메뉴 건너뛰기




Volumn , Issue , 2006, Pages 1293-1300

Component based deployment of industrial control systems: A hybrid scheduling approach

Author keywords

Component; Function blocks; PLCs; Real time; Scheduling

Indexed keywords

COMPONENT; COMPONENT BASED; EMERGING TECHNOLOGIES; EVENT TRIGGERING; FUNCTION BLOCK; FUNCTION BLOCKS; HYBRID SCHEDULING; IEC 61499 STANDARD; INDUSTRIAL CONTROL SYSTEMS; PLCS; REAL TIME; TEMPORAL BEHAVIORS;

EID: 50149106153     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ETFA.2006.355399     Document Type: Conference Paper
Times cited : (11)

References (20)
  • 4
    • 84890785983 scopus 로고    scopus 로고
    • IEC61499, International Standard IEC TC65 WG6, IEC, 2004.
    • IEC61499, International Standard IEC TC65 WG6, IEC, 2004.
  • 7
    • 84890805361 scopus 로고    scopus 로고
    • Guaranteeing End-to-End Timing Constraints by Calibrating IntermediateProcesses
    • R. Gerber, M. Saksena, and H. Hong, "Guaranteeing End-to-End Timing Constraints by Calibrating IntermediateProcesses", in IEEE Real-Time Systems Symposium, 2004.
    • (2004) IEEE Real-Time Systems Symposium
    • Gerber, R.1    Saksena, M.2    Hong, H.3
  • 8
    • 33845686324 scopus 로고    scopus 로고
    • A Timed Automata Model of IEC 61499 Basic Function Blocks Semantic
    • M. Stanica and H. Guguen, "A Timed Automata Model of IEC 61499 Basic Function Blocks Semantic", in ECRTS'03, 2003.
    • (2003) ECRTS'03
    • Stanica, M.1    Guguen, H.2
  • 10
    • 50149091121 scopus 로고    scopus 로고
    • A schedulability analysis of an IEC 61499 control application
    • M. Khalgui, X. Rebeuf, and F. Simonot-Lion, "A schedulability analysis of an IEC 61499 control application", in Fet. Mexico, 2005.
    • (2005) Fet. Mexico
    • Khalgui, M.1    Rebeuf, X.2    Simonot-Lion, F.3
  • 11
    • 79961188825 scopus 로고    scopus 로고
    • A degraded scheduling generation of a component based application
    • M. Khalgui, X. Rebeuf, and F. Simonot-Lion, "A degraded scheduling generation of a component based application", in Incom. France, 2006.
    • (2006) Incom. France
    • Khalgui, M.1    Rebeuf, X.2    Simonot-Lion, F.3
  • 12
    • 41549092243 scopus 로고    scopus 로고
    • Pre-Scheduling: Balancing Between Static and Dynamic Schedulers
    • RTS-TR-02-01
    • W. Wang and A.-K. Mok, Pre-Scheduling: Balancing Between Static and Dynamic Schedulers, UTCS Technical Report RTS-TR-02-01.
    • UTCS Technical Report
    • Wang, W.1    Mok, A.-K.2
  • 13
    • 0037269099 scopus 로고    scopus 로고
    • Dynamic and static priority scheduling of recurring real-time tasks
    • S. Baruah, Dynamic and static priority scheduling of recurring real-time tasks, Real-time Systems. 24 (1), pp. 93-128., 2003.
    • (2003) Real-time Systems , vol.24 , Issue.1 , pp. 93-128
    • Baruah, S.1
  • 15
    • 0029237437 scopus 로고
    • Non-preemptive scheduling of messages on controller area network for real-time control applications
    • K.-M. Zuberi and K.-G. Shin, "Non-preemptive scheduling of messages on controller area network for real-time control applications", in Real-Time Technology and Applications Symposium, 1995.
    • (1995) Real-Time Technology and Applications Symposium
    • Zuberi, K.-M.1    Shin, K.-G.2
  • 16
    • 84974687699 scopus 로고
    • Scheduling Algorithms for Multiprogramming in Hard Real-Time Environment
    • C.-L. Liu and L. Layland, Scheduling Algorithms for Multiprogramming in Hard Real-Time Environment, Journal of the ACM 20, 46-61, 1973.
    • (1973) Journal of the ACM , vol.20 , pp. 46-61
    • Liu, C.-L.1    Layland, L.2
  • 17
    • 41549143136 scopus 로고    scopus 로고
    • A schedulability condition of an IEC 61499 control application with limited buffers
    • M. Khalgui, X. Rebeuf, and F. Simonot-Lion, "A schedulability condition of an IEC 61499 control application with limited buffers", in omer 05. Germany, 2006.
    • (2006) omer 05. Germany
    • Khalgui, M.1    Rebeuf, X.2    Simonot-Lion, F.3
  • 18
    • 0003747969 scopus 로고    scopus 로고
    • Real-Time Systems
    • J. Liu, "Real-Time Systems", in Prentice Hall, 2000.
    • (2000) Prentice Hall
    • Liu, J.1
  • 19
    • 0029492220 scopus 로고
    • ITRONfor Small-Scale Embedded Systems
    • H. Takada and K. Sakamura, ITRONfor Small-Scale Embedded Systems, IEEE MICRO, vol.15, no.6, pp.46-54, 1995.
    • (1995) IEEE MICRO , vol.15 , Issue.6 , pp. 46-54
    • Takada, H.1    Sakamura, K.2
  • 20
    • 0020271514 scopus 로고
    • On the complexity of fixed-priority scheduling of periodic real-time tasks
    • J. Leung and J. Whitehead, On the complexity of fixed-priority scheduling of periodic real-time tasks, Performance Evaluation 2 (1982), 237250., 1982.
    • (1982) Performance Evaluation , vol.2 , pp. 237250
    • Leung, J.1    Whitehead, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.