메뉴 건너뛰기




Volumn , Issue , 2006, Pages

A heuristic based method for automatic deployment of distributed component based applications

Author keywords

Components; Control systems; Deployment; Real time; Scheduling

Indexed keywords

COMPUTER OPERATING SYSTEMS; COMPUTER PROGRAMMING LANGUAGES; EMBEDDED SYSTEMS; HEURISTIC PROGRAMMING; INDUSTRIAL ENGINEERING; INTEGRATED CIRCUITS; SHELTERS (FROM ATTACK); STANDARDS;

EID: 46149107073     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/IES.2006.357471     Document Type: Conference Paper
Times cited : (7)

References (30)
  • 1
    • 17444374248 scopus 로고    scopus 로고
    • Model Integrated Mechatronics - Towards a new Paradigm in the Development of Manufacturing Systems
    • K. Thramboulidis, "Model Integrated Mechatronics - Towards a new Paradigm in the Development of Manufacturing Systems", in IEEE Transactions on Industrial Informatics. Vol 1., 2005.
    • (2005) IEEE Transactions on Industrial Informatics , vol.1
    • Thramboulidis, K.1
  • 2
    • 84902332390 scopus 로고    scopus 로고
    • Applying CLP to Predict Extra-Functional Properties of ComponentBased Models
    • O. Defour, J. M. Jzquel, and N. Plouzeau, "Applying CLP to Predict Extra-Functional Properties of ComponentBased Models", in ICLP, 2004.
    • (2004) ICLP
    • Defour, O.1    Jzquel, J.M.2    Plouzeau, N.3
  • 5
    • 46149111834 scopus 로고    scopus 로고
    • Industrial Process Measurements and Control Systems
    • 6
    • I. S. I. T. WG6, "Industrial Process Measurements and Control Systems", in Committee Draft, 2004.
    • (2004) Committee Draft
    • WG, I.S.I.T.1
  • 11
    • 41549158821 scopus 로고    scopus 로고
    • A hybrid scheduling approach of centralized component based applications
    • Italy
    • M. Khalgui, X. Rebeuf, and F. Simonot-Lion, "A hybrid scheduling approach of centralized component based applications", in WFCS2006. Italy., 2006.
    • (2006) WFCS2006
    • Khalgui, M.1    Rebeuf, X.2    Simonot-Lion, F.3
  • 13
    • 46149088858 scopus 로고    scopus 로고
    • I. S. I. 1131-3, Programmable Controllers Part 3, in Bureau Central de la commission Electrotechnique Internationale. Switzerland., 1993.
    • I. S. I. 1131-3, "Programmable Controllers Part 3", in Bureau Central de la commission Electrotechnique Internationale. Switzerland., 1993.
  • 14
    • 0029237437 scopus 로고
    • Non-preemptive scheduling of messages on controller area network for real-time control applications
    • Pages
    • K. M. Zuberi and K. G. Shin, "Non-preemptive scheduling of messages on controller area network for real-time control applications", in Real-Time Technology and Applications Symposium. Page(s):240-249., 1995.
    • (1995) Real-Time Technology and Applications Symposium , pp. 240-249
    • Zuberi, K.M.1    Shin, K.G.2
  • 15
    • 0029492220 scopus 로고
    • mu-ITRON for Small-Scale Embedded Systems
    • H. Takada and K. Sakamura, "mu-ITRON for Small-Scale Embedded Systems", in IEEE MICRO, vol.15, no.6, pp.46-54, 1995.
    • (1995) IEEE MICRO , vol.15 , Issue.6 , pp. 46-54
    • Takada, H.1    Sakamura, K.2
  • 16
    • 46149087439 scopus 로고
    • Multiporocessor scheduling of processes with Release Times, Deadlines, Precedence, and Excusion Relations
    • J. Xu, "Multiporocessor scheduling of processes with Release Times, Deadlines, Precedence, and Excusion Relations", in ACM Computing Surveys, vol. 31, No. 4., 1993.
    • (1993) ACM Computing Surveys , vol.31 , Issue.4
    • Xu, J.1
  • 18
    • 0026865757 scopus 로고
    • Allocating hard real-time tasks (an np-hard problem made easy
    • K. Tindell, A. Burns, and A. Wellings, "Allocating hard real-time tasks (an np-hard problem made easy", in Real-Time Systems, vol. 4, no. 2, pp. 145-165, 1992.
    • (1992) Real-Time Systems , vol.4 , Issue.2 , pp. 145-165
    • Tindell, K.1    Burns, A.2    Wellings, A.3
  • 19
    • 0000204466 scopus 로고    scopus 로고
    • Assignment and Scheduling Communicating Periodic Tasks in Distributed Real-Time Systems
    • D. T. Peng, K. G. Shin, and T. F. Abdelzaher, "Assignment and Scheduling Communicating Periodic Tasks in Distributed Real-Time Systems", in IEEE Transactions on Soft-ware Engineering. Vol. 23. No 12., 1997.
    • (1997) IEEE Transactions on Soft-ware Engineering , vol.23 , Issue.12
    • Peng, D.T.1    Shin, K.G.2    Abdelzaher, T.F.3
  • 20
    • 0002050141 scopus 로고    scopus 로고
    • Static Scheduling Algorithms for Allocating Directed Task Graphs to Multiprocessors
    • Y. K. Kwok and I. Ahmad, "Static Scheduling Algorithms for Allocating Directed Task Graphs to Multiprocessors", in ACM Computing Surveys, vol. 31, No. 4., 1999.
    • (1999) ACM Computing Surveys , vol.31 , Issue.4
    • Kwok, Y.K.1    Ahmad, I.2
  • 21
    • 46149089561 scopus 로고    scopus 로고
    • Function Blocks for Industrial Process Measurements and Control Systems
    • 6
    • I. S. I. T. WG6, "Function Blocks for Industrial Process Measurements and Control Systems", in Committee Draft, 2003.
    • (2003) Committee Draft
    • WG, I.S.I.T.1
  • 22
    • 41549140046 scopus 로고    scopus 로고
    • A tolerant temporal validation of components based applications
    • France
    • M. Khalgui, X. Rebeuf, and F. Simonot-Lion, "A tolerant temporal validation of components based applications", in INCOM 06. France., 2006.
    • (2006) INCOM 06
    • Khalgui, M.1    Rebeuf, X.2    Simonot-Lion, F.3
  • 23
    • 41549146199 scopus 로고    scopus 로고
    • A schedulability analysis of an IEC 61499 control application
    • Mexico
    • M. Khalgui, X. Rebeuf, and F. Simonot-Lion, "A schedulability analysis of an IEC 61499 control application", in FET05. Mexico., 2005.
    • (2005) FET05
    • Khalgui, M.1    Rebeuf, X.2    Simonot-Lion, F.3
  • 24
    • 84974687699 scopus 로고
    • Scheduling Algorithm for Multiprogramming in a Hard Real-Time Environment
    • C. L. Liu and J. W. Layland, "Scheduling Algorithm for Multiprogramming in a Hard Real-Time Environment", in Journal of ACM 20 46-61, 1973.
    • (1973) Journal of ACM , vol.20 , pp. 46-61
    • Liu, C.L.1    Layland, J.W.2
  • 26
    • 46149083154 scopus 로고    scopus 로고
    • A schedulability condition of an IEC 61499 control application with limited buffers
    • M. Khalgui, X. Rebeuf, and F. Simonot-Lion, "A schedulability condition of an IEC 61499 control application with limited buffers", in OMER3. Germany., 2005.
    • (2005) OMER3. Germany
    • Khalgui, M.1    Rebeuf, X.2    Simonot-Lion, F.3
  • 27
    • 46149101931 scopus 로고
    • A practioner's handbook for real-time analysis. Guide to Rate Monotonic Analysis for Real-Time Systems
    • M. H. Klein, T. Ralya, B. Pollack, R. Obenza, and M. G. Harbour, "A practioner's handbook for real-time analysis. Guide to Rate Monotonic Analysis for Real-Time Systems", in Kluwer Academic Publisher, 1993.
    • (1993) Kluwer Academic Publisher
    • Klein, M.H.1    Ralya, T.2    Pollack, B.3    Obenza, R.4    Harbour, M.G.5
  • 28
    • 41549092243 scopus 로고    scopus 로고
    • Pre-Scheduling: Balancing Between Static and Dynamic Schedulers
    • RTS-TR-02-01
    • W. Wang and A. Mok, "Pre-Scheduling: Balancing Between Static and Dynamic Schedulers", in UTCS Technical Report RTS-TR-02-01.
    • UTCS Technical Report
    • Wang, W.1    Mok, A.2
  • 29
  • 30
    • 0037269099 scopus 로고    scopus 로고
    • Dynamic and static priority scheduling of recurring real-time tasks
    • S. Baruah, "Dynamic and static priority scheduling of recurring real-time tasks", in Real-time Systems. 24 (1), pp. 93-128., 2003.
    • (2003) Real-time Systems , vol.24 , Issue.1 , pp. 93-128
    • Baruah, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.