메뉴 건너뛰기




Volumn 46, Issue 23, 2008, Pages 6759-6780

DESSAC: A decision support system for quantifying and analysing agility

Author keywords

Agile manufacturing; Decision support system; Implementation study; Lean manufacturing; Team building

Indexed keywords

ADMINISTRATIVE DATA PROCESSING; AGILE MANUFACTURING SYSTEMS; ARTIFICIAL INTELLIGENCE; DECISION MAKING; DECISION THEORY; MANAGEMENT INFORMATION SYSTEMS; MANUFACTURE; PERSONNEL; WORK SIMPLIFICATION;

EID: 54349107432     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540802230439     Document Type: Article
Times cited : (45)

References (68)
  • 1
    • 0009443304 scopus 로고    scopus 로고
    • Design and implementation of flexible manufacturing solutions in agile enterprises
    • Abdel-Malek, L., Das, S.K. and Wolf, C., Design and implementation of flexible manufacturing solutions in agile enterprises. Int. J. Agile Man. Syst., 2000, 2(3), 187-195.
    • (2000) Int. J. Agile Man. Syst , vol.2 , Issue.3 , pp. 187-195
    • Abdel-Malek, L.1    Das, S.K.2    Wolf, C.3
  • 3
    • 0005313306 scopus 로고    scopus 로고
    • Understanding, implementing and exploiting agility and leanness
    • Aitken, J., Christopher, M. and Towill, D., Understanding, implementing and exploiting agility and leanness. Int. J. Logist.: Res. Appl., 2002, 5(1), 59-74.
    • (2002) Int. J. Logist.: Res. Appl , vol.5 , Issue.1 , pp. 59-74
    • Aitken, J.1    Christopher, M.2    Towill, D.3
  • 4
    • 1642266589 scopus 로고    scopus 로고
    • A decision support system for machine tool selection
    • Arslan, M.C., Catay, B. and Budak, E., A decision support system for machine tool selection. J. Manuf. Tech. Man., 2004, 15(1), 101-109.
    • (2004) J. Manuf. Tech. Man , vol.15 , Issue.1 , pp. 101-109
    • Arslan, M.C.1    Catay, B.2    Budak, E.3
  • 5
    • 4944261968 scopus 로고    scopus 로고
    • A measure of agility as the complexity of the enterprise system
    • Arteta, B.M. and Giachetti, R.E., A measure of agility as the complexity of the enterprise system. Robot. Comp.-Integ. Manuf., 2004, 20, 495-503.
    • (2004) Robot. Comp.-Integ. Manuf , vol.20 , pp. 495-503
    • Arteta, B.M.1    Giachetti, R.E.2
  • 6
    • 33750365712 scopus 로고    scopus 로고
    • An analytical network process-based framework for successful total quality management (TQM): An assessment of Turkish manufacturing industry readiness
    • Bayazit, O. and Karpak, B., An analytical network process-based framework for successful total quality management (TQM): an assessment of Turkish manufacturing industry readiness. Int. J. Prod. Econ., 2007, 105, 79-96.
    • (2007) Int. J. Prod. Econ , vol.105 , pp. 79-96
    • Bayazit, O.1    Karpak, B.2
  • 7
    • 33747140007 scopus 로고    scopus 로고
    • Use of analytic network process in vendor selection decisions
    • Bayazit, O., Use of analytic network process in vendor selection decisions. Benchmarking: An Int. J., 2006, 13(5), 566-579.
    • (2006) Benchmarking: An Int. J , vol.13 , Issue.5 , pp. 566-579
    • Bayazit, O.1
  • 8
    • 33746814817 scopus 로고    scopus 로고
    • A new value stream mapping approach for complex production systems
    • Braglia, M., Carmignani, G. and Zammori, F., A new value stream mapping approach for complex production systems. Int. J. Prod. Res., 2006, 44(18-19), 3929-3952.
    • (2006) Int. J. Prod. Res , vol.44 , Issue.18-19 , pp. 3929-3952
    • Braglia, M.1    Carmignani, G.2    Zammori, F.3
  • 9
    • 0042740435 scopus 로고    scopus 로고
    • The manufacturing strategy-capabilities links in mass customisation and agile manufacturing - an exploratory study
    • Brown, S. and Bessant, J., The manufacturing strategy-capabilities links in mass customisation and agile manufacturing - an exploratory study. Int. J. Op. & Prod. Man., 2003, 23(7), 707-730.
    • (2003) Int. J. Op. & Prod. Man , vol.23 , Issue.7 , pp. 707-730
    • Brown, S.1    Bessant, J.2
  • 10
    • 84986099107 scopus 로고    scopus 로고
    • A group decision support system for strategic alternatives selection
    • Carneiro, A., A group decision support system for strategic alternatives selection. Man. Decision, 2001, 39(31), 218-226.
    • (2001) Man. Decision , vol.39 , Issue.31 , pp. 218-226
    • Carneiro, A.1
  • 11
    • 0035920341 scopus 로고    scopus 로고
    • Modelling for agile manufacturing systems
    • Chan, F.T.S. and Zhang, J., Modelling for agile manufacturing systems. Int. J. Prod. Res., 2001, 39(11), 2313-2332.
    • (2001) Int. J. Prod. Res , vol.39 , Issue.11 , pp. 2313-2332
    • Chan, F.T.S.1    Zhang, J.2
  • 12
    • 0033907504 scopus 로고    scopus 로고
    • The development of intelligent decision support tools to aid the design of flexible manufacturing systems
    • Chan, F.T.S., Jiang, B. and Tang, N.K.H., The development of intelligent decision support tools to aid the design of flexible manufacturing systems. Int. J. Prod. Econ., 2000, 65, 73-84.
    • (2000) Int. J. Prod. Econ , vol.65 , pp. 73-84
    • Chan, F.T.S.1    Jiang, B.2    Tang, N.K.H.3
  • 13
    • 0034664137 scopus 로고    scopus 로고
    • a web-based engineering approach and its implementation issues
    • The internet as a tool with application to agile manufacturing
    • Cheng, K., Pan, P.Y. and Harrison, D.K., The internet as a tool with application to agile manufacturing: a web-based engineering approach and its implementation issues. Int. J. Prod. Res., 2000, 38(12), 2743-2759.
    • (2000) Int. J. Prod. Res , vol.38 , Issue.12 , pp. 2743-2759
    • Cheng, K.1    Pan, P.Y.2    Harrison, D.K.3
  • 14
    • 0345446596 scopus 로고    scopus 로고
    • Relative importance of contingency variables for advanced manufacturing technology
    • Das, A. and Jayaram, J., Relative importance of contingency variables for advanced manufacturing technology. Int. J. Prod. Res., 2003, 41(18), 4429-4452.
    • (2003) Int. J. Prod. Res , vol.41 , Issue.18 , pp. 4429-4452
    • Das, A.1    Jayaram, J.2
  • 15
    • 0034688387 scopus 로고    scopus 로고
    • Quantifying benefits of conversion to lean manufacturing with discrete event simulation: A case study
    • Detty, R.B. and Yingling, J.C., Quantifying benefits of conversion to lean manufacturing with discrete event simulation: a case study. Int. J. Prod. Res., 2000, 38(2), 429-445.
    • (2000) Int. J. Prod. Res , vol.38 , Issue.2 , pp. 429-445
    • Detty, R.B.1    Yingling, J.C.2
  • 16
    • 23844447279 scopus 로고    scopus 로고
    • Design for quality in agile manufacturing environment through modified orthogonal array-based experimentation
    • Devadasan, S.R., Goshteeswaran, S. and Gokulachandran, J., Design for quality in agile manufacturing environment through modified orthogonal array-based experimentation. J. Manuf. Tech. Man., 2005, 16(6), 576-597.
    • (2005) J. Manuf. Tech. Man , vol.16 , Issue.6 , pp. 576-597
    • Devadasan, S.R.1    Goshteeswaran, S.2    Gokulachandran, J.3
  • 17
    • 84986166756 scopus 로고    scopus 로고
    • Decision support system for risk management
    • Dey, P.K., Decision support system for risk management. Man. Decision, 2001, 39(8), 634-649.
    • (2001) Man. Decision , vol.39 , Issue.8 , pp. 634-649
    • Dey, P.K.1
  • 18
    • 0035501413 scopus 로고    scopus 로고
    • Further evidence on the validity of the theoretical models underlying the Baldrige criteria
    • Flynn, B.B. and Saladin, B., Further evidence on the validity of the theoretical models underlying the Baldrige criteria. J. Op. Man., 2001, 19, 617-652.
    • (2001) J. Op. Man , vol.19 , pp. 617-652
    • Flynn, B.B.1    Saladin, B.2
  • 19
    • 18744415032 scopus 로고    scopus 로고
    • A distributed virtual factory in agile manufacturing environment
    • Fujii, S., Kaihara, T. and Morita, H., A distributed virtual factory in agile manufacturing environment. Int. J. Prod. Res., 2000, 38(17), 4113-4128.
    • (2000) Int. J. Prod. Res , vol.38 , Issue.17 , pp. 4113-4128
    • Fujii, S.1    Kaihara, T.2    Morita, H.3
  • 20
    • 85036336808 scopus 로고    scopus 로고
    • Modelling lean, agile and leagile supply chain strategies
    • Goldsby, T.J., Griffis, S.E. and Roath, A.S., Modelling lean, agile and leagile supply chain strategies. J. Business Logist., 2006, 27(1), 57-80.
    • (2006) J. Business Logist , vol.27 , Issue.1 , pp. 57-80
    • Goldsby, T.J.1    Griffis, S.E.2    Roath, A.S.3
  • 21
    • 1642362481 scopus 로고    scopus 로고
    • Decision support system for machining center selection
    • Gopalakrishnan, B., Yoshii, T. and Dappili, S.M., Decision support system for machining center selection. J. Manuf. Tech. Man., 2004, 15(2), 144-154.
    • (2004) J. Manuf. Tech. Man , vol.15 , Issue.2 , pp. 144-154
    • Gopalakrishnan, B.1    Yoshii, T.2    Dappili, S.M.3
  • 22
    • 0032640805 scopus 로고    scopus 로고
    • Agile manufacturing: A framework for research and development
    • Gunasekaran, A., Agile manufacturing: a framework for research and development. Int. J. Prod. Econ., 1999, 62, 87-105.
    • (1999) Int. J. Prod. Econ , vol.62 , pp. 87-105
    • Gunasekaran, A.1
  • 23
    • 0032070305 scopus 로고    scopus 로고
    • Agile manufacturing: Enablers, & an implementation network
    • Gunasekaran, A., Agile manufacturing: enablers, & an implementation network. Int. J. Prod. Res., 1998, 36(5), 1223-1247.
    • (1998) Int. J. Prod. Res , vol.36 , Issue.5 , pp. 1223-1247
    • Gunasekaran, A.1
  • 24
    • 33748699783 scopus 로고    scopus 로고
    • Could developing countries take the benefit of globalisation?
    • Hartungi, R., Could developing countries take the benefit of globalisation? Int. J. Social Econ., 2006, 33(11), 728-743.
    • (2006) Int. J. Social Econ , vol.33 , Issue.11 , pp. 728-743
    • Hartungi, R.1
  • 25
    • 0037143044 scopus 로고    scopus 로고
    • Scheduling manufacturing systems for delayed product differentiation in agile manufacturing
    • He, D. and Babayan, A., Scheduling manufacturing systems for delayed product differentiation in agile manufacturing. Int. J. Prod. Res., 2002, 40(11), 2461-2481.
    • (2002) Int. J. Prod. Res , vol.40 , Issue.11 , pp. 2461-2481
    • He, D.1    Babayan, A.2
  • 26
    • 27744511487 scopus 로고    scopus 로고
    • A novel approach to Lean control for Taiwan-funded enterprises in mainland China
    • Huang, C.C. and Liu, S.H., A novel approach to Lean control for Taiwan-funded enterprises in mainland China. Int. J. Prod. Res., 2005, 43(12), 2553-2575.
    • (2005) Int. J. Prod. Res , vol.43 , Issue.12 , pp. 2553-2575
    • Huang, C.C.1    Liu, S.H.2
  • 27
    • 33751406789 scopus 로고    scopus 로고
    • Using a multi-criteria decision making approach to evaluate mobile phone alternatives
    • Isiklar, G. and Buyukozkan, G., Using a multi-criteria decision making approach to evaluate mobile phone alternatives. Computer Stand. & Interfaces, 2007, 29, 265-274.
    • (2007) Computer Stand. & Interfaces , vol.29 , pp. 265-274
    • Isiklar, G.1    Buyukozkan, G.2
  • 30
    • 3543106124 scopus 로고
    • A methodology for assessing time-based competitive advantage of manufacturing firms
    • Kumar, A. and Motwani, J., A methodology for assessing time-based competitive advantage of manufacturing firms. Int. J. Op. Prod. Man., 1995, 15(2), 36-53.
    • (1995) Int. J. Op. Prod. Man , vol.15 , Issue.2 , pp. 36-53
    • Kumar, A.1    Motwani, J.2
  • 31
    • 0030737144 scopus 로고    scopus 로고
    • Design for agile assembly: An operational perspective
    • Kusiak, A. and He, D.W., Design for agile assembly: an operational perspective. Int. J. Prod. Res., 1997, 35(1), 157-178.
    • (1997) Int. J. Prod. Res , vol.35 , Issue.1 , pp. 157-178
    • Kusiak, A.1    He, D.W.2
  • 33
    • 31744442202 scopus 로고    scopus 로고
    • Agility evaluation using fuzzy logic
    • Lin, C.-T., Chiu, H. and Tseng, Y.-H., Agility evaluation using fuzzy logic. Int. J. Prod. Econ., 2006, 101(2), 353-368.
    • (2006) Int. J. Prod. Econ , vol.101 , Issue.2 , pp. 353-368
    • Lin, C.-T.1    Chiu, H.2    Tseng, Y.-H.3
  • 34
    • 27744450360 scopus 로고    scopus 로고
    • Decision support system for selecting the proper project delivery method using analytic hierarchy process (AHP)
    • Mahdi, I.M. and Alreshaid, K., Decision support system for selecting the proper project delivery method using analytic hierarchy process (AHP). Int. J. Proj. Man., 2005, 23, 564-572.
    • (2005) Int. J. Proj. Man , vol.23 , pp. 564-572
    • Mahdi, I.M.1    Alreshaid, K.2
  • 36
    • 1242298409 scopus 로고    scopus 로고
    • The age of agile manufacturing
    • Maskell, B., The age of agile manufacturing. Supply Chain Man.: An Int. J., 2001, 6(1), 5-11.
    • (2001) Supply Chain Man.: An Int. J , vol.6 , Issue.1 , pp. 5-11
    • Maskell, B.1
  • 37
    • 0034694501 scopus 로고    scopus 로고
    • Lean, agile or leagile? Matching your supply chain to the market place
    • Mason-Jones, R., Naylor, B. and Towill, D.R., Lean, agile or leagile? Matching your supply chain to the market place. Int. J. Prod. Res., 2000, 38(17), 4061-4070.
    • (2000) Int. J. Prod. Res , vol.38 , Issue.17 , pp. 4061-4070
    • Mason-Jones, R.1    Naylor, B.2    Towill, D.R.3
  • 38
    • 33947541645 scopus 로고    scopus 로고
    • contributing to agility in the twenty-first century
    • Internet technology
    • McGaughey, R.E., Internet technology: contributing to agility in the twenty-first century. Int. J. Agile Man. Syst., 1999, 1(1), 7-13.
    • (1999) Int. J. Agile Man. Syst , vol.1 , Issue.1 , pp. 7-13
    • McGaughey, R.E.1
  • 39
    • 0344240982 scopus 로고    scopus 로고
    • Leagility: Integrating the lean and agile manufacturing paradigms in the total supply chain
    • Naylor, J.B., Naim, M.M. and Berry, D., Leagility: integrating the lean and agile manufacturing paradigms in the total supply chain. Int. J. Prod. Econ., 1999, 62, 107-118.
    • (1999) Int. J. Prod. Econ , vol.62 , pp. 107-118
    • Naylor, J.B.1    Naim, M.M.2    Berry, D.3
  • 40
    • 0242364676 scopus 로고    scopus 로고
    • Classification scheme for lean manufacturing tools
    • Pavnaskar, S.J., Gershenson, J.K. and Jambekar, A.B., Classification scheme for lean manufacturing tools. Int. J. Prod. Res., 2003, 41(13), 3075-3090.
    • (2003) Int. J. Prod. Res , vol.41 , Issue.13 , pp. 3075-3090
    • Pavnaskar, S.J.1    Gershenson, J.K.2    Jambekar, A.B.3
  • 41
    • 33947502562 scopus 로고    scopus 로고
    • Model-driven decision support systems: Concepts and research directions
    • Power, D.J. and Sharda, R., Model-driven decision support systems: concepts and research directions. Decision Supp. Syst., 2007, 43, 1044-1061.
    • (2007) Decision Supp. Syst , vol.43 , pp. 1044-1061
    • Power, D.J.1    Sharda, R.2
  • 42
    • 33845732313 scopus 로고    scopus 로고
    • Manufacturing strategies and innovation performance in newly industrialised countries
    • Prajogo, D.I., Laosirihongthong, T., Sohal, A. and Boon-itt, S., Manufacturing strategies and innovation performance in newly industrialised countries. Indust. Man. Data Syst., 2007, 107(1), 52-68.
    • (2007) Indust. Man. Data Syst , vol.107 , Issue.1 , pp. 52-68
    • Prajogo, D.I.1    Laosirihongthong, T.2    Sohal, A.3    Boon-itt, S.4
  • 43
    • 0035210439 scopus 로고    scopus 로고
    • Agility in manufacturing systems: An exploratory modeling framework and simulation
    • Ramasesh, R., Kulkarni, S. and Jayakumar, M., Agility in manufacturing systems: an exploratory modeling framework and simulation. Integ. Manuf. Syst., 2001, 12(7), 534-548.
    • (2001) Integ. Manuf. Syst , vol.12 , Issue.7 , pp. 534-548
    • Ramasesh, R.1    Kulkarni, S.2    Jayakumar, M.3
  • 44
    • 54349102412 scopus 로고    scopus 로고
    • Agility assessment through qualification and quantification tools: A case study in an Indian pump manufacturing company
    • Ramesh, G. and Devadasan, S.R., Agility assessment through qualification and quantification tools: a case study in an Indian pump manufacturing company. Int. J. Mass Custom., 2007, 2(1/2), 139-160.
    • (2007) Int. J. Mass Custom , vol.2 , Issue.1-2 , pp. 139-160
    • Ramesh, G.1    Devadasan, S.R.2
  • 45
    • 21344484785 scopus 로고
    • Strategic framework for implementing flexible manufacturing systems in India
    • Rao, K.V.S. and Deshmukh, S.G., Strategic framework for implementing flexible manufacturing systems in India. Int. J. Op. Prod. Man., 1994, 14(4), 50-63.
    • (1994) Int. J. Op. Prod. Man , vol.14 , Issue.4 , pp. 50-63
    • Rao, K.V.S.1    Deshmukh, S.G.2
  • 46
    • 33744993193 scopus 로고    scopus 로고
    • Agile manufacturing system control based on cell re-configuration
    • Rao, Y., Li, P., Shao, X. and Shi, K., Agile manufacturing system control based on cell re-configuration. Int. J. Prod. Res., 2006, 44(10), 1881-1905.
    • (2006) Int. J. Prod. Res , vol.44 , Issue.10 , pp. 1881-1905
    • Rao, Y.1    Li, P.2    Shao, X.3    Shi, K.4
  • 47
    • 0042929432 scopus 로고    scopus 로고
    • The effects of agile attributes on competitive priorities: A neural network approach
    • Ren, J., Yusuf, Y.Y. and Burns, N.D., The effects of agile attributes on competitive priorities: a neural network approach. Integ. Manuf. Syst., 2003, 14(6), 489-497.
    • (2003) Integ. Manuf. Syst , vol.14 , Issue.6 , pp. 489-497
    • Ren, J.1    Yusuf, Y.Y.2    Burns, N.D.3
  • 48
    • 34547808744 scopus 로고    scopus 로고
    • Measuring the impact of lean tools on the cost-time investment of a product using cost-time profiles
    • Rivera, L. and Chen, F.F., Measuring the impact of lean tools on the cost-time investment of a product using cost-time profiles. Robot. Comp.-Integ. Manuf., 2007, 23, 684-689.
    • (2007) Robot. Comp.-Integ. Manuf , vol.23 , pp. 684-689
    • Rivera, L.1    Chen, F.F.2
  • 49
    • 0006754813 scopus 로고    scopus 로고
    • Short-term strategic management in mass customized markets
    • Saisse, M.C.P. and Wilding, R.D., Short-term strategic management in mass customized markets. Logist. Inform. Man., 1997, 10(5), 199-207.
    • (1997) Logist. Inform. Man , vol.10 , Issue.5 , pp. 199-207
    • Saisse, M.C.P.1    Wilding, R.D.2
  • 50
    • 0035841889 scopus 로고    scopus 로고
    • A review of agile manufacturing systems
    • Sanchez, L.M. and Nagi, R., A review of agile manufacturing systems. Int. J. Prod. Res., 2001, 39(16), 3561-3600.
    • (2001) Int. J. Prod. Res , vol.39 , Issue.16 , pp. 3561-3600
    • Sanchez, L.M.1    Nagi, R.2
  • 51
    • 42649107933 scopus 로고    scopus 로고
    • Business & economy mobile phones - it's a camera
    • Saran, R., Business & economy mobile phones - it's a camera .... India Today, 2005, 54-58.
    • (2005) India Today , pp. 54-58
    • Saran, R.1
  • 52
    • 0242360172 scopus 로고    scopus 로고
    • Benchmarking for agility
    • Sarkis, J., Benchmarking for agility. Benchmarking. An Int. J., 2001, 8(2), 88-107.
    • (2001) Benchmarking. An Int. J , vol.8 , Issue.2 , pp. 88-107
    • Sarkis, J.1
  • 53
    • 0037357671 scopus 로고    scopus 로고
    • Lean manufacturing: Context, practice bundles, and performance
    • Shah, R. and Ward, P.T., Lean manufacturing: context, practice bundles, and performance. J. Op. Man., 2003, 21, 129-149.
    • (2003) J. Op. Man , vol.21 , pp. 129-149
    • Shah, R.1    Ward, P.T.2
  • 54
    • 0032630090 scopus 로고    scopus 로고
    • A methodology for achieving agility in manufacturing organizations: An introduction
    • Sharifi, H. and Zhang, Z., A methodology for achieving agility in manufacturing organizations: An introduction. Int. J. Prod. Econ., 1999, 62, 7-22.
    • (1999) Int. J. Prod. Econ , vol.62 , pp. 7-22
    • Sharifi, H.1    Zhang, Z.2
  • 55
    • 33644598208 scopus 로고    scopus 로고
    • Manufacturing excellence through TPM implementation: A practical analysis
    • Sharma, R.K., Kumar, D. and Kumar, P., Manufacturing excellence through TPM implementation: a practical analysis. Indust. Man. Data Syst., 2006, 106(2), 256-280.
    • (2006) Indust. Man. Data Syst , vol.106 , Issue.2 , pp. 256-280
    • Sharma, R.K.1    Kumar, D.2    Kumar, P.3
  • 56
    • 21844516507 scopus 로고
    • Lean production: Experience among Australian organizations
    • Sohal, A.S. and Egglestone, A., Lean production: experience among Australian organizations. Int. J. Op. Prod. Man., 1994, 14(11), 35-51.
    • (1994) Int. J. Op. Prod. Man , vol.14 , Issue.11 , pp. 35-51
    • Sohal, A.S.1    Egglestone, A.2
  • 58
    • 1642268285 scopus 로고    scopus 로고
    • Decision support system: Real-time control of manufacturing processes
    • Swanepoel, K.T., Decision support system: real-time control of manufacturing processes. J. Manuf. Tech. Man., 2004, 15(1), 68-75.
    • (2004) J. Manuf. Tech. Man , vol.15 , Issue.1 , pp. 68-75
    • Swanepoel, K.T.1
  • 59
    • 33644896972 scopus 로고    scopus 로고
    • Tzannatos, E.S., A decision support system for the promotion of security in shipping. Disaster Prev. Man., 2003, 12(3), 222-229.
    • Tzannatos, E.S., A decision support system for the promotion of security in shipping. Disaster Prev. Man., 2003, 12(3), 222-229.
  • 60
    • 33947223485 scopus 로고    scopus 로고
    • A decision support model based on the analytic hierarchy process for the make or buy decision in manufacturing
    • van de Water, H. and van Peet, H.P., A decision support model based on the analytic hierarchy process for the make or buy decision in manufacturing. J. Purch. Supply Man., 2006, 12, 258-271.
    • (2006) J. Purch. Supply Man , vol.12 , pp. 258-271
    • van de Water, H.1    van Peet, H.P.2
  • 61
    • 33746788981 scopus 로고    scopus 로고
    • Information fusion for simulation based decision support in manufacturing
    • Vin, L.J.D., Ng, A.H.C., Oscarsson, J. and Andler, S.F., Information fusion for simulation based decision support in manufacturing. Robot. Comp.-Integ. Manuf., 2006, 22, 429-436.
    • (2006) Robot. Comp.-Integ. Manuf , vol.22 , pp. 429-436
    • Vin, L.J.D.1    Ng, A.H.C.2    Oscarsson, J.3    Andler, S.F.4
  • 62
    • 33845699282 scopus 로고    scopus 로고
    • A decision support system for product design in concurrent engineering
    • Xu, L., Li, Z., Li, S. and Tang, F., A decision support system for product design in concurrent engineering. Decision Supp. Syst., 2007, 42, 2029-2042.
    • (2007) Decision Supp. Syst , vol.42 , pp. 2029-2042
    • Xu, L.1    Li, Z.2    Li, S.3    Tang, F.4
  • 63
    • 0037063831 scopus 로고    scopus 로고
    • Agility evaluation of mass customisation product manufacturing
    • Yang, S.L. and Li, T.F., Agility evaluation of mass customisation product manufacturing. J. Mat. Proc. Tech., 2002, 129, 640-644.
    • (2002) J. Mat. Proc. Tech , vol.129 , pp. 640-644
    • Yang, S.L.1    Li, T.F.2
  • 64
    • 0037146416 scopus 로고    scopus 로고
    • A comparative study of lean and agile manufacturing with a related survey of current practices in the UK
    • Yusuf, Y.Y. and Adeleye, E.O., A comparative study of lean and agile manufacturing with a related survey of current practices in the UK. Int. J. Prod. Res., 2002, 40, 4545-4562.
    • (2002) Int. J. Prod. Res , vol.40 , pp. 4545-4562
    • Yusuf, Y.Y.1    Adeleye, E.O.2
  • 65
    • 84986081976 scopus 로고    scopus 로고
    • Volume flexibility: The agile manufacturing conundrum
    • Yusuf, Y.Y., Adeleye, E.O. and Sivayoganathan, K., Volume flexibility: the agile manufacturing conundrum. Man. Decision, 2003, 41(7), 613-624.
    • (2003) Man. Decision , vol.41 , Issue.7 , pp. 613-624
    • Yusuf, Y.Y.1    Adeleye, E.O.2    Sivayoganathan, K.3
  • 66
    • 0032633357 scopus 로고    scopus 로고
    • Agile manufacturing: The drivers, concepts and attributes
    • Yusuf, Y., Sarhadi, M. and Gunasekaran, A., Agile manufacturing: the drivers, concepts and attributes. Int. J. Prod. Econ., 1999, 62, 33-43.
    • (1999) Int. J. Prod. Econ , vol.62 , pp. 33-43
    • Yusuf, Y.1    Sarhadi, M.2    Gunasekaran, A.3
  • 67
    • 0037109637 scopus 로고    scopus 로고
    • Investigation of the reconfigurable control system for an agile manufacturing cell
    • Zhang, J., Chan, F.T.S., Li, P., Lau, H.C.W., Ip, R.W.L. and Samaranayak, P., Investigation of the reconfigurable control system for an agile manufacturing cell. Int. J. Prod. Res., 2002, 40(15), 3709-3723.
    • (2002) Int. J. Prod. Res , vol.40 , Issue.15 , pp. 3709-3723
    • Zhang, J.1    Chan, F.T.S.2    Li, P.3    Lau, H.C.W.4    Ip, R.W.L.5    Samaranayak, P.6
  • 68
    • 3543109019 scopus 로고    scopus 로고
    • A methodology for achieving agility in manufacturing organizations
    • Zhang, Z. and Sharifi, H., A methodology for achieving agility in manufacturing organizations. Int. J. Op. Prod. Man., 2000, 20(4), 496-512.
    • (2000) Int. J. Op. Prod. Man , vol.20 , Issue.4 , pp. 496-512
    • Zhang, Z.1    Sharifi, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.