1
-
-
0035564269
-
Set-up coordination between two stages of a supply chain
-
Agnetis, A., Detti, P., Meloni, C. and Pacciarelli, D., Set-up coordination between two stages of a supply chain. Ann. Oper. Res., 2001, 107, 1532.
-
(2001)
Ann. Oper. Res
, vol.107
, pp. 1532
-
-
Agnetis, A.1
Detti, P.2
Meloni, C.3
Pacciarelli, D.4
-
3
-
-
0002134507
-
Two machine flow shop with separated sequence-independent setup times: Mean completion time criterion
-
Bagga, P.C. and Khurana, K., Two machine flow shop with separated sequence-independent setup times: mean completion time criterion. Indian J. Manage. Syst., 1986, 2, 47-57.
-
(1986)
Indian J. Manage. Syst
, vol.2
, pp. 47-57
-
-
Bagga, P.C.1
Khurana, K.2
-
4
-
-
84989725928
-
Scheduling tasks with sequencedependent processing times
-
Binaco, L., Ricciardelli, S., Rinaldi, G. and Sassano, A., Scheduling tasks with sequencedependent processing times. Naval Res. Logist., 1998, 35, 177-184.
-
(1998)
Naval Res. Logist
, vol.35
, pp. 177-184
-
-
Binaco, L.1
Ricciardelli, S.2
Rinaldi, G.3
Sassano, A.4
-
5
-
-
0002286606
-
Sequencing production on parallel machines with two magnitudes of sequence-dependent setup cost
-
Birtan, G.R. and Gilbert, S.M., Sequencing production on parallel machines with two magnitudes of sequence-dependent setup cost. J. Manuf. Oper. Manage., 1998, 3, 24-52.
-
(1998)
J. Manuf. Oper. Manage
, vol.3
, pp. 24-52
-
-
Birtan, G.R.1
Gilbert, S.M.2
-
6
-
-
0028464285
-
A study of genetic crossover operation on the layout problem
-
Chan, K.C. and Tansri, H., A study of genetic crossover operation on the layout problem. Computers & Indust. Eng., 1994, 26, 537-550.
-
(1994)
Computers & Indust. Eng
, vol.26
, pp. 537-550
-
-
Chan, K.C.1
Tansri, H.2
-
7
-
-
0041417617
-
Optimization-based manufacturing scheduling with multiple resources, setup requirements, and transfer lots
-
Chen, D., Luh, P.B., Thakur, L.S. and Moreno Jr, J., Optimization-based manufacturing scheduling with multiple resources, setup requirements, and transfer lots. IIE Trans., 2003, 35, 973-985.
-
(2003)
IIE Trans
, vol.35
, pp. 973-985
-
-
Chen, D.1
Luh, P.B.2
Thakur, L.S.3
Moreno Jr, J.4
-
8
-
-
0032120699
-
A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines
-
Chul, J.H., Kim, Y. and Kim, Y.K., A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines. Computers Oper. Res., 1998, 25, 675-690.
-
(1998)
Computers Oper. Res
, vol.25
, pp. 675-690
-
-
Chul, J.H.1
Kim, Y.2
Kim, Y.K.3
-
9
-
-
0036613006
-
-
De Castro, L.N. and von Zuben, F.J., Learning and optimization using the clonal selection principle. IEEE Trans. Evol. Computation, 2002, 6, 239-251 (Special Issue on Artificial Immune System).
-
De Castro, L.N. and von Zuben, F.J., Learning and optimization using the clonal selection principle. IEEE Trans. Evol. Computation, 2002, 6, 239-251 (Special Issue on Artificial Immune System).
-
-
-
-
10
-
-
0003018447
-
Management's new paradigms
-
October
-
Drucker, P.F., Management's new paradigms. Forbes, October 1998, 152-177.
-
(1998)
Forbes
, pp. 152-177
-
-
Drucker, P.F.1
-
12
-
-
0017918132
-
Flow shop and job shop scheduling
-
Gonzalez, T. and Sahni, S., Flow shop and job shop scheduling. Oper. Res., 1978, 26, 36-52.
-
(1978)
Oper. Res
, vol.26
, pp. 36-52
-
-
Gonzalez, T.1
Sahni, S.2
-
13
-
-
0020781625
-
On flow shop scheduling with release and due dates to minimize maximum lateness
-
Grabowski, J., Skubalska, E. and Smutnicki, C., On flow shop scheduling with release and due dates to minimize maximum lateness. J. Oper. Res. Soc., 1983, 34, 615-620.
-
(1983)
J. Oper. Res. Soc
, vol.34
, pp. 615-620
-
-
Grabowski, J.1
Skubalska, E.2
Smutnicki, C.3
-
14
-
-
0030134958
-
A survey of machine scheduling problem with blocking and no-wait in process
-
Hall, N.G. and Sriskandrajah, C., A survey of machine scheduling problem with blocking and no-wait in process. Oper. Res., 1996, 44, 510-525.
-
(1996)
Oper. Res
, vol.44
, pp. 510-525
-
-
Hall, N.G.1
Sriskandrajah, C.2
-
15
-
-
0037146390
-
a critical review and recommendations
-
Empirical research on supply chain management
-
Ho, D.C.K., Au, K.F. and Newton, E., Empirical research on supply chain management: a critical review and recommendations. Int. J. Prod. Res., 2002, 40, 4415-4430.
-
(2002)
Int. J. Prod. Res
, vol.40
, pp. 4415-4430
-
-
Ho, D.C.K.1
Au, K.F.2
Newton, E.3
-
16
-
-
0028462998
-
Impact of sequence-dependent setup-times on job shop scheduling performance
-
Kim, S.C. and Bobrowski, P.M., Impact of sequence-dependent setup-times on job shop scheduling performance. Int. J. Prod. Res., 1994, 32, 1503-1520.
-
(1994)
Int. J. Prod. Res
, vol.32
, pp. 1503-1520
-
-
Kim, S.C.1
Bobrowski, P.M.2
-
17
-
-
26444479778
-
Optimization by simulated annealing
-
Kirkpatrick, S., Gelatt, C.D. and Vecchi, M.P., Optimization by simulated annealing. Science, 1983, 220, 671-678.
-
(1983)
Science
, vol.220
, pp. 671-678
-
-
Kirkpatrick, S.1
Gelatt, C.D.2
Vecchi, M.P.3
-
18
-
-
0033634592
-
Issue in supply chain
-
Lambert, D.M. and Copper, M.C., Issue in supply chain. Indust. Market. Manage., 2000, 29, 65-83.
-
(2000)
Indust. Market. Manage
, vol.29
, pp. 65-83
-
-
Lambert, D.M.1
Copper, M.C.2
-
19
-
-
27844495113
-
Coordination of set-ups between two stages of a supply chain using multiobjective genetic algorithm
-
Mansouri, S.A., Coordination of set-ups between two stages of a supply chain using multiobjective genetic algorithm. Int. J. Prod. Res., 2005a, 43, 3163-3180.
-
(2005)
Int. J. Prod. Res
, vol.43
, pp. 3163-3180
-
-
Mansouri, S.A.1
-
20
-
-
13544275547
-
A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines
-
Mansouri, S.A., A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines. Euro. J. Oper. Res., 2005b, 167, 696-716.
-
(2005)
Euro. J. Oper. Res
, vol.167
, pp. 696-716
-
-
Mansouri, S.A.1
-
21
-
-
0034664135
-
Using genetic algorithms to solve the multi-product JIT sequencing problem with set-ups
-
McMullen, P.R., Tarasewich, P. and Frazier, G.V., Using genetic algorithms to solve the multi-product JIT sequencing problem with set-ups. Int. J. Prod. Res., 2000, 38, 2653-2670.
-
(2000)
Int. J. Prod. Res
, vol.38
, pp. 2653-2670
-
-
McMullen, P.R.1
Tarasewich, P.2
Frazier, G.V.3
-
22
-
-
0036642607
-
Supply chain modeling: Past, present and future
-
Min, H. and Zhou, G., Supply chain modeling: past, present and future. Computer & Indust. Eng., 2002, 43, 231-249.
-
(2002)
Computer & Indust. Eng
, vol.43
, pp. 231-249
-
-
Min, H.1
Zhou, G.2
-
23
-
-
0032649738
-
The permutation flow shop with buffers: A tabu search approach
-
Nowicki, E., The permutation flow shop with buffers: a tabu search approach. Euro. J. Oper. Res., 1999, 166, 205-219.
-
(1999)
Euro. J. Oper. Res
, vol.166
, pp. 205-219
-
-
Nowicki, E.1
-
24
-
-
84976662527
-
Flow-shop scheduling with limited temporary storage
-
Papadimitriou, C. and Kanellakis, P., Flow-shop scheduling with limited temporary storage. J. Assoe. Computing Much., 1980, 27, 533-549.
-
(1980)
J. Assoe. Computing Much
, vol.27
, pp. 533-549
-
-
Papadimitriou, C.1
Kanellakis, P.2
-
25
-
-
0031234631
-
Heuristics for scheduling in a flow shop with setup, processing and removal times separated
-
Rajendra, C. and Ziegler, H., Heuristics for scheduling in a flow shop with setup, processing and removal times separated. Prod. Plan. & Cont., 1997, 8, 568-576.
-
(1997)
Prod. Plan. & Cont
, vol.8
, pp. 568-576
-
-
Rajendra, C.1
Ziegler, H.2
-
26
-
-
0015401303
-
On the flow shop sequencing problem with no-wait in process
-
Reddi, S.S. and Ramamoorthy, C.V., On the flow shop sequencing problem with no-wait in process. Oper. Res. Quart., 1972, 23, 323-330.
-
(1972)
Oper. Res. Quart
, vol.23
, pp. 323-330
-
-
Reddi, S.S.1
Ramamoorthy, C.V.2
-
27
-
-
0033720051
-
Scheduling a flow line manufacturing cell with sequence dependent family setup times
-
Schaller, J.E., Gupta, J.N.D. and Vakharia, A.J., Scheduling a flow line manufacturing cell with sequence dependent family setup times. Euro. J. Oper. Res., 2000, 125, 324-339.
-
(2000)
Euro. J. Oper. Res
, vol.125
, pp. 324-339
-
-
Schaller, J.E.1
Gupta, J.N.D.2
Vakharia, A.J.3
-
29
-
-
0022806444
-
A MILP model for the n-job, m-stage flow shop, with sequencedependent setup times
-
Srikar, B.N. and Ghosh, S., A MILP model for the n-job, m-stage flow shop, with sequencedependent setup times. Int. J. Prod. Res., 1986, 24, 1459-1472.
-
(1986)
Int. J. Prod. Res
, vol.24
, pp. 1459-1472
-
-
Srikar, B.N.1
Ghosh, S.2
-
30
-
-
12844261034
-
Determination of an optimal assembly sequence using the Psychoclonal algorithm
-
Tiwari, M.K., Prakash Kumar, A. and Mileham, A.R., Determination of an optimal assembly sequence using the Psychoclonal algorithm. IMechE J. Eng. Munuf., Part B, 2005, 219, 137-149.
-
(2005)
IMechE J. Eng. Munuf., Part B
, vol.219
, pp. 137-149
-
-
Tiwari, M.K.1
Prakash Kumar, A.2
Mileham, A.R.3
-
31
-
-
0026841915
-
Scheduling semiconductor test operations: Minimising maximum lateness and number of tardy jobs on a single machine
-
Uzsoy, R., Lee, C. and Martin-Vega, A., Scheduling semiconductor test operations: minimising maximum lateness and number of tardy jobs on a single machine. Naval Res. Logist., 1992, 39, 369-388.
-
(1992)
Naval Res. Logist
, vol.39
, pp. 369-388
-
-
Uzsoy, R.1
Lee, C.2
Martin-Vega, A.3
|