-
1
-
-
0037269099
-
Dynamic and static priority scheduling of recurring real-time tasks
-
Baruah, S. (2003) 'Dynamic and static priority scheduling of recurring real-time tasks', Real-time Systems, Vol. 24, No. 1, pp.93-128.
-
(2003)
Real-time Systems
, vol.24
, Issue.1
, pp. 93-128
-
-
Baruah, S.1
-
2
-
-
84958998377
-
Scheduling real-time tasks: Algorithms and complexity
-
Leung, J.Y-T, Ed, Chapman Hall/CRC press, ISBN: 1-58488-397-9
-
Baruah, S. and Goossens, J. (2004) 'Scheduling real-time tasks: algorithms and complexity', in Leung, J.Y-T. (Ed.): Handbook of Scheduling: Algorithms, Models and Performance Analysis, Chapman Hall/CRC press, ISBN: 1-58488-397-9.
-
(2004)
Handbook of Scheduling: Algorithms, Models and Performance Analysis
-
-
Baruah, S.1
Goossens, J.2
-
3
-
-
84958042785
-
On the complexity of scheduling conditional real-time code
-
Proc. 7th International Workshop on Algorithms and Data Structures WADS
-
Chakraborty, S., Erlebach, T. and Thiele, L. (2001) 'On the complexity of scheduling conditional real-time code', Proc. 7th International Workshop on Algorithms and Data Structures (WADS), LNCS 2125.
-
(2001)
LNCS
, vol.2125
-
-
Chakraborty, S.1
Erlebach, T.2
Thiele, L.3
-
5
-
-
35048892454
-
Applying clp to predict extra-functional properties of component-based models
-
de Boer, J.S, Ed, Springer, Heidelberg
-
Defour, O., Jezequel, J.M. and Plouzeau, N. (2004) 'Applying clp to predict extra-functional properties of component-based models', in de Boer, J.S. (Ed.): Proceedings of Logic Programming: 20th International Conference, ICLP 2004, Springer, Heidelberg.
-
(2004)
Proceedings of Logic Programming: 20th International Conference, ICLP 2004
-
-
Defour, O.1
Jezequel, J.M.2
Plouzeau, N.3
-
6
-
-
33845619469
-
Formal validation of intelligent automated production systems towards industrial applications
-
Hanisch, H.M., Lobov, A., Lastra, J.L.M., Tuokko, R. and Vyatkin, V. (2006) 'Formal validation of intelligent automated production systems towards industrial applications', International Journal of Manufacturing Technology and Management, Vol. 8, No. 1, pp.75-106.
-
(2006)
International Journal of Manufacturing Technology and Management
, vol.8
, Issue.1
, pp. 75-106
-
-
Hanisch, H.M.1
Lobov, A.2
Lastra, J.L.M.3
Tuokko, R.4
Vyatkin, V.5
-
7
-
-
57349085863
-
-
IEC1131, I.S. (1993) Programmable Controllers Part 3, Bureau Central de la commission Electrotechnique Internationale, Switzerland.
-
IEC1131, I.S. (1993) Programmable Controllers Part 3, Bureau Central de la commission Electrotechnique Internationale, Switzerland.
-
-
-
-
8
-
-
57349148034
-
-
IEC61499, I.S. (2004) Industrial Process Measurements and Control Systems, International Electrotechnical Commission (IEC), Committee Draft.
-
IEC61499, I.S. (2004) Industrial Process Measurements and Control Systems, International Electrotechnical Commission (IEC), Committee Draft.
-
-
-
-
10
-
-
41649112769
-
A behaviour model for iec 61499 function blocks
-
Denmark
-
Khalgui, M., Rebeuf, X. and Simonot-Lion, F. (2004a) 'A behaviour model for iec 61499 function blocks', Third International Workshop on Modelling of Objects, Components, and Agents (MOCA04), Denmark.
-
(2004)
Third International Workshop on Modelling of Objects, Components, and Agents (MOCA04)
-
-
Khalgui, M.1
Rebeuf, X.2
Simonot-Lion, F.3
-
11
-
-
41649085607
-
A contribution to the validation of complex real-time systems
-
Tunisie
-
Khalgui, M., Rebeuf, X. and Simonot-Lion, F. (2004b) 'A contribution to the validation of complex real-time systems', Second International IEEE Conference on Electronics, Computer Science and Telecommunication (SETIT 2004), Tunisie.
-
(2004)
Second International IEEE Conference on Electronics, Computer Science and Telecommunication (SETIT 2004)
-
-
Khalgui, M.1
Rebeuf, X.2
Simonot-Lion, F.3
-
17
-
-
0020271514
-
On the complexity of fixed-priority scheduling of periodic real-time tasks
-
Leung, J. and Whitehead, J. (1982) 'On the complexity of fixed-priority scheduling of periodic real-time tasks', Performance Evaluation, Vol. 2, pp.237-250.
-
(1982)
Performance Evaluation
, vol.2
, pp. 237-250
-
-
Leung, J.1
Whitehead, J.2
-
19
-
-
63149120316
-
Development process for distributed automation systems combining uml and iec 61499
-
Inderscience Publishers
-
Panjaitan, S. and Frey, G. (2007) 'Development process for distributed automation systems combining uml and iec 61499', International Journal of Manufacturing Research, Inderscience Publishers, Vol. 2, No. 1, pp.1-20.
-
(2007)
International Journal of Manufacturing Research
, vol.2
, Issue.1
, pp. 1-20
-
-
Panjaitan, S.1
Frey, G.2
-
20
-
-
34447579908
-
Behaviour analysis and resource optimisation for an industrial system
-
Sharma, R.K., Kumar, D. and Kumar, P. (2007) 'Behaviour analysis and resource optimisation for an industrial system', International Journal of Industrial Systems Engineering, Vol. 2, No. 4, pp.413-443.
-
(2007)
International Journal of Industrial Systems Engineering
, vol.2
, Issue.4
, pp. 413-443
-
-
Sharma, R.K.1
Kumar, D.2
Kumar, P.3
-
22
-
-
0003723728
-
-
Kluwer Academic Publishers, ISBN: 0792382692
-
Stankovic, J., Spuri, M. and Ramamritham, K. (2005) Deadline Scheduling for Real-Time Systems, Kluwer Academic Publishers, ISBN: 0792382692.
-
(2005)
Deadline Scheduling for Real-Time Systems
-
-
Stankovic, J.1
Spuri, M.2
Ramamritham, K.3
-
23
-
-
0029492220
-
mu-itron for small-scale embedded systems
-
Takada, H. and Sakamura, K. (1995) 'mu-itron for small-scale embedded systems', IEEE MICRO, Vol. 15, No. 6, pp.46-54.
-
(1995)
IEEE MICRO
, vol.15
, Issue.6
, pp. 46-54
-
-
Takada, H.1
Sakamura, K.2
-
24
-
-
17444374248
-
Model integrated mechatronics - towards a new paradigm in the development of manufacturing systems
-
Thramboulidis, K. (2005) 'Model integrated mechatronics - towards a new paradigm in the development of manufacturing systems', IEEE Transactions on Industrial Informatics, Vol. 1, No. 1, pp.54-61.
-
(2005)
IEEE Transactions on Industrial Informatics
, vol.1
, Issue.1
, pp. 54-61
-
-
Thramboulidis, K.1
-
25
-
-
34547619420
-
Model driven development of distributed control applications
-
Springer-Verlag
-
Thramboulidis, K., Perdikis, D. and Kantas, S. (2007) 'Model driven development of distributed control applications', The International Journal of Avanced Manufacturing Technology, Springer-Verlag, Vol. 33, Nos. 3-4, pp.233-242.
-
(2007)
The International Journal of Avanced Manufacturing Technology
, vol.33
, Issue.3-4
, pp. 233-242
-
-
Thramboulidis, K.1
Perdikis, D.2
Kantas, S.3
-
26
-
-
0029184677
-
Assigning real-time tasks and resources to distributed systems
-
Tia, T.S. and Liu, J.W.S. (1995) 'Assigning real-time tasks and resources to distributed systems', International Journal Minim and Microcomputers, Vol. 17, No. 1, pp.18-25.
-
(1995)
International Journal Minim and Microcomputers
, vol.17
, Issue.1
, pp. 18-25
-
-
Tia, T.S.1
Liu, J.W.S.2
-
27
-
-
33646818654
-
A tool supported engineering process for developing control applications
-
Tranoris, C. and Thramboulidis, K. (2006) 'A tool supported engineering process for developing control applications', Computers in Industry Vol. 57, No. 5, pp.462-472.
-
(2006)
Computers in Industry
, vol.57
, Issue.5
, pp. 462-472
-
-
Tranoris, C.1
Thramboulidis, K.2
-
28
-
-
33845686016
-
The potential impact of the iec 61499 standard on the progress of distributed intelligent automation
-
Vyatkin, V. (2006) 'The potential impact of the iec 61499 standard on the progress of distributed intelligent automation', International Journal of Manufacturing Technology and Management, Vol. 8, No. 1, pp.107-125.
-
(2006)
International Journal of Manufacturing Technology and Management
, vol.8
, Issue.1
, pp. 107-125
-
-
Vyatkin, V.1
-
30
-
-
0037296637
-
Verification of distributed control systems in intelligent manufacturing
-
Vyatkin, V. and Hanisch, H.M. (2003) 'Verification of distributed control systems in intelligent manufacturing', Journal of International Manufacturing, Vol. 14, No. 1, pp.123-136.
-
(2003)
Journal of International Manufacturing
, vol.14
, Issue.1
, pp. 123-136
-
-
Vyatkin, V.1
Hanisch, H.M.2
-
31
-
-
41549092243
-
Pre-Scheduling: Balancing between Static and Dynamic Schedulers
-
RTS-TR-02-01
-
Wang, W. and Mok, A. (2002) Pre-Scheduling: Balancing between Static and Dynamic Schedulers, UTCS Technical Report RTS-TR-02-01.
-
(2002)
UTCS Technical Report
-
-
Wang, W.1
Mok, A.2
|