-
1
-
-
0000870914
-
A review of production planning and scheduling in smaller manufacturing companies in the UK
-
Halsall, D.N., Muhlemann, A.P. and Price, D.H.R. (1994) ‘A review of production planning and scheduling in smaller manufacturing companies in the UK’, Journal of Production Planning and Control, Vol. 5, No. 5, pp.485-493.
-
(1994)
Journal of Production Planning and Control
, vol.5
, Issue.5
, pp. 485-493
-
-
Halsall, D.N.1
Muhlemann, A.P.2
Price, D.H.R.3
-
4
-
-
0001872156
-
Production planning and scheduling in CIM
-
G.X. Ritter (Ed.) North Holland: Elsevier Science Publishers B.V
-
Solberg, J.J. (1989) ‘Production planning and scheduling in CIM’, in Information Processing, G.X. Ritter (Ed.) North Holland: Elsevier Science Publishers B.V., pp.919-925.
-
(1989)
Information Processing
, pp. 919-925
-
-
Solberg, J.J.1
-
5
-
-
0011663295
-
Holonic manufacturing systems and LiM
-
Brown et al. (Eds.)
-
Van Brussel, H., Valckenaers, P., Wyns, J., Bongaerts, L. and Detand, J. (1997), ‘Holonic manufacturing systems and LiM’, in IT and Manufacturing Partnerships: Brown et al. (Eds.), pp.185-196.
-
(1997)
IT and Manufacturing Partnerships
, pp. 185-196
-
-
Van Brussel, H.1
Valckenaers, P.2
Wyns, J.3
Bongaerts, L.4
Detand, J.5
-
6
-
-
0242564163
-
Bionic manufacturing systems-bio-modelon based systems design
-
New Orleans, Louisiana
-
Okino, N. (1989) ‘Bionic manufacturing systems-bio-modelon based systems design’, Proceedings of the CAM-I Annual International Conference, New Orleans, Louisiana, pp.485-492.
-
(1989)
Proceedings of the CAM-I Annual International Conference
, pp. 485-492
-
-
Okino, N.1
-
8
-
-
9944245978
-
Business process reengineering: teams in business
-
Croxall, S. (1995) ‘Business process reengineering: teams in business’, Manufacturing Engineer, Vol. 74, No. 1, pp.35-37.
-
(1995)
Manufacturing Engineer
, vol.74
, Issue.1
, pp. 35-37
-
-
Croxall, S.1
-
9
-
-
0002337873
-
Sustaining high performance through self-managed work teams
-
Elmuti, D. (1996) ‘Sustaining high performance through self-managed work teams’, Industrial Management, Vol. 38, No. 2, pp.4-9.
-
(1996)
Industrial Management
, vol.38
, Issue.2
, pp. 4-9
-
-
Elmuti, D.1
-
10
-
-
0004176585
-
-
London: Chapman & Hall
-
Bauer, A., Bowden, R., Browne, J., Duggan, J. and Lyons, G. (1991) Shop-floor Control Systems: From Design to Implementation, London: Chapman & Hall.
-
(1991)
Shop-floor Control Systems: From Design to Implementation
-
-
Bauer, A.1
Bowden, R.2
Browne, J.3
Duggan, J.4
Lyons, G.5
-
11
-
-
0029378422
-
A review of hierarchical production planning and its applicability for modern manufacturing
-
McKay, K.N., Safayeni, F.R. and Buzacott, J.A. (1995) ‘A review of hierarchical production planning and its applicability for modern manufacturing’, Journal of Production Planning & Control, Vol. 6, No. 5, pp.384-394.
-
(1995)
Journal of Production Planning & Control
, vol.6
, Issue.5
, pp. 384-394
-
-
McKay, K.N.1
Safayeni, F.R.2
Buzacott, J.A.3
-
12
-
-
80052725713
-
Master production scheduling: a concurrent planning approach
-
Higgins, P. and Browne, J. (1992) ‘Master production scheduling: a concurrent planning approach’, International Journal of Production Planning and Control, Vol. 3, No. 1, pp.2-18.
-
(1992)
International Journal of Production Planning and Control
, vol.3
, Issue.1
, pp. 2-18
-
-
Higgins, P.1
Browne, J.2
-
13
-
-
0025433556
-
Medium to short finite capacity scheduling: a planning methodology for capacity constrained workshops
-
McCarthy, S.W. and Barber, K.D. (1989) ‘Medium to short finite capacity scheduling: a planning methodology for capacity constrained workshops’, Engineering Costs and Production Economics, pp.189-199.
-
(1989)
Engineering Costs and Production Economics
, pp. 189-199
-
-
McCarthy, S.W.1
Barber, K.D.2
-
14
-
-
3543049469
-
Integrating production activity control into a hierarchical productionplanning model
-
Meybodi, M.Z. (1995) ‘Integrating production activity control into a hierarchical productionplanning model’, International Journal Operations & Production Management, Vol. 15, No. 5, pp.4-25.
-
(1995)
International Journal Operations & Production Management
, vol.15
, Issue.5
, pp. 4-25
-
-
Meybodi, M.Z.1
-
15
-
-
0027555416
-
A heuristic algorithm for master production schedule generation with finite capacity and sequence dependent setup
-
Arosio, M. and Sianesi, A. (1993) ‘A heuristic algorithm for master production schedule generation with finite capacity and sequence dependent setup’, International Journal of Production Research, Vol. 31, No. 3, pp.531-553.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.3
, pp. 531-553
-
-
Arosio, M.1
Sianesi, A.2
-
17
-
-
0011675926
-
Cell control research-current status and development trends
-
Xiang, D. and O’Brien, C. (1995) ‘Cell control research-current status and development trends’, International Journal of Production Research, Vol. 33, No. 8, pp.2325-2352.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.8
, pp. 2325-2352
-
-
Xiang, D.1
O’Brien, C.2
-
18
-
-
43949173033
-
New technological and organizational solutions to shop-floor control
-
Kohler, C. (1993) ‘New technological and organizational solutions to shop-floor control’, Journal of Computer Integrated Manufacturing Systems, Vol. 6, No. 1, pp.44-52.
-
(1993)
Journal of Computer Integrated Manufacturing Systems
, vol.6
, Issue.1
, pp. 44-52
-
-
Kohler, C.1
-
19
-
-
0344882492
-
Production planning and control systems - state of the art and new directions
-
Adelsberger etal. (Ed.), Berlin: Springer Verlag
-
Sridharan, V. and Kanet, J.J. (1995) ‘Production planning and control systems - state of the art and new directions’, in Information Management in Computer Integrated Manufacturing, Adelsberger etal. (Ed.), Berlin: Springer Verlag, pp.195-216.
-
(1995)
Information Management in Computer Integrated Manufacturing
, pp. 195-216
-
-
Sridharan, V.1
Kanet, J.J.2
-
20
-
-
0029404744
-
A learning-based methodology for dynamic scheduling in distributed manufacturing systems
-
Chiu, C. and Yih, Y. (1995) ‘A learning-based methodology for dynamic scheduling in distributed manufacturing systems’, International Journal of Production Research, Vol. 33, No. 11, pp.3217-3232.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.11
, pp. 3217-3232
-
-
Chiu, C.1
Yih, Y.2
-
21
-
-
0345889518
-
Distributed control of automated manufacturing systems
-
Ramaswamy, S.E. and Joshi, S. (1996) ‘Distributed control of automated manufacturing systems’, Proceeding of CIRP Seminars - Manufacturing Systems, Vol. 25, No. 4, pp.353-359.
-
(1996)
Proceeding of CIRP Seminars - Manufacturing Systems
, vol.25
, Issue.4
, pp. 353-359
-
-
Ramaswamy, S.E.1
Joshi, S.2
-
22
-
-
0030216019
-
A distributed task planning system for computer- integrated manufacturing systems
-
Kokkinaki, A.I. and Valavanis, K.P. (1996) ‘A distributed task planning system for computer- integrated manufacturing systems’, Journal of Intelligent Manufacturing, Vol. 7, No. 4, pp.293-309.
-
(1996)
Journal of Intelligent Manufacturing
, vol.7
, Issue.4
, pp. 293-309
-
-
Kokkinaki, A.I.1
Valavanis, K.P.2
-
23
-
-
0012103535
-
An architecture for real time distributed scheduling
-
A. Famili et al. (Ed.), Cambridge USA: AAAI Press
-
Hadavi, K., Hsu, W-L., Chen, T. and Lee, C-N. (1992) ‘An architecture for real time distributed scheduling’, in Artificial Intelligence Applications in Manufacturing, A. Famili et al. (Ed.), Cambridge USA: AAAI Press, pp.215-234.
-
(1992)
Artificial Intelligence Applications in Manufacturing
, pp. 215-234
-
-
Hadavi, K.1
Hsu, W.-L.2
Chen, T.3
Lee, C.-N.4
-
25
-
-
0025476281
-
Development of a knowledge-based system for dynamic scheduling
-
Sarin, S.C. and Salgame, R.R. (1990) ‘Development of a knowledge-based system for dynamic scheduling’, International Journal of Production Research, Vol. 28, No. 8, pp.1499-1512.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.8
, pp. 1499-1512
-
-
Sarin, S.C.1
Salgame, R.R.2
-
26
-
-
84945726429
-
Contingency and performance-driven reactive scheduling in discrete event dynamic environment
-
C. Walter (Ed.), Holland: Elsevier Science Publishers B.V
-
Szelke, E. and Markus, G. (1994) ‘Contingency and performance-driven reactive scheduling in discrete event dynamic environment’, in Production Management Methods, C. Walter (Ed.), Holland: Elsevier Science Publishers B.V., pp.225-233.
-
(1994)
Production Management Methods
, pp. 225-233
-
-
Szelke, E.1
Markus, G.2
-
27
-
-
0025597496
-
Hybrid hierarchical scheduling and control systems in manufacturing
-
Bona, B. and Brandimarte, P. (1990) ‘Hybrid hierarchical scheduling and control systems in manufacturing’, IEEE Transaction: Robotics & Automation, Vol. 6, No. 6, pp.673-686.
-
(1990)
IEEE Transaction: Robotics & Automation
, vol.6
, Issue.6
, pp. 673-686
-
-
Bona, B.1
Brandimarte, P.2
-
28
-
-
0028590749
-
Real time distributed scheduling of heterarchical manufacturing systems
-
Duffie, N.A. and Parbhu, V.V. (1994) ‘Real time distributed scheduling of heterarchical manufacturing systems’, Journal of Manufacturing Systems, Vol. 13, No. 2.
-
(1994)
Journal of Manufacturing Systems
, vol.13
, Issue.2
-
-
Duffie, N.A.1
Parbhu, V.V.2
-
29
-
-
0000536995
-
Heterarchical control of highly distributed manufacturing systems
-
Duffie, N.A. and Parbhu, V.V. (1996) ‘Heterarchical control of highly distributed manufacturing systems’, International Journal of Computer Integrated Manufacturing, Vol. 9, No. 4, pp.270-281.
-
(1996)
International Journal of Computer Integrated Manufacturing
, vol.9
, Issue.4
, pp. 270-281
-
-
Duffie, N.A.1
Parbhu, V.V.2
-
30
-
-
0030538183
-
Team time: a model for developing self-directed work teams
-
Van Amelsvoort, P. and Benders, J. (1996) ‘Team time: a model for developing self-directed work teams’, International Journal of Operations & Production Management, Vol. 16, No. 2, pp.159-170.
-
(1996)
International Journal of Operations & Production Management
, vol.16
, Issue.2
, pp. 159-170
-
-
Van Amelsvoort, P.1
Benders, J.2
-
31
-
-
0007114130
-
Self-managed teams: the productivity breakthrough of the 1990s
-
Abbasi, S.M. and Hollman, K.W. (1994) ‘Self-managed teams: the productivity breakthrough of the 1990s, Journal of Managerial Psychology, Vol. 9, No. 7, pp.25-30.
-
(1994)
Journal of Managerial Psychology
, vol.9
, Issue.7
, pp. 25-30
-
-
Abbasi, S.M.1
Hollman, K.W.2
-
32
-
-
0002659380
-
The Leitstand - a new tool for computer integrated manufacturing
-
Adelsberger, H.H. and Kanet, J.J (1991), ‘The Leitstand - a new tool for computer integrated manufacturing’, Production and Inventory Management, Vol. 32, No. 1, pp.43-48.
-
(1991)
Production and Inventory Management
, vol.32
, Issue.1
, pp. 43-48
-
-
Adelsberger, H.H.1
Kanet, J.J.2
-
33
-
-
0025488846
-
The electronic Leitstand: a new tool for shop scheduling
-
Kanet, J.J. and Sridharan, V. (1990) ‘The electronic Leitstand: a new tool for shop scheduling’, Manufacturing Review, Vol. 3, No. 3, pp.161-170.
-
(1990)
Manufacturing Review
, vol.3
, Issue.3
, pp. 161-170
-
-
Kanet, J.J.1
Sridharan, V.2
-
34
-
-
0342900167
-
Modelling an international co-operative global complementary production system
-
Hiraki, S. and Watanabe, N. (1994) ‘Modelling an international co-operative global complementary production system’, Computers and Industrial Engineering, Vol. 27, Nos. 1-4, pp.205-208.
-
(1994)
Computers and Industrial Engineering
, vol.27
, Issue.1-4
, pp. 205-208
-
-
Hiraki, S.1
Watanabe, N.2
-
35
-
-
0002326640
-
ADDYMS: architecture for distributed dynamic manufacturing scheduling
-
A. Famili et al. (Ed.), Cambridge USA: AAAI Press
-
Butler, J. and Ohtsubo, H. (1992) ‘ADDYMS: architecture for distributed dynamic manufacturing scheduling’, in Artificial Intelligence Applications in Manufacturing, A. Famili et al. (Ed.), Cambridge USA: AAAI Press, pp.200-213.
-
(1992)
Artificial Intelligence Applications in Manufacturing
, pp. 200-213
-
-
Butler, J.1
Ohtsubo, H.2
-
36
-
-
0026103848
-
Resource allocation in distributed factory scheduling
-
Sycara, K., Roth, S.F., Sadeh, N. and Fox, M.S. (1991) ‘Resource allocation in distributed factory scheduling’, IEEE Expert, pp.29-40.
-
(1991)
IEEE Expert
, pp. 29-40
-
-
Sycara, K.1
Roth, S.F.2
Sadeh, N.3
Fox, M.S.4
-
37
-
-
0030397154
-
A distributed scheduling and shop-floor control method
-
Kim, K.H. and Bae, J.W (1996) ‘A distributed scheduling and shop-floor control method’, Computers & Industrial Engineering, Vol. 31, Nos. 3/4, pp.583-586.
-
(1996)
Computers & Industrial Engineering
, vol.31
, Issue.3-4
, pp. 583-586
-
-
Kim, K.H.1
Bae, J.W.2
-
38
-
-
0242665905
-
A proposed structure for distributed shopfloor control
-
Crowe, T.J. and Stahlman, E.J. (1995), ‘A proposed structure for distributed shopfloor control’, Journal of Integrated Manufacturing Systems, Vol. 6, No. 6, pp.31-36.
-
(1995)
Journal of Integrated Manufacturing Systems
, vol.6
, Issue.6
, pp. 31-36
-
-
Crowe, T.J.1
Stahlman, E.J.2
-
39
-
-
0028516156
-
Introducing intelligence in distributed systems management
-
Gaiti, D. (1994) ‘Introducing intelligence in distributed systems management’, Computer Communications, Vol. 17, No. 10, pp.729-738.
-
(1994)
Computer Communications
, vol.17
, Issue.10
, pp. 729-738
-
-
Gaiti, D.1
-
40
-
-
0027591270
-
Information system architecture for heterarchical control of large FMSs
-
Veeramani, D., Bhargava, B. and Barash, M.M. (1993) ‘Information system architecture for heterarchical control of large FMSs’, Journal of Computer Integrated Manufacturing Systems, Vol. 6, No. 2, pp.76-92.
-
(1993)
Journal of Computer Integrated Manufacturing Systems
, vol.6
, Issue.2
, pp. 76-92
-
-
Veeramani, D.1
Bhargava, B.2
Barash, M.M.3
-
41
-
-
0026253933
-
Intelligent dispatching for flexible manufacturing
-
Chandar, J. and Talavage, J. (1991) ‘Intelligent dispatching for flexible manufacturing’, International Journal of Production Research, Vol. 29, No. 11, pp.2259-2278.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.11
, pp. 2259-2278
-
-
Chandar, J.1
Talavage, J.2
-
42
-
-
0029710092
-
A collaborative scheduling system for make-to- order manufacturing
-
Lee, K.I., Kang, M. and Park, J.H. (1996) ‘A collaborative scheduling system for make-to- order manufacturing’, Annals CIRP, Vol. 45, No. 1, pp.461-464.
-
(1996)
Annals CIRP
, vol.45
, Issue.1
, pp. 461-464
-
-
Lee, K.I.1
Kang, M.2
Park, J.H.3
-
43
-
-
0029487841
-
Coordination of distributed production resources for responsibility- based manufacturing
-
Adamides, E.D. (1995) ‘Coordination of distributed production resources for responsibility- based manufacturing’, Journal of Intelligent Manufacturing, Vol. 6, No. 6, pp.415-427.
-
(1995)
Journal of Intelligent Manufacturing
, vol.6
, Issue.6
, pp. 415-427
-
-
Adamides, E.D.1
-
45
-
-
0001573944
-
Implementation of a demand-pull system in a job shop environment
-
Lee, C.-Y., Lin, C.-S., Uzsoy, R. and Wong, C-C. (1994) ‘Implementation of a demand-pull system in a job shop environment’, International Journal of Production Research, Vol. 32, No. 12, pp.2915-2927.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.12
, pp. 2915-2927
-
-
Lee, C.-Y.1
Lin, C.-S.2
Uzsoy, R.3
Wong, C.-C.4
-
46
-
-
0031233993
-
Simultaneous scheduling of workpieces, fixtures and cutting tools within flexible machining cells
-
Rahimifard, S. and Newman, S.T. (1997) ‘Simultaneous scheduling of workpieces, fixtures and cutting tools within flexible machining cells’, International Journal of Production Research, Vol. 35, No. 9, pp.2379-2397.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.9
, pp. 2379-2397
-
-
Rahimifard, S.1
Newman, S.T.2
-
47
-
-
0043025336
-
A development system for intelligent agent manufacturing software
-
Kwok, A.D. and Norrie, D.H. (1994) ‘A development system for intelligent agent manufacturing software’, Integrated Manufacturing Systems, Vol. 5, Nos. 4/5, pp.64-76.
-
(1994)
Integrated Manufacturing Systems
, vol.5
, Issue.4-5
, pp. 64-76
-
-
Kwok, A.D.1
Norrie, D.H.2
-
48
-
-
0030216517
-
Multi-agent mediator architecture for distributed manufacturing
-
Maturana, F.P. and Norrie, D.H. (1996) ‘Multi-agent mediator architecture for distributed manufacturing,’ Journal of Intelligent Manufacturing, Vol. 7 No. 4, pp.257-270.
-
(1996)
Journal of Intelligent Manufacturing
, vol.7
, Issue.4
, pp. 257-270
-
-
Maturana, F.P.1
Norrie, D.H.2
-
49
-
-
0030380690
-
An Agent-driven approach to design factory information systems
-
Lefrancois, P., Cloutier, L. and Monteruil, B. (1996) ‘An Agent-driven approach to design factory information systems’, Computers in Industry, Vol. 32, No. 2, pp.197-217.
-
(1996)
Computers in Industry
, vol.32
, Issue.2
, pp. 197-217
-
-
Lefrancois, P.1
Cloutier, L.2
Monteruil, B.3
-
50
-
-
0031069104
-
Using multi-agent architecture in FMS for dynamic scheduling
-
19970
-
Kouiss, K., Pierreval, H. and Mebarki, N. (19970 ‘Using multi-agent architecture in FMS for dynamic scheduling’, Journal of Intelligent Manufacturing, Vol. 8, No. 1, pp.41-47.
-
Journal of Intelligent Manufacturing
, vol.8
, Issue.1
, pp. 41-47
-
-
Kouiss, K.1
Pierreval, H.2
Mebarki, N.3
|