메뉴 건너뛰기




Volumn 47, Issue 4, 2009, Pages 1015-1037

Integrated model for the batch sequencing problem in a multi-stage supply chain: An artificial immune system based approach

Author keywords

Artificial immune system (AIS); Lead time; Multistage supply chain

Indexed keywords

GENETIC ALGORITHMS; IMMUNOLOGY; SUPPLY CHAIN MANAGEMENT; SUPPLY CHAINS;

EID: 57049119660     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540601158807     Document Type: Article
Times cited : (13)

References (31)
  • 1
    • 0035564269 scopus 로고    scopus 로고
    • Set-up coordination between two stages of a supply chain
    • Agnetis, A., Detti, P., Meloni, C. and Pacciarelli, D., Set-up coordination between two stages of a supply chain. Ann. Oper. Res., 2001, 107, 1532.
    • (2001) Ann. Oper. Res , vol.107 , pp. 1532
    • Agnetis, A.1    Detti, P.2    Meloni, C.3    Pacciarelli, D.4
  • 3
    • 0002134507 scopus 로고
    • Two machine flow shop with separated sequence-independent setup times: Mean completion time criterion
    • Bagga, P.C. and Khurana, K., Two machine flow shop with separated sequence-independent setup times: mean completion time criterion. Indian J. Manage. Syst., 1986, 2, 47-57.
    • (1986) Indian J. Manage. Syst , vol.2 , pp. 47-57
    • Bagga, P.C.1    Khurana, K.2
  • 5
    • 0002286606 scopus 로고    scopus 로고
    • Sequencing production on parallel machines with two magnitudes of sequence-dependent setup cost
    • Birtan, G.R. and Gilbert, S.M., Sequencing production on parallel machines with two magnitudes of sequence-dependent setup cost. J. Manuf. Oper. Manage., 1998, 3, 24-52.
    • (1998) J. Manuf. Oper. Manage , vol.3 , pp. 24-52
    • Birtan, G.R.1    Gilbert, S.M.2
  • 6
    • 0028464285 scopus 로고
    • A study of genetic crossover operation on the layout problem
    • Chan, K.C. and Tansri, H., A study of genetic crossover operation on the layout problem. Computers & Indust. Eng., 1994, 26, 537-550.
    • (1994) Computers & Indust. Eng , vol.26 , pp. 537-550
    • Chan, K.C.1    Tansri, H.2
  • 7
    • 0041417617 scopus 로고    scopus 로고
    • Optimization-based manufacturing scheduling with multiple resources, setup requirements, and transfer lots
    • Chen, D., Luh, P.B., Thakur, L.S. and Moreno Jr, J., Optimization-based manufacturing scheduling with multiple resources, setup requirements, and transfer lots. IIE Trans., 2003, 35, 973-985.
    • (2003) IIE Trans , vol.35 , pp. 973-985
    • Chen, D.1    Luh, P.B.2    Thakur, L.S.3    Moreno Jr, J.4
  • 8
    • 0032120699 scopus 로고    scopus 로고
    • A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines
    • Chul, J.H., Kim, Y. and Kim, Y.K., A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines. Computers Oper. Res., 1998, 25, 675-690.
    • (1998) Computers Oper. Res , vol.25 , pp. 675-690
    • Chul, J.H.1    Kim, Y.2    Kim, Y.K.3
  • 9
    • 0036613006 scopus 로고    scopus 로고
    • De Castro, L.N. and von Zuben, F.J., Learning and optimization using the clonal selection principle. IEEE Trans. Evol. Computation, 2002, 6, 239-251 (Special Issue on Artificial Immune System).
    • De Castro, L.N. and von Zuben, F.J., Learning and optimization using the clonal selection principle. IEEE Trans. Evol. Computation, 2002, 6, 239-251 (Special Issue on Artificial Immune System).
  • 10
    • 0003018447 scopus 로고    scopus 로고
    • Management's new paradigms
    • October
    • Drucker, P.F., Management's new paradigms. Forbes, October 1998, 152-177.
    • (1998) Forbes , pp. 152-177
    • Drucker, P.F.1
  • 12
    • 0017918132 scopus 로고
    • Flow shop and job shop scheduling
    • Gonzalez, T. and Sahni, S., Flow shop and job shop scheduling. Oper. Res., 1978, 26, 36-52.
    • (1978) Oper. Res , vol.26 , pp. 36-52
    • Gonzalez, T.1    Sahni, S.2
  • 13
    • 0020781625 scopus 로고
    • On flow shop scheduling with release and due dates to minimize maximum lateness
    • Grabowski, J., Skubalska, E. and Smutnicki, C., On flow shop scheduling with release and due dates to minimize maximum lateness. J. Oper. Res. Soc., 1983, 34, 615-620.
    • (1983) J. Oper. Res. Soc , vol.34 , pp. 615-620
    • Grabowski, J.1    Skubalska, E.2    Smutnicki, C.3
  • 14
    • 0030134958 scopus 로고    scopus 로고
    • A survey of machine scheduling problem with blocking and no-wait in process
    • Hall, N.G. and Sriskandrajah, C., A survey of machine scheduling problem with blocking and no-wait in process. Oper. Res., 1996, 44, 510-525.
    • (1996) Oper. Res , vol.44 , pp. 510-525
    • Hall, N.G.1    Sriskandrajah, C.2
  • 15
    • 0037146390 scopus 로고    scopus 로고
    • a critical review and recommendations
    • Empirical research on supply chain management
    • Ho, D.C.K., Au, K.F. and Newton, E., Empirical research on supply chain management: a critical review and recommendations. Int. J. Prod. Res., 2002, 40, 4415-4430.
    • (2002) Int. J. Prod. Res , vol.40 , pp. 4415-4430
    • Ho, D.C.K.1    Au, K.F.2    Newton, E.3
  • 16
    • 0028462998 scopus 로고
    • Impact of sequence-dependent setup-times on job shop scheduling performance
    • Kim, S.C. and Bobrowski, P.M., Impact of sequence-dependent setup-times on job shop scheduling performance. Int. J. Prod. Res., 1994, 32, 1503-1520.
    • (1994) Int. J. Prod. Res , vol.32 , pp. 1503-1520
    • Kim, S.C.1    Bobrowski, P.M.2
  • 17
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • Kirkpatrick, S., Gelatt, C.D. and Vecchi, M.P., Optimization by simulated annealing. Science, 1983, 220, 671-678.
    • (1983) Science , vol.220 , pp. 671-678
    • Kirkpatrick, S.1    Gelatt, C.D.2    Vecchi, M.P.3
  • 19
    • 27844495113 scopus 로고    scopus 로고
    • Coordination of set-ups between two stages of a supply chain using multiobjective genetic algorithm
    • Mansouri, S.A., Coordination of set-ups between two stages of a supply chain using multiobjective genetic algorithm. Int. J. Prod. Res., 2005a, 43, 3163-3180.
    • (2005) Int. J. Prod. Res , vol.43 , pp. 3163-3180
    • Mansouri, S.A.1
  • 20
    • 13544275547 scopus 로고    scopus 로고
    • A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines
    • Mansouri, S.A., A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines. Euro. J. Oper. Res., 2005b, 167, 696-716.
    • (2005) Euro. J. Oper. Res , vol.167 , pp. 696-716
    • Mansouri, S.A.1
  • 21
    • 0034664135 scopus 로고    scopus 로고
    • Using genetic algorithms to solve the multi-product JIT sequencing problem with set-ups
    • McMullen, P.R., Tarasewich, P. and Frazier, G.V., Using genetic algorithms to solve the multi-product JIT sequencing problem with set-ups. Int. J. Prod. Res., 2000, 38, 2653-2670.
    • (2000) Int. J. Prod. Res , vol.38 , pp. 2653-2670
    • McMullen, P.R.1    Tarasewich, P.2    Frazier, G.V.3
  • 22
    • 0036642607 scopus 로고    scopus 로고
    • Supply chain modeling: Past, present and future
    • Min, H. and Zhou, G., Supply chain modeling: past, present and future. Computer & Indust. Eng., 2002, 43, 231-249.
    • (2002) Computer & Indust. Eng , vol.43 , pp. 231-249
    • Min, H.1    Zhou, G.2
  • 23
    • 0032649738 scopus 로고    scopus 로고
    • The permutation flow shop with buffers: A tabu search approach
    • Nowicki, E., The permutation flow shop with buffers: a tabu search approach. Euro. J. Oper. Res., 1999, 166, 205-219.
    • (1999) Euro. J. Oper. Res , vol.166 , pp. 205-219
    • Nowicki, E.1
  • 24
    • 84976662527 scopus 로고
    • Flow-shop scheduling with limited temporary storage
    • Papadimitriou, C. and Kanellakis, P., Flow-shop scheduling with limited temporary storage. J. Assoe. Computing Much., 1980, 27, 533-549.
    • (1980) J. Assoe. Computing Much , vol.27 , pp. 533-549
    • Papadimitriou, C.1    Kanellakis, P.2
  • 25
    • 0031234631 scopus 로고    scopus 로고
    • Heuristics for scheduling in a flow shop with setup, processing and removal times separated
    • Rajendra, C. and Ziegler, H., Heuristics for scheduling in a flow shop with setup, processing and removal times separated. Prod. Plan. & Cont., 1997, 8, 568-576.
    • (1997) Prod. Plan. & Cont , vol.8 , pp. 568-576
    • Rajendra, C.1    Ziegler, H.2
  • 26
    • 0015401303 scopus 로고
    • On the flow shop sequencing problem with no-wait in process
    • Reddi, S.S. and Ramamoorthy, C.V., On the flow shop sequencing problem with no-wait in process. Oper. Res. Quart., 1972, 23, 323-330.
    • (1972) Oper. Res. Quart , vol.23 , pp. 323-330
    • Reddi, S.S.1    Ramamoorthy, C.V.2
  • 27
    • 0033720051 scopus 로고    scopus 로고
    • Scheduling a flow line manufacturing cell with sequence dependent family setup times
    • Schaller, J.E., Gupta, J.N.D. and Vakharia, A.J., Scheduling a flow line manufacturing cell with sequence dependent family setup times. Euro. J. Oper. Res., 2000, 125, 324-339.
    • (2000) Euro. J. Oper. Res , vol.125 , pp. 324-339
    • Schaller, J.E.1    Gupta, J.N.D.2    Vakharia, A.J.3
  • 29
    • 0022806444 scopus 로고
    • A MILP model for the n-job, m-stage flow shop, with sequencedependent setup times
    • Srikar, B.N. and Ghosh, S., A MILP model for the n-job, m-stage flow shop, with sequencedependent setup times. Int. J. Prod. Res., 1986, 24, 1459-1472.
    • (1986) Int. J. Prod. Res , vol.24 , pp. 1459-1472
    • Srikar, B.N.1    Ghosh, S.2
  • 30
    • 12844261034 scopus 로고    scopus 로고
    • Determination of an optimal assembly sequence using the Psychoclonal algorithm
    • Tiwari, M.K., Prakash Kumar, A. and Mileham, A.R., Determination of an optimal assembly sequence using the Psychoclonal algorithm. IMechE J. Eng. Munuf., Part B, 2005, 219, 137-149.
    • (2005) IMechE J. Eng. Munuf., Part B , vol.219 , pp. 137-149
    • Tiwari, M.K.1    Prakash Kumar, A.2    Mileham, A.R.3
  • 31
    • 0026841915 scopus 로고
    • Scheduling semiconductor test operations: Minimising maximum lateness and number of tardy jobs on a single machine
    • Uzsoy, R., Lee, C. and Martin-Vega, A., Scheduling semiconductor test operations: minimising maximum lateness and number of tardy jobs on a single machine. Naval Res. Logist., 1992, 39, 369-388.
    • (1992) Naval Res. Logist , vol.39 , pp. 369-388
    • Uzsoy, R.1    Lee, C.2    Martin-Vega, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.