Volumn , Issue , 2006, Pages 1302-1309

A new heuristic to solve RCPSP with multiple execution modes and Multi-Skilled Labor

Author keywords

Assignment problem; Makespan; Project scheduling

Indexed keywords

CONTROL THEORY; PRODUCTION ENGINEERING; SCHEDULING;

EID: 51749099591     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/CESA.2006.313517     Document Type: Conference Paper
Times cited : (24)

References (18)
  • 1
    • 0038522575 scopus 로고    scopus 로고
    • Insertion techniques for static and dynamic resource-constrained project scheduling
    • C. Artigues, P. Michelon, S. Reusser, "Insertion techniques for static and dynamic resource-constrained project scheduling," European Journal of Operational Research, vol, 149, pp. 249-267, 2003.
    • (2003) European Journal of Operational Research , vol.149 , pp. 249-267
    • Artigues, C.1    Michelon, P.2    Reusser, S.3
  • 2
    • 0019342681 scopus 로고
    • Scheduling projects to resource constraints: Classification and complexity
    • Blazewicz, J., Lenstra, J.K. and Rinnooy Kan, A. H. G., "Scheduling projects to resource constraints: Classification and complexity," Discrete Applied Mathematics, vol. 5, pp. 11-24, 1959.
    • (1959) Discrete Applied Mathematics , vol.5 , pp. 11-24
    • Blazewicz, J.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3
  • 3
    • 0030124780 scopus 로고    scopus 로고
    • A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
    • F.F. Boctor, "A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes", European Journal of Operational Research, vol.90, pp. 349-361, 1996.
    • (1996) European Journal of Operational Research , vol.90 , pp. 349-361
    • Boctor, F.F.1
  • 4
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple modes version
    • K. Bouleimen, H. Lecocq, "A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple modes version," European Journal of Operational Research, vol. 149, pp. 268-281, 2003.
    • (2003) European Journal of Operational Research , vol.149 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 5
    • 0001691215 scopus 로고    scopus 로고
    • Scheduling Parallel Manufacturing Cells with Resource Flexibility
    • R. L. Daniels, B. J. Hoopes, and J. B. Mazzola, "Scheduling Parallel Manufacturing Cells with Resource Flexibility," Management Science, vol. 42, pp. 1260-1276, 1996.
    • (1996) Management Science , vol.42 , pp. 1260-1276
    • Daniels, R.L.1    Hoopes, B.J.2    Mazzola, J.B.3
  • 6
    • 0043173975 scopus 로고    scopus 로고
    • Extensions of an integrated approach for multi-resource shop scheduling
    • S. Dauzere-Peres, C. Pavageau, "Extensions of an integrated approach for multi-resource shop scheduling," IEEE Transactions, vol. 33, pp. 207-213, 2003.
    • (2003) IEEE Transactions , vol.33 , pp. 207-213
    • Dauzere-Peres, S.1    Pavageau, C.2
  • 8
    • 0042403497 scopus 로고    scopus 로고
    • The discrete time/resource trade-off problem in project networks-A branch-and-bound approach
    • 9717, Department of Applied Economics, K.U. Leuven
    • Demeulemeester, E., Reyck, B. D. and Herroelen, W., "The discrete time/resource trade-off problem in project networks-A branch-and-bound approach", Research report 9717, Department of Applied Economics, K.U. Leuven, 1997.
    • (1997) Research report
    • Demeulemeester, E.1    Reyck, B.D.2    Herroelen, W.3
  • 9
    • 0034559432 scopus 로고    scopus 로고
    • Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
    • S. Hartmann, R. Kolisch, "Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem," European Journal of Operational Research, vol. 127, pp. 394-407, 2000.
    • (2000) European Journal of Operational Research , vol.127 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 10
    • 0040577754 scopus 로고    scopus 로고
    • S. Hartmann and A. Drexl, Project scheduling with multiple modes: A comparison of exact algorithms, Networks, 32, pp. 283-297, 1, 998.
    • S. Hartmann and A. Drexl, "Project scheduling with multiple modes: A comparison of exact algorithms," Networks, vol. 32, pp. 283-297, 1, 998.
  • 11
    • 0032042933 scopus 로고    scopus 로고
    • Resource- Constrained Project Scheduling: A survey of recent developments
    • W. Herroelen, B. De Reyck and E. Demeulemeester, "Resource- Constrained Project Scheduling: A survey of recent developments," Computer Ops Res., vol. 25, pp. 279-302, 1998.
    • (1998) Computer Ops Res , vol.25 , pp. 279-302
    • Herroelen, W.1    De Reyck, B.2    Demeulemeester, E.3
  • 12
    • 33745797772 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • to appear
    • R. Kolisch, S. Hartmann, "Experimental investigation of heuristics for resource-constrained project scheduling: An update," European Journal of Operational Researeh, 2005, to appear.
    • (2005) European Journal of Operational Researeh
    • Kolisch, R.1    Hartmann, S.2
  • 13
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • R. Kolisch, A. Sprecher and A. Drexl, "Characterization and generation of a general class of resource-constrained project scheduling problems", Management Science, vol. 41, pp. 1693-1703, 1995.
    • (1995) Management Science , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 14
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • R. Kolisch, "Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation," European Journal of Operational Research, vol. 90, pp. 320-333.1996.
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 15
    • 0002577337 scopus 로고    scopus 로고
    • Effective Neighborhood Functions for the Flexible Job Shop Problem
    • M. Mastrolilli, L.M. Gambardella, "Effective Neighborhood Functions for the Flexible Job Shop Problem", Journal of Scheduling, vol. 3, pp.3-20, 2000.
    • (2000) Journal of Scheduling , vol.3 , pp. 3-20
    • Mastrolilli, M.1    Gambardella, L.M.2
  • 16
    • 51749100127 scopus 로고    scopus 로고
    • Greedy Heuristic and Genetic Algorithms for the Muiti- Shop Scheduling with Resource Flexibility
    • France
    • Y. Mati, N. Rezg, and X. Xie, "Greedy Heuristic and Genetic Algorithms for the Muiti- Shop Scheduling with Resource Flexibility," INRIA, MACSI Project, France, 2002.
    • (2002) INRIA, MACSI Project
    • Mati, Y.1    Rezg, N.2    Xie, X.3
  • 17
    • 0010909013 scopus 로고    scopus 로고
    • Class-Based Control Schemes for Parameterized Project Scheduling Heuristics,
    • Technical Report 456, Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel, April
    • A. Schimer, S. Riesenberg "Class-Based Control Schemes for Parameterized Project Scheduling Heuristics," Technical Report 456, Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel, April 1998.
    • (1998)
    • Schimer, A.1    Riesenberg, S.2
  • 18
    • 0029636114 scopus 로고
    • Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
    • A. Sprecher, R. Kolisch, A. Drexl, "Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem," European Journal of Operational Research, vol. 80, pp. 94-102, 1995.
    • (1995) European Journal of Operational Research , vol.80 , pp. 94-102
    • Sprecher, A.1    Kolisch, R.2    Drexl, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.