메뉴 건너뛰기




Volumn 222, Issue 10, 2008, Pages 1289-1299

Life cycle and unit-cost analysis for modular reconfigurable flexible light assembly systems

Author keywords

Assembly systems design; Decision support; Economic analysis

Indexed keywords

ASSEMBLY; COST ACCOUNTING; COSTS; CUSTOMER SATISFACTION; DECISION SUPPORT SYSTEMS; DESIGN; EARNINGS; ECONOMIC ANALYSIS; LIFE CYCLE; RIVETING; SPECIFICATIONS; STANDARDIZATION; SYSTEMS ANALYSIS; THREE DIMENSIONAL;

EID: 56149106013     PISSN: 09544054     EISSN: None     Source Type: Journal    
DOI: 10.1243/09544054JEM1034     Document Type: Conference Paper
Times cited : (20)

References (41)
  • 2
    • 0035780669 scopus 로고    scopus 로고
    • Modular reconfigurable flexible final assembly systems
    • Automn
    • Heilala, J. and Voho, P. Modular reconfigurable flexible final assembly systems. Assembly Automn, 2001, 21(1), 20-28.
    • (2001) Assembly , vol.21 , Issue.1 , pp. 20-28
    • Heilala, J.1    Voho, P.2
  • 4
    • 0012502503 scopus 로고    scopus 로고
    • Doctoral Thesis, Division of Assembly Systems, Department of Production Engineering, Royal Institute of Technology, Stockholm
    • Eskillander, S. Design for automatic assembly. A method for product design: DFA2. Doctoral Thesis, Division of Assembly Systems, Department of Production Engineering, Royal Institute of Technology, Stockholm, 2001.
    • (2001) Design for automatic assembly. A method for product design: DFA2
    • Eskillander, S.1
  • 10
    • 40949098659 scopus 로고    scopus 로고
    • Wehrli, F., Duffey, S., Koelemeijer Chollet, S., and Jacot, J. A decision making tool for reconfigurable assembly lines - Eupass project. In IFIP International Federation for Information Processing, 260, Micro assembly technologies and applications (Eds S. Ratchev and S. Koelemeijer), 2008, pp. 353-358 (Springer, Boston, Massachusetts). Presented in IPAS 2008, International Precision Assembly Seminar, Chamonix, France, 11-13 February 2008.
    • Wehrli, F., Duffey, S., Koelemeijer Chollet, S., and Jacot, J. A decision making tool for reconfigurable assembly lines - Eupass project. In IFIP International Federation for Information Processing, vol. 260, Micro assembly technologies and applications (Eds S. Ratchev and S. Koelemeijer), 2008, pp. 353-358 (Springer, Boston, Massachusetts). Presented in IPAS 2008, International Precision Assembly Seminar, Chamonix, France, 11-13 February 2008.
  • 15
    • 56149084098 scopus 로고    scopus 로고
    • Life cycle cost calculation for manufacturing systems by means of reconfigurability analysis
    • Chapter 32, Ed. Anatoli I. Dashchenko, Chapter 32, pp, Springer, Berlin, Heidelberg, New York
    • Urbani, A. Life cycle cost calculation for manufacturing systems by means of reconfigurability analysis, Chapter 32 In Reconfigurable manufacturing systems and transformable factories (Ed. Anatoli I. Dashchenko), 2006, Chapter 32, pp. 643-658 (Springer, Berlin, Heidelberg, New York).
    • (2006) Reconfigurable manufacturing systems and transformable factories , pp. 643-658
    • Urbani, A.1
  • 16
    • 56149106984 scopus 로고    scopus 로고
    • Economical models for reconfigurable manufacturing systems
    • Chapter 31, Ed. Anatoli I. Dashchenko, Chapter 31, pp, Springer, Berlin, Heidelberg, New York
    • Bruccoleri, M. and Perrone, G. Economical models for reconfigurable manufacturing systems. Chapter 31 In Reconfigurable manufacturing systems and transformable factories (Ed. Anatoli I. Dashchenko), 2006, Chapter 31, pp. 629-642 (Springer, Berlin, Heidelberg, New York).
    • (2006) Reconfigurable manufacturing systems and transformable factories , pp. 629-642
    • Bruccoleri, M.1    Perrone, G.2
  • 17
    • 1642478976 scopus 로고    scopus 로고
    • A new methodology to evaluate the real options of an investment using binomial trees and Monte Carlo simulation
    • Eds S. Chick, P. J. Sánchez, D. Ferrin, and D. J. Morrice, New Orleans, Louisianna, December
    • Amico, M., Pasek, Z. J., and Asl, F. A new methodology to evaluate the real options of an investment using binomial trees and Monte Carlo simulation. In Proceedings of the 2003 Winter Simulation Conference (Eds S. Chick, P. J. Sánchez, D. Ferrin, and D. J. Morrice). New Orleans, Louisianna, December 2003, pp. 351-359.
    • (2003) Proceedings of the 2003 Winter Simulation Conference , pp. 351-359
    • Amico, M.1    Pasek, Z.J.2    Asl, F.3
  • 18
    • 41549161151 scopus 로고    scopus 로고
    • Real options: An application to RMS investment evaluation
    • Ed. Anatoli I. Dashchenko, Chapter 34, pp, Springer, Berlin, Heidelberg, New York
    • Amico, M., Asl, F., Pasek, Z., and Perrone, G. Real options: an application to RMS investment evaluation. In Reconfigurable manufacturing systems and transformable factories (Ed. Anatoli I. Dashchenko), 2006, Chapter 34, pp. 675-693 (Springer, Berlin, Heidelberg, New York).
    • (2006) Reconfigurable manufacturing systems and transformable factories , pp. 675-693
    • Amico, M.1    Asl, F.2    Pasek, Z.3    Perrone, G.4
  • 19
    • 33750070350 scopus 로고    scopus 로고
    • Measuring flexibility in investment decisions for manufacturing systems
    • 4 pp
    • Abele, E., Liebeck, T., and Wörn, A. Measuring flexibility in investment decisions for manufacturing systems. Ann. CIRP, 2006, 55(1), 4 pp.
    • (2006) Ann. CIRP , vol.55 , Issue.1
    • Abele, E.1    Liebeck, T.2    Wörn, A.3
  • 21
    • 21044440101 scopus 로고    scopus 로고
    • 2004 edition, Final Assembly, International Electronics Manufacturing Initiative, December
    • iNEMI technology roadmaps, 2004 edition, Final Assembly, International Electronics Manufacturing Initiative, December 2004.
    • (2004) iNEMI technology roadmaps
  • 22
    • 56149089208 scopus 로고    scopus 로고
    • SEMI E10-0304, Specification for definition and measurement of equipment reliability, availability, and maintainability (RAM), SEMI International Standard, 2004, http://www.semi.org.
    • SEMI E10-0304, Specification for definition and measurement of equipment reliability, availability, and maintainability (RAM), SEMI International Standard, 2004, http://www.semi.org.
  • 23
    • 56149088019 scopus 로고    scopus 로고
    • SEMI E79-0304, Specification for definition and measurement of equipment productivity, SEMI International Standard, 2004, http://www.semi.org.
    • SEMI E79-0304, Specification for definition and measurement of equipment productivity, SEMI International Standard, 2004, http://www.semi.org.
  • 24
    • 56149118590 scopus 로고    scopus 로고
    • SEMI E35-0305, Cost of ownership for semiconductor manufacturing equipment metrics, SEMI International Standard, 2005, http://www.semi.org.
    • SEMI E35-0305, Cost of ownership for semiconductor manufacturing equipment metrics, SEMI International Standard, 2005, http://www.semi.org.
  • 27
    • 0242269802 scopus 로고    scopus 로고
    • Huang, S. H., Dismukes, J. P., Shi, J., Su, Q., Razzak Mousalam, A., Bodhale, R., and Robinson, D. E. Manufacturing productivity improvement using effectiveness metrics and simulation analysis. Int. J. Prod. Res., 2003, 41(3), 513-527.
    • Huang, S. H., Dismukes, J. P., Shi, J., Su, Q., Razzak Mousalam, A., Bodhale, R., and Robinson, D. E. Manufacturing productivity improvement using effectiveness metrics and simulation analysis. Int. J. Prod. Res., 2003, 41(3), 513-527.
  • 28
    • 56149084561 scopus 로고    scopus 로고
    • Barringer, H. P. and Weber, D. P. 1996, Life cycle cost tutorial. In Fifth International Conference on Process plant reliability, 2-4 October 1996 (Gulf Publishing Company, Houston, Texas); available from http://www.barringer1.com.
    • Barringer, H. P. and Weber, D. P. 1996, Life cycle cost tutorial. In Fifth International Conference on Process plant reliability, 2-4 October 1996 (Gulf Publishing Company, Houston, Texas); available from http://www.barringer1.com.
  • 29
    • 0033704252 scopus 로고    scopus 로고
    • An evaluation of vendor selection models from a total cost of ownership perspective
    • 16 August
    • Degraeve, Z., Labro, E., and Roodhooft, F. An evaluation of vendor selection models from a total cost of ownership perspective. Eur. J. Op. Res., 16 August 2000, 125(1), 34-58.
    • (2000) Eur. J. Op. Res , vol.125 , Issue.1 , pp. 34-58
    • Degraeve, Z.1    Labro, E.2    Roodhooft, F.3
  • 30
    • 0032756919 scopus 로고    scopus 로고
    • Improving the efficiency of the purchasing process using total cost of ownership information: The case of heating electrodes at Cockerill Sambre S.A
    • 1 January
    • Degraeve, Z. and Roodhooft, F. Improving the efficiency of the purchasing process using total cost of ownership information: the case of heating electrodes at Cockerill Sambre S.A. Eur. J. Op. Res., 1 January 1999, 112(1), 42-53.
    • (1999) Eur. J. Op. Res , vol.112 , Issue.1 , pp. 42-53
    • Degraeve, Z.1    Roodhooft, F.2
  • 32
    • 56149118113 scopus 로고    scopus 로고
    • accessed 4 July 2007
    • www.wwk.com, accessed 4 July 2007.
  • 33
    • 33746797936 scopus 로고    scopus 로고
    • Cost of ownership (COO) for optoelectronic manufacturing equipment
    • Rochester, New York, available at
    • Ragona, S. Cost of ownership (COO) for optoelectronic manufacturing equipment. In Microsystems Conference, Rochester, New York, 2002; available at http://documents.exfo.com/appnotes/anoteBurleigh002-ang.pdf.
    • (2002) Microsystems Conference
    • Ragona, S.1
  • 34
    • 0033876271 scopus 로고    scopus 로고
    • Revisiting the golden triangle of cost, time and quality: The role of NPV in project control, success and failure
    • August
    • Gardiner, P.D. and Stewart, K. Revisiting the golden triangle of cost, time and quality: the role of NPV in project control, success and failure. Int. J. Project Managmt, August 2000, 18(4), 251-256.
    • (2000) Int. J. Project Managmt , vol.18 , Issue.4 , pp. 251-256
    • Gardiner, P.D.1    Stewart, K.2
  • 35
    • 0020809541 scopus 로고
    • The overall rate of return as a profit measure for capital projects. Engng Costs and Prod
    • September
    • Tung, A. The overall rate of return as a profit measure for capital projects. Engng Costs and Prod. Economics, September 1983, 7(3), 235-241.
    • (1983) Economics , vol.7 , Issue.3 , pp. 235-241
    • Tung, A.1
  • 36
    • 33747114634 scopus 로고    scopus 로고
    • Uncertainty and global sensitivity analysis in the evaluation of investment projects
    • November
    • Borgonovo, E. and Peccati, L. Uncertainty and global sensitivity analysis in the evaluation of investment projects. Int. J. Prod. Economics, November 2006, 104(1), 62-73.
    • (2006) Int. J. Prod. Economics , vol.104 , Issue.1 , pp. 62-73
    • Borgonovo, E.1    Peccati, L.2
  • 38
    • 56149119076 scopus 로고    scopus 로고
    • Heilala, J., Helin, K., Montonen, J., Voho, P., and Anttila, M. 2005. Integrating cost of ownership analysis into component-based simulation. In Today's reactions tomorrow's challenges, 1st International Conference on Changeable, agile, reconfigurable and virtual production (CARV 2005) Technische Universität München, Münich, 22-23 September 2005, pp. 385-392.
    • Heilala, J., Helin, K., Montonen, J., Voho, P., and Anttila, M. 2005. Integrating cost of ownership analysis into component-based simulation. In Today's reactions tomorrow's challenges, 1st International Conference on Changeable, agile, reconfigurable and virtual production (CARV 2005) Technische Universität München, Münich, 22-23 September 2005, pp. 385-392.
  • 39
    • 33749187315 scopus 로고    scopus 로고
    • Heilala, J., Helin, K., Montonen, J., and Väätä inen, O. Life cycle and cost analysis for modular re-configurable final assembly systems. In Precision assembly technologies for mini and micro products, 3rd International Precision Assembly Seminar (IPAS 2006) (Ed. S. Ratchev), Bad Hofgastein, Austria, 19-22 February 2006, pp. 277-286 (Springer).
    • Heilala, J., Helin, K., Montonen, J., and Väätä inen, O. Life cycle and cost analysis for modular re-configurable final assembly systems. In Precision assembly technologies for mini and micro products, 3rd International Precision Assembly Seminar (IPAS 2006) (Ed. S. Ratchev), Bad Hofgastein, Austria, 19-22 February 2006, pp. 277-286 (Springer).
  • 40
    • 33746861470 scopus 로고    scopus 로고
    • Total cost of ownership analysis for modular final assembly systems
    • Heilala, J., Helin, K., and Montonen, J. Total cost of ownership analysis for modular final assembly systems. Int. J. Prod. Res., 2006, 44(18-19), 3967-3988.
    • (2006) Int. J. Prod. Res , vol.44 , Issue.18-19 , pp. 3967-3988
    • Heilala, J.1    Helin, K.2    Montonen, J.3
  • 41
    • 33847308200 scopus 로고    scopus 로고
    • Selecting the right system - assembly system comparison with total cost of ownership methodology
    • Automn
    • Heilala, J., Montonen, J., and Helin, K. Selecting the right system - assembly system comparison with total cost of ownership methodology. Assembly Automn, 2007, 27(1), 44-54.
    • (2007) Assembly , vol.27 , Issue.1 , pp. 44-54
    • Heilala, J.1    Montonen, J.2    Helin, K.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.