. J. Prod. Res.
, vol.37
, pp. 749-768
-
-
Hamamoto, S.1
Yih, Y.2
Salvendy, G.3
-
9
-
-
57749090026
-
-
A. Hamiani, CONSITE: a knowledge-based expert system framework for construction site layout, Ph.D. Thesis, University of Texas, 1987.
-
A. Hamiani, CONSITE: a knowledge-based expert system framework for construction site layout, Ph.D. Thesis, University of Texas, 1987.
-
-
-
-
10
-
-
0033156961
-
EvoSite: evolution-based model for site layout planning
-
Hegazy T., and Elbeltagi E. EvoSite: evolution-based model for site layout planning. J. Comput. Civil Eng. 13 (1999) 198-206
-
(1999)
J. Comput. Civil Eng.
, vol.13
, pp. 198-206
-
-
Hegazy, T.1
Elbeltagi, E.2
-
11
-
-
0035335808
-
Cost optimization in projects with repetitive nonserial activities
-
Hegazy T., and Wassef N. Cost optimization in projects with repetitive nonserial activities. J. Const. Eng. Manage., ASCE 127 (2001) 183-191
-
(2001)
J. Const. Eng. Manage., ASCE
, vol.127
, pp. 183-191
-
-
Hegazy, T.1
Wassef, N.2
-
12
-
-
13944255840
-
Genetic optimization for dynamic project control
-
Hegazy T., and Petzold K. Genetic optimization for dynamic project control. J. Const. Eng. Manage., ASCE 129 (2003) 396-404
-
(2003)
J. Const. Eng. Manage., ASCE
, vol.129
, pp. 396-404
-
-
Hegazy, T.1
Petzold, K.2
-
13
-
-
6344281398
-
Resource optimization using combined simulation and genetic algorithms
-
Hegazy T., and Kassab M. Resource optimization using combined simulation and genetic algorithms. J. Const. Eng. Manage., ASCE 129 (2003) 698-705
-
(2003)
J. Const. Eng. Manage., ASCE
, vol.129
, pp. 698-705
-
-
Hegazy, T.1
Kassab, M.2
-
14
-
-
3042646757
-
Neural network model incorporating a genetic algorithm in estimating construction costs
-
Kim G.H., Yoon J.E., An S.H., Cho H.H., and Kang K.I. Neural network model incorporating a genetic algorithm in estimating construction costs. Build. Environ. 39 (2004) 1333-1340
-
(2004)
Build. Environ.
, vol.39
, pp. 1333-1340
-
-
Kim, G.H.1
Yoon, J.E.2
An, S.H.3
Cho, H.H.4
Kang, K.I.5
-
15
-
-
0035193271
-
A GA-based fuzzy optimal model for construction time-cost trade-off
-
Leu S.S., Chen A.T., and Yang C.H. A GA-based fuzzy optimal model for construction time-cost trade-off. Int. J. Project Manage. 19 (2001) 47-58
-
(2001)
Int. J. Project Manage.
, vol.19
, pp. 47-58
-
-
Leu, S.S.1
Chen, A.T.2
Yang, C.H.3
-
16
-
-
0032187321
-
Site-level facilities layout using genetic algorithms
-
Li H., and Love P.E.D. Site-level facilities layout using genetic algorithms. J. Comput. Civil Eng., ASCE 12 (1998) 227-231
-
(1998)
J. Comput. Civil Eng., ASCE
, vol.12
, pp. 227-231
-
-
Li, H.1
Love, P.E.D.2
-
17
-
-
13244275240
-
Application of 4D for dynamic site layout and management of construction projects
-
Ma Z., Shen Q., and Zhang J. Application of 4D for dynamic site layout and management of construction projects. Automat. Const. 14 (2005) 369-381
-
(2005)
Automat. Const.
, vol.14
, pp. 369-381
-
-
Ma, Z.1
Shen, Q.2
Zhang, J.3
-
20
-
-
0030651628
-
-
K. McKinney, M. Fischer, 4D analysis of temporary support, in: Proceedings of the Fourth Congress Comput. Civ. Eng. (ASCE, 1997), 1997, pp. 470-476.
-
K. McKinney, M. Fischer, 4D analysis of temporary support, in: Proceedings of the Fourth Congress Comput. Civ. Eng. (ASCE, 1997), 1997, pp. 470-476.
-
-
-
-
21
-
-
0141990673
-
A hybrid CAD-based construction site layout planning system using genetic algorithms
-
Osman H.M., Georgy G.E., and Ibrahim M.E. A hybrid CAD-based construction site layout planning system using genetic algorithms. Automat. Const. 12 (2003) 749-764
-
(2003)
Automat. Const.
, vol.12
, pp. 749-764
-
-
Osman, H.M.1
Georgy, G.E.2
Ibrahim, M.E.3
-
22
-
-
57749091051
-
-
F. Sadeghpour, A CAD-based model for site layout, Ph.D. Thesis, Concordia University, 2004.
-
F. Sadeghpour, A CAD-based model for site layout, Ph.D. Thesis, Concordia University, 2004.
-
-
-
-
23
-
-
13944251756
-
Use of genetic algorithms in resource scheduling of construction projects
-
Senouci A.B., and Eldin N.N. Use of genetic algorithms in resource scheduling of construction projects. J. Const. Eng. Manage., ASCE 130 (2004) 869-877
-
(2004)
J. Const. Eng. Manage., ASCE
, vol.130
, pp. 869-877
-
-
Senouci, A.B.1
Eldin, N.N.2
-
24
-
-
0035392349
-
Genetic algorithms for optimizing supply locations around tower crane
-
Tam C.M., Tong T.K.L., and Chan W.K.W. Genetic algorithms for optimizing supply locations around tower crane. J. Const. Eng. Manage., ASCE 127 (2001) 315-321
-
(2001)
J. Const. Eng. Manage., ASCE
, vol.127
, pp. 315-321
-
-
Tam, C.M.1
Tong, T.K.L.2
Chan, W.K.W.3
-
25
-
-
2342435265
-
Site layout planning using nonstructural fuzzy decision
-
Tam C.M., Tong T.K.L., Leung A.W.T., and Chiu G.W.C. Site layout planning using nonstructural fuzzy decision. J. Const. Eng. Manage., ASCE 128 (2002) 220-231
-
(2002)
J. Const. Eng. Manage., ASCE
, vol.128
, pp. 220-231
-
-
Tam, C.M.1
Tong, T.K.L.2
Leung, A.W.T.3
Chiu, G.W.C.4
-
26
-
-
57749103528
-
-
I.D. Tommelein, SightPlan: an expert system that models and augments human decision-making for designing construction site layouts, Ph.D. Thesis, Stanford University, 1989.
-
I.D. Tommelein, SightPlan: an expert system that models and augments human decision-making for designing construction site layouts, Ph.D. Thesis, Stanford University, 1989.
-
-
-
-
28
-
-
57749087487
-
-
P.P. Zouein, MoveSchedule: a planning tool for scheduling space use on construction sites, Ph.D. Thesis, University of Michigan, 1995.
-
P.P. Zouein, MoveSchedule: a planning tool for scheduling space use on construction sites, Ph.D. Thesis, University of Michigan, 1995.
-
-
-
|