메뉴 건너뛰기




Volumn 46, Issue 19, 2008, Pages 5441-5467

Optimal supply planning in MRP environments for assembly systems with random component procurement times

Author keywords

Assembly systems; Branch and bound; Discrete model; MRP environment; Planned lead times optimization; Random lead times; Supply planning

Indexed keywords

ASSEMBLY; CLUSTER ANALYSIS; MATHEMATICAL MODELS; PRODUCTION CONTROL; RANDOM PROCESSES; RANDOM VARIABLES; RIVETING; SUPPLY CHAIN MANAGEMENT; SUPPLY CHAINS; TECHNOLOGY;

EID: 52149083966     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540802273827     Document Type: Conference Paper
Times cited : (49)

References (29)
  • 1
    • 33748753940 scopus 로고    scopus 로고
    • Inventory control in a multi-supplier system
    • Arda, Y. and Hennet, J.-C., Inventory control in a multi-supplier system. Int. J. Prod. Econ., 2006, 104(2), 249-259.
    • (2006) Int. J. Prod. Econ , vol.104 , Issue.2 , pp. 249-259
    • Arda, Y.1    Hennet, J.-C.2
  • 3
    • 0000892272 scopus 로고    scopus 로고
    • Using the deterministic EOQ formula in stochastic inventory control
    • Axsäter, S., Using the deterministic EOQ formula in stochastic inventory control. Man. Sci., 1996, 42, 830-834.
    • (1996) Man. Sci , vol.42 , pp. 830-834
    • Axsäter, S.1
  • 4
    • 0033080209 scopus 로고    scopus 로고
    • The effects of partial order release and component reservation on inventory and customer service performance in an MRP environment
    • Bragg, DJ., Duplaga, E.A. and Watis, CA., The effects of partial order release and component reservation on inventory and customer service performance in an MRP environment. Int. J. Prod. Res., 1999, 37, 523-538.
    • (1999) Int. J. Prod. Res , vol.37 , pp. 523-538
    • Bragg, D.J.1    Duplaga, E.A.2    Watis, C.A.3
  • 5
    • 84989726438 scopus 로고
    • Supply management in assembly systems
    • Chu, C., Proth, J.M. and Xie, X., Supply management in assembly systems. Naval Res. Logist., 1993, 40, 933-949.
    • (1993) Naval Res. Logist , vol.40 , pp. 933-949
    • Chu, C.1    Proth, J.M.2    Xie, X.3
  • 6
    • 0037151234 scopus 로고    scopus 로고
    • A model for supply planning under lead time uncertainty
    • Dolgui, A. and Louly, M.A., A model for supply planning under lead time uncertainty. Int. J. Prod. Econ., 2002, 78, 145-152.
    • (2002) Int. J. Prod. Econ , vol.78 , pp. 145-152
    • Dolgui, A.1    Louly, M.A.2
  • 7
    • 36349035891 scopus 로고    scopus 로고
    • A survey on supply planning under uncertainties in MRP environments
    • edited by P. Horacek, M. Simandl and P. Zitek, pp, Elsevier: Oxford, 3-8 July, Prague, Czech Republic
    • Dolgui, A., Louly, M.-A. and Prodhon, C., A survey on supply planning under uncertainties in MRP environments. In Selected Plenaries, Milestones and Surveys. 16th IFAC World Congress, edited by P. Horacek, M. Simandl and P. Zitek, pp. 228-239, 2005 (Elsevier: Oxford). 3-8 July 2005, Prague, Czech Republic.
    • (2005) Selected Plenaries, Milestones and Surveys. 16th IFAC World Congress , pp. 228-239
    • Dolgui, A.1    Louly, M.-A.2    Prodhon, C.3
  • 8
    • 0036498097 scopus 로고    scopus 로고
    • Optimal leadtimes planning in serial production systems with earliness and tardiness costs
    • Elhafsi, M., Optimal leadtimes planning in serial production systems with earliness and tardiness costs. HE Trans., 2002, 34, 233-243.
    • (2002) HE Trans , vol.34 , pp. 233-243
    • Elhafsi, M.1
  • 9
    • 0000757562 scopus 로고
    • MRP systems under supply and process uncertainty in an integrated shop floor control
    • Gupta, S.M. and Brennan, L., MRP systems under supply and process uncertainty in an integrated shop floor control. Int. J. Prod. Res., 1995, 33, 205-220.
    • (1995) Int. J. Prod. Res , vol.33 , pp. 205-220
    • Gupta, S.M.1    Brennan, L.2
  • 10
    • 0030285543 scopus 로고    scopus 로고
    • Optimal order policies in assembly systems with random demand and random supplier delivery
    • Gurnani, H., Akella, R. and Lehoczky, J., Optimal order policies in assembly systems with random demand and random supplier delivery. IIE Trans., 1996, 28, 865-878.
    • (1996) IIE Trans , vol.28 , pp. 865-878
    • Gurnani, H.1    Akella, R.2    Lehoczky, J.3
  • 12
    • 0032143246 scopus 로고    scopus 로고
    • MRP system nervousness and forecast errors
    • Ho, C.J. and Ireland, T.C., MRP system nervousness and forecast errors. Int. J. Prod. Res., 1998, 36, 2285-2299.
    • (1998) Int. J. Prod. Res , vol.36 , pp. 2285-2299
    • Ho, C.J.1    Ireland, T.C.2
  • 13
    • 0011700586 scopus 로고
    • A dynamic inventory model with stochastic lead times
    • Kaplan, R., A dynamic inventory model with stochastic lead times. Manage. Sci., 1970, 16, 491-507.
    • (1970) Manage. Sci , vol.16 , pp. 491-507
    • Kaplan, R.1
  • 14
    • 4444318605 scopus 로고    scopus 로고
    • The (s,Q) inventory model with Erlang time and deterministic demand
    • Kim, J.G., Sun, D., He, X.J. and Hayya, J.C., The (s,Q) inventory model with Erlang time and deterministic demand. Naval Res. Logist., 2004, 51, 906-923.
    • (2004) Naval Res. Logist , vol.51 , pp. 906-923
    • Kim, J.G.1    Sun, D.2    He, X.J.3    Hayya, J.C.4
  • 16
    • 0041368936 scopus 로고
    • The EOQ model under stochastic lead times
    • Liberatore, M.J., The EOQ model under stochastic lead times. Oper. Res., 1979, 27, 391-396.
    • (1979) Oper. Res , vol.27 , pp. 391-396
    • Liberatore, M.J.1
  • 17
    • 0037146389 scopus 로고    scopus 로고
    • Newsboy model for supply planning of assembly systems
    • Louly, M.A. and Dolgui, A., Newsboy model for supply planning of assembly systems. Int. J. Prod. Res., 2002, 40, 4401-4414.
    • (2002) Int. J. Prod. Res , vol.40 , pp. 4401-4414
    • Louly, M.A.1    Dolgui, A.2
  • 18
    • 67349171899 scopus 로고    scopus 로고
    • Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm
    • doi: 10.1016/j.ejor.2007.11.066
    • Louly, M.A. and Dolgui, A., Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm. Eur. J. Oper. Res., 2008, doi: 10.1016/j.ejor.2007.11.066.
    • (2008) Eur. J. Oper. Res
    • Louly, M.A.1    Dolgui, A.2
  • 19
  • 20
    • 0031123532 scopus 로고    scopus 로고
    • Joint optimisation of lot-sizes, safety stocks and safety lead times in an MRP system
    • Molinder, A., Joint optimisation of lot-sizes, safety stocks and safety lead times in an MRP system. Int. J. Prod. Res., 1997, 35, 983-994.
    • (1997) Int. J. Prod. Res , vol.35 , pp. 983-994
    • Molinder, A.1
  • 21
    • 76049122168 scopus 로고    scopus 로고
    • Porteus, E.L., Stochastic inventory theory. In Hand-book in OR and MS, edited by D.P. Heyman and M.J. Sobel, 2, pp. 605-652, 1990 (Elsevier Science Publishers: Amesterdam).
    • Porteus, E.L., Stochastic inventory theory. In Hand-book in OR and MS, edited by D.P. Heyman and M.J. Sobel, Vol. 2, pp. 605-652, 1990 (Elsevier Science Publishers: Amesterdam).
  • 22
    • 0037431665 scopus 로고    scopus 로고
    • The detailed coordination problem in a two-level assembly system with stochastic lead times
    • Tang, O. and Grubbström, R.W., The detailed coordination problem in a two-level assembly system with stochastic lead times. Int. J. Prod. Econ., 2003, 81-82, 415-429.
    • (2003) Int. J. Prod. Econ , vol.81-82 , pp. 415-429
    • Tang, O.1    Grubbström, R.W.2
  • 23
    • 0032121661 scopus 로고    scopus 로고
    • Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system
    • Wilhelm, W.E. and Som, P., Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system. Euro. J. Oper. Res., 1998, 108, 74-93.
    • (1998) Euro. J. Oper. Res , vol.108 , pp. 74-93
    • Wilhelm, W.E.1    Som, P.2
  • 24
    • 0023207074 scopus 로고
    • Setting planned leadtimes in serial production systems with tardiness costs
    • Yano, C.A., Setting planned leadtimes in serial production systems with tardiness costs. Man. Sci., 1987a, 33(1), 95-106.
    • (1987) Man. Sci , vol.33 , Issue.1 , pp. 95-106
    • Yano, C.A.1
  • 25
    • 0023419888 scopus 로고
    • Planned leadtimes for serial production systems
    • Yano, C.A., Planned leadtimes for serial production systems. IIE Trans., 1987b, 19(3), 300-307.
    • (1987) IIE Trans , vol.19 , Issue.3 , pp. 300-307
    • Yano, C.A.1
  • 26
    • 0023558979 scopus 로고
    • Stochastic leadtimes in two-level assembly systems
    • Yano, C.A., Stochastic leadtimes in two-level assembly systems. IIE Trans., 1987c, 19(4), 95-106.
    • (1987) IIE Trans , vol.19 , Issue.4 , pp. 95-106
    • Yano, C.A.1
  • 27
    • 0032000895 scopus 로고    scopus 로고
    • a review
    • Parameters affecting the effectiveness of MRP systems
    • Yeung, J.H.Y., Wong, W.C.K. and Ma, L., Parameters affecting the effectiveness of MRP systems: a review. Int. J. Prod. Res., 1998, 36, 313-331.
    • (1998) Int. J. Prod. Res , vol.36 , pp. 313-331
    • Yeung, J.H.Y.1    Wong, W.C.K.2    Ma, L.3
  • 28
    • 0026472180 scopus 로고
    • On properties of stochastic inventory systems
    • Zheng, Y.S., On properties of stochastic inventory systems. Man. Sci., 1992, 38, 87-103.
    • (1992) Man. Sci , vol.38 , pp. 87-103
    • Zheng, Y.S.1
  • 29
    • 0022810192 scopus 로고
    • Stochastic leadtimes in continuous-time inventory models
    • Zipkin, P., Stochastic leadtimes in continuous-time inventory models. Naval Res. Logist. Quart., 1986, 33, 763-774.
    • (1986) Naval Res. Logist. Quart , vol.33 , pp. 763-774
    • Zipkin, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.