-
1
-
-
33748753940
-
Inventory control in a multi-supplier system
-
Arda, Y. and Hennet, J.-C., Inventory control in a multi-supplier system. Int. J. Prod. Econ., 2006, 104(2), 249-259.
-
(2006)
Int. J. Prod. Econ
, vol.104
, Issue.2
, pp. 249-259
-
-
Arda, Y.1
Hennet, J.-C.2
-
3
-
-
0000892272
-
Using the deterministic EOQ formula in stochastic inventory control
-
Axsäter, S., Using the deterministic EOQ formula in stochastic inventory control. Man. Sci., 1996, 42, 830-834.
-
(1996)
Man. Sci
, vol.42
, pp. 830-834
-
-
Axsäter, S.1
-
4
-
-
0033080209
-
The effects of partial order release and component reservation on inventory and customer service performance in an MRP environment
-
Bragg, DJ., Duplaga, E.A. and Watis, CA., The effects of partial order release and component reservation on inventory and customer service performance in an MRP environment. Int. J. Prod. Res., 1999, 37, 523-538.
-
(1999)
Int. J. Prod. Res
, vol.37
, pp. 523-538
-
-
Bragg, D.J.1
Duplaga, E.A.2
Watis, C.A.3
-
5
-
-
84989726438
-
Supply management in assembly systems
-
Chu, C., Proth, J.M. and Xie, X., Supply management in assembly systems. Naval Res. Logist., 1993, 40, 933-949.
-
(1993)
Naval Res. Logist
, vol.40
, pp. 933-949
-
-
Chu, C.1
Proth, J.M.2
Xie, X.3
-
6
-
-
0037151234
-
A model for supply planning under lead time uncertainty
-
Dolgui, A. and Louly, M.A., A model for supply planning under lead time uncertainty. Int. J. Prod. Econ., 2002, 78, 145-152.
-
(2002)
Int. J. Prod. Econ
, vol.78
, pp. 145-152
-
-
Dolgui, A.1
Louly, M.A.2
-
7
-
-
36349035891
-
A survey on supply planning under uncertainties in MRP environments
-
edited by P. Horacek, M. Simandl and P. Zitek, pp, Elsevier: Oxford, 3-8 July, Prague, Czech Republic
-
Dolgui, A., Louly, M.-A. and Prodhon, C., A survey on supply planning under uncertainties in MRP environments. In Selected Plenaries, Milestones and Surveys. 16th IFAC World Congress, edited by P. Horacek, M. Simandl and P. Zitek, pp. 228-239, 2005 (Elsevier: Oxford). 3-8 July 2005, Prague, Czech Republic.
-
(2005)
Selected Plenaries, Milestones and Surveys. 16th IFAC World Congress
, pp. 228-239
-
-
Dolgui, A.1
Louly, M.-A.2
Prodhon, C.3
-
8
-
-
0036498097
-
Optimal leadtimes planning in serial production systems with earliness and tardiness costs
-
Elhafsi, M., Optimal leadtimes planning in serial production systems with earliness and tardiness costs. HE Trans., 2002, 34, 233-243.
-
(2002)
HE Trans
, vol.34
, pp. 233-243
-
-
Elhafsi, M.1
-
9
-
-
0000757562
-
MRP systems under supply and process uncertainty in an integrated shop floor control
-
Gupta, S.M. and Brennan, L., MRP systems under supply and process uncertainty in an integrated shop floor control. Int. J. Prod. Res., 1995, 33, 205-220.
-
(1995)
Int. J. Prod. Res
, vol.33
, pp. 205-220
-
-
Gupta, S.M.1
Brennan, L.2
-
10
-
-
0030285543
-
Optimal order policies in assembly systems with random demand and random supplier delivery
-
Gurnani, H., Akella, R. and Lehoczky, J., Optimal order policies in assembly systems with random demand and random supplier delivery. IIE Trans., 1996, 28, 865-878.
-
(1996)
IIE Trans
, vol.28
, pp. 865-878
-
-
Gurnani, H.1
Akella, R.2
Lehoczky, J.3
-
12
-
-
0032143246
-
MRP system nervousness and forecast errors
-
Ho, C.J. and Ireland, T.C., MRP system nervousness and forecast errors. Int. J. Prod. Res., 1998, 36, 2285-2299.
-
(1998)
Int. J. Prod. Res
, vol.36
, pp. 2285-2299
-
-
Ho, C.J.1
Ireland, T.C.2
-
13
-
-
0011700586
-
A dynamic inventory model with stochastic lead times
-
Kaplan, R., A dynamic inventory model with stochastic lead times. Manage. Sci., 1970, 16, 491-507.
-
(1970)
Manage. Sci
, vol.16
, pp. 491-507
-
-
Kaplan, R.1
-
14
-
-
4444318605
-
The (s,Q) inventory model with Erlang time and deterministic demand
-
Kim, J.G., Sun, D., He, X.J. and Hayya, J.C., The (s,Q) inventory model with Erlang time and deterministic demand. Naval Res. Logist., 2004, 51, 906-923.
-
(2004)
Naval Res. Logist
, vol.51
, pp. 906-923
-
-
Kim, J.G.1
Sun, D.2
He, X.J.3
Hayya, J.C.4
-
15
-
-
56749180550
-
Single product, single location models
-
edited by S.C. Graves, A.H.G. Rinnooy Kan and P.H. Zipkin, North-Holland: Amsterdam
-
Lee, H.L. and Hahmias, S., Single product, single location models. In Handbooks in Operations Research and Management Science. Vol.: Logistics of Production and Inventory, edited by S.C. Graves, A.H.G. Rinnooy Kan and P.H. Zipkin, Vol. 4, pp. 3-55, 1993 (North-Holland: Amsterdam).
-
(1993)
Handbooks in Operations Research and Management Science. Vol.: Logistics of Production and Inventory
, vol.4
, pp. 3-55
-
-
Lee, H.L.1
Hahmias, S.2
-
16
-
-
0041368936
-
The EOQ model under stochastic lead times
-
Liberatore, M.J., The EOQ model under stochastic lead times. Oper. Res., 1979, 27, 391-396.
-
(1979)
Oper. Res
, vol.27
, pp. 391-396
-
-
Liberatore, M.J.1
-
17
-
-
0037146389
-
Newsboy model for supply planning of assembly systems
-
Louly, M.A. and Dolgui, A., Newsboy model for supply planning of assembly systems. Int. J. Prod. Res., 2002, 40, 4401-4414.
-
(2002)
Int. J. Prod. Res
, vol.40
, pp. 4401-4414
-
-
Louly, M.A.1
Dolgui, A.2
-
18
-
-
67349171899
-
Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm
-
doi: 10.1016/j.ejor.2007.11.066
-
Louly, M.A. and Dolgui, A., Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm. Eur. J. Oper. Res., 2008, doi: 10.1016/j.ejor.2007.11.066.
-
(2008)
Eur. J. Oper. Res
-
-
Louly, M.A.1
Dolgui, A.2
-
19
-
-
33744983498
-
Models for production planning under uncertainty: A review
-
Mula, J., Poler, R., Garcia-Sabater, J.P. and Lario, F.C., Models for production planning under uncertainty: A review. Int. J. Prod. Econ., 2006, 103, 271-285.
-
(2006)
Int. J. Prod. Econ
, vol.103
, pp. 271-285
-
-
Mula, J.1
Poler, R.2
Garcia-Sabater, J.P.3
Lario, F.C.4
-
20
-
-
0031123532
-
Joint optimisation of lot-sizes, safety stocks and safety lead times in an MRP system
-
Molinder, A., Joint optimisation of lot-sizes, safety stocks and safety lead times in an MRP system. Int. J. Prod. Res., 1997, 35, 983-994.
-
(1997)
Int. J. Prod. Res
, vol.35
, pp. 983-994
-
-
Molinder, A.1
-
21
-
-
76049122168
-
-
Porteus, E.L., Stochastic inventory theory. In Hand-book in OR and MS, edited by D.P. Heyman and M.J. Sobel, 2, pp. 605-652, 1990 (Elsevier Science Publishers: Amesterdam).
-
Porteus, E.L., Stochastic inventory theory. In Hand-book in OR and MS, edited by D.P. Heyman and M.J. Sobel, Vol. 2, pp. 605-652, 1990 (Elsevier Science Publishers: Amesterdam).
-
-
-
-
22
-
-
0037431665
-
The detailed coordination problem in a two-level assembly system with stochastic lead times
-
Tang, O. and Grubbström, R.W., The detailed coordination problem in a two-level assembly system with stochastic lead times. Int. J. Prod. Econ., 2003, 81-82, 415-429.
-
(2003)
Int. J. Prod. Econ
, vol.81-82
, pp. 415-429
-
-
Tang, O.1
Grubbström, R.W.2
-
23
-
-
0032121661
-
Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system
-
Wilhelm, W.E. and Som, P., Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system. Euro. J. Oper. Res., 1998, 108, 74-93.
-
(1998)
Euro. J. Oper. Res
, vol.108
, pp. 74-93
-
-
Wilhelm, W.E.1
Som, P.2
-
24
-
-
0023207074
-
Setting planned leadtimes in serial production systems with tardiness costs
-
Yano, C.A., Setting planned leadtimes in serial production systems with tardiness costs. Man. Sci., 1987a, 33(1), 95-106.
-
(1987)
Man. Sci
, vol.33
, Issue.1
, pp. 95-106
-
-
Yano, C.A.1
-
25
-
-
0023419888
-
Planned leadtimes for serial production systems
-
Yano, C.A., Planned leadtimes for serial production systems. IIE Trans., 1987b, 19(3), 300-307.
-
(1987)
IIE Trans
, vol.19
, Issue.3
, pp. 300-307
-
-
Yano, C.A.1
-
26
-
-
0023558979
-
Stochastic leadtimes in two-level assembly systems
-
Yano, C.A., Stochastic leadtimes in two-level assembly systems. IIE Trans., 1987c, 19(4), 95-106.
-
(1987)
IIE Trans
, vol.19
, Issue.4
, pp. 95-106
-
-
Yano, C.A.1
-
27
-
-
0032000895
-
a review
-
Parameters affecting the effectiveness of MRP systems
-
Yeung, J.H.Y., Wong, W.C.K. and Ma, L., Parameters affecting the effectiveness of MRP systems: a review. Int. J. Prod. Res., 1998, 36, 313-331.
-
(1998)
Int. J. Prod. Res
, vol.36
, pp. 313-331
-
-
Yeung, J.H.Y.1
Wong, W.C.K.2
Ma, L.3
-
28
-
-
0026472180
-
On properties of stochastic inventory systems
-
Zheng, Y.S., On properties of stochastic inventory systems. Man. Sci., 1992, 38, 87-103.
-
(1992)
Man. Sci
, vol.38
, pp. 87-103
-
-
Zheng, Y.S.1
-
29
-
-
0022810192
-
Stochastic leadtimes in continuous-time inventory models
-
Zipkin, P., Stochastic leadtimes in continuous-time inventory models. Naval Res. Logist. Quart., 1986, 33, 763-774.
-
(1986)
Naval Res. Logist. Quart
, vol.33
, pp. 763-774
-
-
Zipkin, P.1
|