-
1
-
-
56249117092
-
-
All-Island Project , online, available from
-
All-Island Project (2007). Annual Capacity Payment Sum: Final Value For 2008, [online], available from http://www.allislandproject.org /en/capacity-payments-consultation. aspx?article=4c42e4O9-l082-4b9c-b9f3-b3e0ac03f564.
-
(2007)
Annual Capacity Payment Sum: Final Value For 2008
-
-
-
2
-
-
28244446054
-
Lessons Learned: The Texas Experience
-
Griffin, J.M. and S.L. Puller, eds, Chicago, The University of Chicago Press, pp
-
Baldick, R. and H. Niu (2005). "Lessons Learned: The Texas Experience." In Griffin, J.M. and S.L. Puller, eds., Electricity Deregulation: Choices and Challenges, Chicago, The University of Chicago Press, pp. 182-224.
-
(2005)
Electricity Deregulation: Choices and Challenges
, pp. 182-224
-
-
Baldick, R.1
Niu, H.2
-
6
-
-
0021483469
-
Optimal Pricing in Electrical Networks over Space and Time
-
Bohn, R.E, M.C. Caramanis, and F.C. Schweppe, (1984). "Optimal Pricing in Electrical Networks over Space and Time", The Rand Journal of Economics, 15(3): 360-76.
-
(1984)
The Rand Journal of Economics
, vol.15
, Issue.3
, pp. 360-376
-
-
Bohn, R.E.1
Caramanis, M.C.2
Schweppe, F.C.3
-
7
-
-
18744392803
-
Electricity transmission: An overview of the current debate
-
Brunekreeft, G., K Neuhoff and D.M. Newbery (2005). "Electricity transmission: An overview of the current debate" Utilities Policy 13(2): 73-93.
-
(2005)
Utilities Policy
, vol.13
, Issue.2
, pp. 73-93
-
-
Brunekreeft, G.1
Neuhoff, K.2
Newbery, D.M.3
-
8
-
-
56349096341
-
The Spanish Electricity Industry: Plus ca change..
-
Crampes, C. and N. Fabra (2005). "The Spanish Electricity Industry: Plus ca change...", The Energy Journal, 26(Special Issue): 127-153.
-
(2005)
The Energy Journal
, vol.26
, Issue.SPEC. ISSUE
, pp. 127-153
-
-
Crampes, C.1
Fabra, N.2
-
11
-
-
37749002070
-
-
European Commission , 10 January, Brussels, European Commission
-
European Commission (2007). DG Competition Report on Energy Sector Inquiry, 10 January 2007, Brussels, European Commission.
-
(2007)
DG Competition Report on Energy Sector Inquiry
-
-
-
12
-
-
33748328103
-
-
Fabra, N., von der Fehr, N-H M., and D. Harbord (2006). Designing Electricity Auctions RAND Journal of Economics 37(1): 23-46.
-
Fabra, N., von der Fehr, N-H M., and D. Harbord (2006). "Designing Electricity Auctions" RAND Journal of Economics 37(1): 23-46.
-
-
-
-
13
-
-
56249106635
-
Notice of Proposed Rulemaking, Docket
-
Federal Energy Regulatory Commission , Washington DC, Federal Energy Regulatory Commission
-
Federal Energy Regulatory Commission (2002). Notice of Proposed Rulemaking, Docket No. RM01-12-000, issued July 31, 2002 (the "Standard Market Design"), Washington DC, Federal Energy Regulatory Commission.
-
(2002)
RM01-12-000, issued July 31, 2002 (the "Standard Market Design")
-
-
-
14
-
-
56249140555
-
The Danish Solution
-
Franken, N. (2006). "The Danish Solution," New Energy 06(6): 22-25.
-
(2006)
New Energy 06
, pp. 22-25
-
-
Franken, N.1
-
16
-
-
18744377493
-
Nordic Congestion's Arrangement as a Model for Europe? Physical Constraints vs. Economic Incentives
-
Glachant, J.-M., and V. Pignon, (2005). "Nordic Congestion's Arrangement as a Model for Europe? Physical Constraints vs. Economic Incentives", Utilities Policy 13(2): 153-162.
-
(2005)
Utilities Policy
, vol.13
, Issue.2
, pp. 153-162
-
-
Glachant, J.-M.1
Pignon, V.2
-
17
-
-
34247558200
-
Business Models for Distributed Generation in a Liberalized Market Environment
-
Gordijn, J, and H. Akkermans (2007). "Business Models for Distributed Generation in a Liberalized Market Environment", Electric Power Systems Research 77: 1178-1188.
-
(2007)
Electric Power Systems Research
, vol.77
, pp. 1178-1188
-
-
Gordijn, J.1
Akkermans, H.2
-
20
-
-
33846332300
-
-
London, Imperial College
-
Gross, R., P. Heptonstall, D. Anderson, T.C. Green, M. Leach and J. Skea (2006). The Costs and Impacts of Intermittency: An assessment of the evidence on the costs and impacts of intermittent generation on the British electricity network, London, Imperial College.
-
(2006)
The Costs and Impacts of Intermittency: An assessment of the evidence on the costs and impacts of intermittent generation on the British electricity network
-
-
Gross, R.1
Heptonstall, P.2
Anderson, D.3
Green, T.C.4
Leach, M.5
Skea, J.6
-
21
-
-
33846255767
-
Cost-effective Operating Strategy for Residential Micro-combined Heat and Power
-
Hawkes, A. and M. Leach (2007). "Cost-effective Operating Strategy for Residential Micro-combined Heat and Power", Energy, 32(5): 711-723.
-
(2007)
Energy
, vol.32
, Issue.5
, pp. 711-723
-
-
Hawkes, A.1
Leach, M.2
-
22
-
-
84882447736
-
The Design of US Wholesale and Ancillary Service Auction Markets: Theory and Practice
-
F.P. Sioshansi, ed, Oxford, Elsevier
-
Helman, U, B.F. Hobbs and R.P. O'Neill (2008). "The Design of US Wholesale and Ancillary Service Auction Markets: Theory and Practice." In F.P. Sioshansi, ed. Competitive Electricity Markets: Design, Implementation, Performance, Oxford, Elsevier.
-
(2008)
Competitive Electricity Markets: Design, Implementation, Performance
-
-
Helman, U.1
Hobbs, B.F.2
O'Neill, R.P.3
-
23
-
-
13844256376
-
-
Holttinen, H. (2005). Optimal Electricity Market for Wind Power, Energy Policy, 33(16): 2052-2063. International Energy Agency (2006) World Energy Outlook, Paris, International Energy Agency.
-
Holttinen, H. (2005). "Optimal Electricity Market for Wind Power", Energy Policy, 33(16): 2052-2063. International Energy Agency (2006) World Energy Outlook, Paris, International Energy Agency.
-
-
-
-
24
-
-
0035182160
-
California's Electricity Crisis
-
Joskow, P.L. (2001). "California's Electricity Crisis", Oxford Review of Economic Policy, 17(3): 365-388.
-
(2001)
Oxford Review of Economic Policy
, vol.17
, Issue.3
, pp. 365-388
-
-
Joskow, P.L.1
-
25
-
-
44649102724
-
Capacity payments in imperfect electricity markets: Need and design
-
Joskow, P.L. (2008). "Capacity payments in imperfect electricity markets: Need and design" Utilities Policy, 16(3): 159-170.
-
(2008)
Utilities Policy
, vol.16
, Issue.3
, pp. 159-170
-
-
Joskow, P.L.1
-
26
-
-
4043183268
-
Application of Interruptible Contracts to Increase Wind-Power Penetration in Congested Areas
-
Kabouris, J. and C.D. Vournas (2004). "Application of Interruptible Contracts to Increase Wind-Power Penetration in Congested Areas", IEEE Transactions on Power Systems, 19(3): 1642-1649.
-
(2004)
IEEE Transactions on Power Systems
, vol.19
, Issue.3
, pp. 1642-1649
-
-
Kabouris, J.1
Vournas, C.D.2
-
30
-
-
0032406366
-
The Regulator's Review of the English Electricity Pool
-
Newbery, D.M. (1998). "The Regulator's Review of the English Electricity Pool" Utilities Policy, 7(3): 129-142.
-
(1998)
Utilities Policy
, vol.7
, Issue.3
, pp. 129-142
-
-
Newbery, D.M.1
-
31
-
-
33845243454
-
Electricity liberalisation in Britain: The quest for a satisfactory wholesale market design
-
Newbery, D.M. (2005). "Electricity liberalisation in Britain: The quest for a satisfactory wholesale market design" The Energy Journal, 26(Special Issue): 43-70.
-
(2005)
The Energy Journal
, vol.26
, Issue.SPEC. ISSUE
, pp. 43-70
-
-
Newbery, D.M.1
-
32
-
-
58149292700
-
Reduce the risk of nuclear investment
-
9 January
-
Newbery, D.M. (2008). "Reduce the risk of nuclear investment" Financial Times, 9 January.
-
(2008)
Financial Times
-
-
Newbery, D.M.1
-
33
-
-
2542587411
-
Auctions and Trading in Energy Markets - An Economic Analysis
-
R Vass, ed, Centre for the Study of Regulated Industries, University of Bath, UK, pp
-
Newbery, D.M. and T.M. McDaniel (2003). "Auctions and Trading in Energy Markets - An Economic Analysis" In R Vass, ed. Regulatory Review 2002/2003 Centre for the Study of Regulated Industries, University of Bath, UK, pp. 195-234.
-
(2003)
Regulatory Review 2002/2003
, pp. 195-234
-
-
Newbery, D.M.1
McDaniel, T.M.2
-
34
-
-
56249104876
-
Market design for large shares of renewables: Time and space
-
presented at the, 16 May
-
Newbery, D.M. and K. Neuhoff (2008). "Market design for large shares of renewables: time and space" presented at the EPRG Spring Research Seminar, 16 May 2008.
-
(2008)
EPRG Spring Research Seminar
-
-
Newbery, D.M.1
Neuhoff, K.2
-
35
-
-
33947377861
-
Controlling micro-CHP Systems to Modulate Electrical Load Profiles
-
Peacock, A.D. and M. Newborough (2007). "Controlling micro-CHP Systems to Modulate Electrical Load Profiles" Energy 32(7): 1093-1103.
-
(2007)
Energy
, vol.32
, Issue.7
, pp. 1093-1103
-
-
Peacock, A.D.1
Newborough, M.2
-
37
-
-
44649117378
-
Market design for generation adequacy: Healing causes rather than symptoms
-
Roques, F.A. (2008). "Market design for generation adequacy: Healing causes rather than symptoms" Utilities Policy, 16(3):171-183.
-
(2008)
Utilities Policy
, vol.16
, Issue.3
, pp. 171-183
-
-
Roques, F.A.1
-
39
-
-
56249127253
-
-
Scottish Government (2008). Transmission of renewable energy, news release of 18 April 2008, accessed at http://www. scotland.gov.uk/News/Releases/2008/04/18085238.
-
Scottish Government (2008). "Transmission of renewable energy", news release of 18 April 2008, accessed at http://www. scotland.gov.uk/News/Releases/2008/04/18085238.
-
-
-
-
40
-
-
56249124082
-
The costs of anarchy in self-commitment markets
-
F.P. Sioshansi, ed, Oxford, Elsevier, pp
-
Sioshansi, R., S. Oren and R. O'Neill (2008). "The costs of anarchy in self-commitment markets." In F.P. Sioshansi, ed., Competitive Electricity Markets: Design, Implementation, Performance, Oxford, Elsevier, pp. 245-266.
-
(2008)
Competitive Electricity Markets: Design, Implementation, Performance
, pp. 245-266
-
-
Sioshansi, R.1
Oren, S.2
O'Neill, R.3
-
42
-
-
34247636821
-
Electric Power Systems Research on Dispersed Generation
-
Strbac, G. (2007). "Electric Power Systems Research on Dispersed Generation", Electric Power Systems Research, 77: 1143-1147.
-
(2007)
Electric Power Systems Research
, vol.77
, pp. 1143-1147
-
-
Strbac, G.1
-
43
-
-
56249136372
-
-
DTI Centre for Distributed Generation and Sustainable Electrical Energy
-
Strbac, G., D. Pudjianto, M. Castro, R Djapic, B. Stojkovska, C. Ramsay and R. Allan (2007). Transmission Investment, Access and Pricing in Systems with Wind Generation DTI Centre for Distributed Generation and Sustainable Electrical Energy.
-
(2007)
Transmission Investment, Access and Pricing in Systems with Wind Generation
-
-
Strbac, G.1
Pudjianto, D.2
Castro, M.3
Djapic, R.4
Stojkovska, B.5
Ramsay, C.6
Allan, R.7
-
45
-
-
0344927140
-
Power Struggles: Explaining Deregulatory Reforms in Electricity Markets
-
White, M. (1996). "Power Struggles: Explaining Deregulatory Reforms in Electricity Markets", Brookings Papers on Economic Activity, Microeconomics, 1996: 201-250.
-
(1996)
Brookings Papers on Economic Activity, Microeconomics
, vol.1996
, pp. 201-250
-
-
White, M.1
-
46
-
-
0003403990
-
-
Folsom, California, accessed at
-
Wolak, F.A., R. Nordhaus, and C. Shapiro (1998). Preliminary Report On the Operation of the Ancillary Services Markets of the California Independent System Operator (ISO) Prepared by the Market Surveillance Committee of the California ISO, Folsom, California, accessed at http://www.caiso.com/docs/1998/12/18/19981218064938135 77.pdf
-
(1998)
Preliminary Report On the Operation of the Ancillary Services Markets of the California Independent System Operator (ISO) Prepared by the Market Surveillance Committee of the California ISO
-
-
Wolak, F.A.1
Nordhaus, R.2
Shapiro, C.3
-
47
-
-
56249088039
-
Final Opinion on Long-Term Resource Adequacy under MRTU
-
November 5, Folsom, California
-
Wolak, F.A., J. Bushnell and B.F. Hobbs (2007). Final Opinion on "Long-Term Resource Adequacy under MRTU", Market Surveillance Committee of the California ISO, November 5, 2007, Folsom, California.
-
(2007)
Market Surveillance Committee of the California ISO
-
-
Wolak, F.A.1
Bushnell, J.2
Hobbs, B.F.3
|