메뉴 건너뛰기




Volumn 36, Issue 1, 2009, Pages 852-860

Dynamic hard-real-time scheduling using genetic algorithm for multiprocessor task with resource and timing constraints

Author keywords

Dynamic scheduling; Genetic algorithm; Multiprocessor task; Optimization

Indexed keywords

ALGORITHMS; COMPUTATIONAL COMPLEXITY; DIESEL ENGINES; GENE EXPRESSION; GENETIC ALGORITHMS; MULTIPROCESSING SYSTEMS; NUCLEAR PROPULSION; SCHEDULING; TIME MEASUREMENT; TIMING CIRCUITS; TREES (MATHEMATICS);

EID: 53849105111     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2007.10.037     Document Type: Article
Times cited : (33)

References (30)
  • 1
    • 0010244454 scopus 로고    scopus 로고
    • Scheduling UET tasks systems with concurrency on two parallel identical processors
    • Brucker P., Knust S., Roper D., and Zinder Y. Scheduling UET tasks systems with concurrency on two parallel identical processors. Mathematical Methods of Operations Research 52 3 (2000) 369-387
    • (2000) Mathematical Methods of Operations Research , vol.52 , Issue.3 , pp. 369-387
    • Brucker, P.1    Knust, S.2    Roper, D.3    Zinder, Y.4
  • 2
    • 21844510777 scopus 로고
    • Shop scheduling problems with multiprocessor tasks on dedicated processors
    • Brucker P., and Kramer A. Shop scheduling problems with multiprocessor tasks on dedicated processors. Annals of Operations Research 57 (1995) 13-27
    • (1995) Annals of Operations Research , vol.57 , pp. 13-27
    • Brucker, P.1    Kramer, A.2
  • 3
    • 0030125537 scopus 로고    scopus 로고
    • Polynomial algorithms for resource-constrained and multiprocessor task scheduling problems
    • Brucker P., and Kramer A. Polynomial algorithms for resource-constrained and multiprocessor task scheduling problems. European Journal of Operational Research 90 (1996) 214-226
    • (1996) European Journal of Operational Research , vol.90 , pp. 214-226
    • Brucker, P.1    Kramer, A.2
  • 4
    • 24144460572 scopus 로고    scopus 로고
    • Two-phase population genetic algorithm for parallel machine-scheduling problem
    • Chang P.C., Chen S.H., and Lin K.L. Two-phase population genetic algorithm for parallel machine-scheduling problem. Expert Systems with Applications 29 3 (2005) 705-712
    • (2005) Expert Systems with Applications , vol.29 , Issue.3 , pp. 705-712
    • Chang, P.C.1    Chen, S.H.2    Lin, K.L.3
  • 5
    • 0033079757 scopus 로고    scopus 로고
    • General multiprocessor task scheduling
    • Chen J., and Lee C.Y. General multiprocessor task scheduling. Naval Research Logistics 46 (1999) 57-74
    • (1999) Naval Research Logistics , vol.46 , pp. 57-74
    • Chen, J.1    Lee, C.Y.2
  • 6
    • 0035107843 scopus 로고    scopus 로고
    • Competitive neural network to solve scheduling problems
    • Chen R.M., and Huang Y.M. Competitive neural network to solve scheduling problems. Neurocomputing 37 (2001) 177-196
    • (2001) Neurocomputing , vol.37 , pp. 177-196
    • Chen, R.M.1    Huang, Y.M.2
  • 7
    • 0035531681 scopus 로고    scopus 로고
    • Multiprocessor task assignment with fuzzy hopfield neural network clustering technique
    • Chen R.M., and Huang Y.M. Multiprocessor task assignment with fuzzy hopfield neural network clustering technique. Neural Computing and Applications 10 (2001) 12-21
    • (2001) Neural Computing and Applications , vol.10 , pp. 12-21
    • Chen, R.M.1    Huang, Y.M.2
  • 8
    • 33845665257 scopus 로고    scopus 로고
    • Combining competitive scheme with slack neurons to solve real-time job scheduling problem
    • Chen R.M., Lo S.T., and Huang Y.M. Combining competitive scheme with slack neurons to solve real-time job scheduling problem. Expert Systems with Applications 33 1 (2007) 75-85
    • (2007) Expert Systems with Applications , vol.33 , Issue.1 , pp. 75-85
    • Chen, R.M.1    Lo, S.T.2    Huang, Y.M.3
  • 13
    • 53849146594 scopus 로고    scopus 로고
    • Drozdowski, M. (1997). Selected problems of scheduling tasks in multiprocessor computer systems. Monograph No. 321, Poznan University of Technology Press.
    • Drozdowski, M. (1997). Selected problems of scheduling tasks in multiprocessor computer systems. Monograph No. 321, Poznan University of Technology Press.
  • 15
    • 85044469033 scopus 로고    scopus 로고
    • Ercan, M. F., Fung, Y. F. (1999). Real-time image interpretation on a multi-layer architecture. In Proceedings of the IEEE TENCON'99 (pp. 1303-1306).
    • Ercan, M. F., Fung, Y. F. (1999). Real-time image interpretation on a multi-layer architecture. In Proceedings of the IEEE TENCON'99 (pp. 1303-1306).
  • 18
    • 0041850365 scopus 로고
    • Job shop scheduling with due dates and variable processing times
    • Holloway C.A., and Nelson R.T. Job shop scheduling with due dates and variable processing times. Management Science 20 9 (1974) 1264-1275
    • (1974) Management Science , vol.20 , Issue.9 , pp. 1264-1275
    • Holloway, C.A.1    Nelson, R.T.2
  • 20
    • 0022121187 scopus 로고
    • An approximation algorithm for diagnostic test scheduling in multicomputer systems
    • Krawczyk H., and Kubale M. An approximation algorithm for diagnostic test scheduling in multicomputer systems. IEEE Transaction on Computers 34 (1985) 869-872
    • (1985) IEEE Transaction on Computers , vol.34 , pp. 869-872
    • Krawczyk, H.1    Kubale, M.2
  • 22
    • 10844252155 scopus 로고    scopus 로고
    • Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem
    • Liu S.Q., Ong H.L., and Ng K.M. Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem. Advances in Engineering Software 36 (2005) 199-205
    • (2005) Advances in Engineering Software , vol.36 , pp. 199-205
    • Liu, S.Q.1    Ong, H.L.2    Ng, K.M.3
  • 23
    • 37349117451 scopus 로고    scopus 로고
    • Lo, S. T., Chen, R. M., Huang, Y. M., Wu, C. L. (2007). Multiprocessor system scheduling with precedence and resource constraints using an enhanced ant colony system. Expert Systems with Applications, doi:10.1016/j.eswa.2007.02.022.
    • Lo, S. T., Chen, R. M., Huang, Y. M., Wu, C. L. (2007). Multiprocessor system scheduling with precedence and resource constraints using an enhanced ant colony system. Expert Systems with Applications, doi:10.1016/j.eswa.2007.02.022.
  • 26
    • 21144440772 scopus 로고    scopus 로고
    • A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks
    • Oǧuz C., and Ercan M. A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks. Journal of Scheduling 8 4 (2005) 323-351
    • (2005) Journal of Scheduling , vol.8 , Issue.4 , pp. 323-351
    • Oǧuz, C.1    Ercan, M.2
  • 27
    • 2442566880 scopus 로고    scopus 로고
    • Multiprocessor task scheduling in multistage hybrid flow-shops: A genetic algorithm approach
    • Şerifoǧlu F.S., and Ulusoy G. Multiprocessor task scheduling in multistage hybrid flow-shops: A genetic algorithm approach. Journal of the Operational Research Society 55 5 (2004) 504-512
    • (2004) Journal of the Operational Research Society , vol.55 , Issue.5 , pp. 504-512
    • Şerifoǧlu, F.S.1    Ulusoy, G.2
  • 30
    • 33745220037 scopus 로고    scopus 로고
    • Flexible flow shop scheduling: Optimum, heuristics and artificial intelligence solutions
    • Wang H. Flexible flow shop scheduling: Optimum, heuristics and artificial intelligence solutions. Expert Systems 22 2 (2005) 78-85
    • (2005) Expert Systems , vol.22 , Issue.2 , pp. 78-85
    • Wang, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.