메뉴 건너뛰기




Volumn 3, Issue 4-5, 2001, Pages 496-515

The planning and control of manufacturing SMEs

Author keywords

Distributed planning and control; heterarchical systems; interactive and reactive planning; team based manufacturing

Indexed keywords


EID: 50149094703     PISSN: 13682148     EISSN: None     Source Type: Journal    
DOI: 10.1504/ijmtm.2001.001426     Document Type: Article
Times cited : (2)

References (50)
  • 1
    • 0000870914 scopus 로고
    • A review of production planning and scheduling in smaller manufacturing companies in the UK
    • Halsall, D.N., Muhlemann, A.P. and Price, D.H.R. (1994) ‘A review of production planning and scheduling in smaller manufacturing companies in the UK’, Journal of Production Planning and Control, Vol. 5, No. 5, pp.485-493.
    • (1994) Journal of Production Planning and Control , vol.5 , Issue.5 , pp. 485-493
    • Halsall, D.N.1    Muhlemann, A.P.2    Price, D.H.R.3
  • 4
    • 0001872156 scopus 로고
    • Production planning and scheduling in CIM
    • G.X. Ritter (Ed.) North Holland: Elsevier Science Publishers B.V
    • Solberg, J.J. (1989) ‘Production planning and scheduling in CIM’, in Information Processing, G.X. Ritter (Ed.) North Holland: Elsevier Science Publishers B.V., pp.919-925.
    • (1989) Information Processing , pp. 919-925
    • Solberg, J.J.1
  • 6
    • 0242564163 scopus 로고
    • Bionic manufacturing systems-bio-modelon based systems design
    • New Orleans, Louisiana
    • Okino, N. (1989) ‘Bionic manufacturing systems-bio-modelon based systems design’, Proceedings of the CAM-I Annual International Conference, New Orleans, Louisiana, pp.485-492.
    • (1989) Proceedings of the CAM-I Annual International Conference , pp. 485-492
    • Okino, N.1
  • 8
    • 9944245978 scopus 로고
    • Business process reengineering: teams in business
    • Croxall, S. (1995) ‘Business process reengineering: teams in business’, Manufacturing Engineer, Vol. 74, No. 1, pp.35-37.
    • (1995) Manufacturing Engineer , vol.74 , Issue.1 , pp. 35-37
    • Croxall, S.1
  • 9
    • 0002337873 scopus 로고    scopus 로고
    • Sustaining high performance through self-managed work teams
    • Elmuti, D. (1996) ‘Sustaining high performance through self-managed work teams’, Industrial Management, Vol. 38, No. 2, pp.4-9.
    • (1996) Industrial Management , vol.38 , Issue.2 , pp. 4-9
    • Elmuti, D.1
  • 11
    • 0029378422 scopus 로고
    • A review of hierarchical production planning and its applicability for modern manufacturing
    • McKay, K.N., Safayeni, F.R. and Buzacott, J.A. (1995) ‘A review of hierarchical production planning and its applicability for modern manufacturing’, Journal of Production Planning & Control, Vol. 6, No. 5, pp.384-394.
    • (1995) Journal of Production Planning & Control , vol.6 , Issue.5 , pp. 384-394
    • McKay, K.N.1    Safayeni, F.R.2    Buzacott, J.A.3
  • 13
    • 0025433556 scopus 로고
    • Medium to short finite capacity scheduling: a planning methodology for capacity constrained workshops
    • McCarthy, S.W. and Barber, K.D. (1989) ‘Medium to short finite capacity scheduling: a planning methodology for capacity constrained workshops’, Engineering Costs and Production Economics, pp.189-199.
    • (1989) Engineering Costs and Production Economics , pp. 189-199
    • McCarthy, S.W.1    Barber, K.D.2
  • 14
    • 3543049469 scopus 로고
    • Integrating production activity control into a hierarchical productionplanning model
    • Meybodi, M.Z. (1995) ‘Integrating production activity control into a hierarchical productionplanning model’, International Journal Operations & Production Management, Vol. 15, No. 5, pp.4-25.
    • (1995) International Journal Operations & Production Management , vol.15 , Issue.5 , pp. 4-25
    • Meybodi, M.Z.1
  • 15
    • 0027555416 scopus 로고
    • A heuristic algorithm for master production schedule generation with finite capacity and sequence dependent setup
    • Arosio, M. and Sianesi, A. (1993) ‘A heuristic algorithm for master production schedule generation with finite capacity and sequence dependent setup’, International Journal of Production Research, Vol. 31, No. 3, pp.531-553.
    • (1993) International Journal of Production Research , vol.31 , Issue.3 , pp. 531-553
    • Arosio, M.1    Sianesi, A.2
  • 17
    • 0011675926 scopus 로고
    • Cell control research-current status and development trends
    • Xiang, D. and O’Brien, C. (1995) ‘Cell control research-current status and development trends’, International Journal of Production Research, Vol. 33, No. 8, pp.2325-2352.
    • (1995) International Journal of Production Research , vol.33 , Issue.8 , pp. 2325-2352
    • Xiang, D.1    O’Brien, C.2
  • 18
    • 43949173033 scopus 로고
    • New technological and organizational solutions to shop-floor control
    • Kohler, C. (1993) ‘New technological and organizational solutions to shop-floor control’, Journal of Computer Integrated Manufacturing Systems, Vol. 6, No. 1, pp.44-52.
    • (1993) Journal of Computer Integrated Manufacturing Systems , vol.6 , Issue.1 , pp. 44-52
    • Kohler, C.1
  • 19
    • 0344882492 scopus 로고
    • Production planning and control systems - state of the art and new directions
    • Adelsberger etal. (Ed.), Berlin: Springer Verlag
    • Sridharan, V. and Kanet, J.J. (1995) ‘Production planning and control systems - state of the art and new directions’, in Information Management in Computer Integrated Manufacturing, Adelsberger etal. (Ed.), Berlin: Springer Verlag, pp.195-216.
    • (1995) Information Management in Computer Integrated Manufacturing , pp. 195-216
    • Sridharan, V.1    Kanet, J.J.2
  • 20
    • 0029404744 scopus 로고
    • A learning-based methodology for dynamic scheduling in distributed manufacturing systems
    • Chiu, C. and Yih, Y. (1995) ‘A learning-based methodology for dynamic scheduling in distributed manufacturing systems’, International Journal of Production Research, Vol. 33, No. 11, pp.3217-3232.
    • (1995) International Journal of Production Research , vol.33 , Issue.11 , pp. 3217-3232
    • Chiu, C.1    Yih, Y.2
  • 22
    • 0030216019 scopus 로고    scopus 로고
    • A distributed task planning system for computer- integrated manufacturing systems
    • Kokkinaki, A.I. and Valavanis, K.P. (1996) ‘A distributed task planning system for computer- integrated manufacturing systems’, Journal of Intelligent Manufacturing, Vol. 7, No. 4, pp.293-309.
    • (1996) Journal of Intelligent Manufacturing , vol.7 , Issue.4 , pp. 293-309
    • Kokkinaki, A.I.1    Valavanis, K.P.2
  • 23
    • 0012103535 scopus 로고
    • An architecture for real time distributed scheduling
    • A. Famili et al. (Ed.), Cambridge USA: AAAI Press
    • Hadavi, K., Hsu, W-L., Chen, T. and Lee, C-N. (1992) ‘An architecture for real time distributed scheduling’, in Artificial Intelligence Applications in Manufacturing, A. Famili et al. (Ed.), Cambridge USA: AAAI Press, pp.215-234.
    • (1992) Artificial Intelligence Applications in Manufacturing , pp. 215-234
    • Hadavi, K.1    Hsu, W.-L.2    Chen, T.3    Lee, C.-N.4
  • 25
    • 0025476281 scopus 로고
    • Development of a knowledge-based system for dynamic scheduling
    • Sarin, S.C. and Salgame, R.R. (1990) ‘Development of a knowledge-based system for dynamic scheduling’, International Journal of Production Research, Vol. 28, No. 8, pp.1499-1512.
    • (1990) International Journal of Production Research , vol.28 , Issue.8 , pp. 1499-1512
    • Sarin, S.C.1    Salgame, R.R.2
  • 26
    • 84945726429 scopus 로고
    • Contingency and performance-driven reactive scheduling in discrete event dynamic environment
    • C. Walter (Ed.), Holland: Elsevier Science Publishers B.V
    • Szelke, E. and Markus, G. (1994) ‘Contingency and performance-driven reactive scheduling in discrete event dynamic environment’, in Production Management Methods, C. Walter (Ed.), Holland: Elsevier Science Publishers B.V., pp.225-233.
    • (1994) Production Management Methods , pp. 225-233
    • Szelke, E.1    Markus, G.2
  • 27
    • 0025597496 scopus 로고
    • Hybrid hierarchical scheduling and control systems in manufacturing
    • Bona, B. and Brandimarte, P. (1990) ‘Hybrid hierarchical scheduling and control systems in manufacturing’, IEEE Transaction: Robotics & Automation, Vol. 6, No. 6, pp.673-686.
    • (1990) IEEE Transaction: Robotics & Automation , vol.6 , Issue.6 , pp. 673-686
    • Bona, B.1    Brandimarte, P.2
  • 28
    • 0028590749 scopus 로고
    • Real time distributed scheduling of heterarchical manufacturing systems
    • Duffie, N.A. and Parbhu, V.V. (1994) ‘Real time distributed scheduling of heterarchical manufacturing systems’, Journal of Manufacturing Systems, Vol. 13, No. 2.
    • (1994) Journal of Manufacturing Systems , vol.13 , Issue.2
    • Duffie, N.A.1    Parbhu, V.V.2
  • 31
    • 0007114130 scopus 로고
    • Self-managed teams: the productivity breakthrough of the 1990s
    • Abbasi, S.M. and Hollman, K.W. (1994) ‘Self-managed teams: the productivity breakthrough of the 1990s, Journal of Managerial Psychology, Vol. 9, No. 7, pp.25-30.
    • (1994) Journal of Managerial Psychology , vol.9 , Issue.7 , pp. 25-30
    • Abbasi, S.M.1    Hollman, K.W.2
  • 32
    • 0002659380 scopus 로고
    • The Leitstand - a new tool for computer integrated manufacturing
    • Adelsberger, H.H. and Kanet, J.J (1991), ‘The Leitstand - a new tool for computer integrated manufacturing’, Production and Inventory Management, Vol. 32, No. 1, pp.43-48.
    • (1991) Production and Inventory Management , vol.32 , Issue.1 , pp. 43-48
    • Adelsberger, H.H.1    Kanet, J.J.2
  • 33
    • 0025488846 scopus 로고
    • The electronic Leitstand: a new tool for shop scheduling
    • Kanet, J.J. and Sridharan, V. (1990) ‘The electronic Leitstand: a new tool for shop scheduling’, Manufacturing Review, Vol. 3, No. 3, pp.161-170.
    • (1990) Manufacturing Review , vol.3 , Issue.3 , pp. 161-170
    • Kanet, J.J.1    Sridharan, V.2
  • 34
    • 0342900167 scopus 로고
    • Modelling an international co-operative global complementary production system
    • Hiraki, S. and Watanabe, N. (1994) ‘Modelling an international co-operative global complementary production system’, Computers and Industrial Engineering, Vol. 27, Nos. 1-4, pp.205-208.
    • (1994) Computers and Industrial Engineering , vol.27 , Issue.1-4 , pp. 205-208
    • Hiraki, S.1    Watanabe, N.2
  • 35
    • 0002326640 scopus 로고
    • ADDYMS: architecture for distributed dynamic manufacturing scheduling
    • A. Famili et al. (Ed.), Cambridge USA: AAAI Press
    • Butler, J. and Ohtsubo, H. (1992) ‘ADDYMS: architecture for distributed dynamic manufacturing scheduling’, in Artificial Intelligence Applications in Manufacturing, A. Famili et al. (Ed.), Cambridge USA: AAAI Press, pp.200-213.
    • (1992) Artificial Intelligence Applications in Manufacturing , pp. 200-213
    • Butler, J.1    Ohtsubo, H.2
  • 36
    • 0026103848 scopus 로고
    • Resource allocation in distributed factory scheduling
    • Sycara, K., Roth, S.F., Sadeh, N. and Fox, M.S. (1991) ‘Resource allocation in distributed factory scheduling’, IEEE Expert, pp.29-40.
    • (1991) IEEE Expert , pp. 29-40
    • Sycara, K.1    Roth, S.F.2    Sadeh, N.3    Fox, M.S.4
  • 37
    • 0030397154 scopus 로고    scopus 로고
    • A distributed scheduling and shop-floor control method
    • Kim, K.H. and Bae, J.W (1996) ‘A distributed scheduling and shop-floor control method’, Computers & Industrial Engineering, Vol. 31, Nos. 3/4, pp.583-586.
    • (1996) Computers & Industrial Engineering , vol.31 , Issue.3-4 , pp. 583-586
    • Kim, K.H.1    Bae, J.W.2
  • 38
  • 39
    • 0028516156 scopus 로고
    • Introducing intelligence in distributed systems management
    • Gaiti, D. (1994) ‘Introducing intelligence in distributed systems management’, Computer Communications, Vol. 17, No. 10, pp.729-738.
    • (1994) Computer Communications , vol.17 , Issue.10 , pp. 729-738
    • Gaiti, D.1
  • 41
    • 0026253933 scopus 로고
    • Intelligent dispatching for flexible manufacturing
    • Chandar, J. and Talavage, J. (1991) ‘Intelligent dispatching for flexible manufacturing’, International Journal of Production Research, Vol. 29, No. 11, pp.2259-2278.
    • (1991) International Journal of Production Research , vol.29 , Issue.11 , pp. 2259-2278
    • Chandar, J.1    Talavage, J.2
  • 42
    • 0029710092 scopus 로고    scopus 로고
    • A collaborative scheduling system for make-to- order manufacturing
    • Lee, K.I., Kang, M. and Park, J.H. (1996) ‘A collaborative scheduling system for make-to- order manufacturing’, Annals CIRP, Vol. 45, No. 1, pp.461-464.
    • (1996) Annals CIRP , vol.45 , Issue.1 , pp. 461-464
    • Lee, K.I.1    Kang, M.2    Park, J.H.3
  • 43
    • 0029487841 scopus 로고
    • Coordination of distributed production resources for responsibility- based manufacturing
    • Adamides, E.D. (1995) ‘Coordination of distributed production resources for responsibility- based manufacturing’, Journal of Intelligent Manufacturing, Vol. 6, No. 6, pp.415-427.
    • (1995) Journal of Intelligent Manufacturing , vol.6 , Issue.6 , pp. 415-427
    • Adamides, E.D.1
  • 46
    • 0031233993 scopus 로고    scopus 로고
    • Simultaneous scheduling of workpieces, fixtures and cutting tools within flexible machining cells
    • Rahimifard, S. and Newman, S.T. (1997) ‘Simultaneous scheduling of workpieces, fixtures and cutting tools within flexible machining cells’, International Journal of Production Research, Vol. 35, No. 9, pp.2379-2397.
    • (1997) International Journal of Production Research , vol.35 , Issue.9 , pp. 2379-2397
    • Rahimifard, S.1    Newman, S.T.2
  • 47
    • 0043025336 scopus 로고
    • A development system for intelligent agent manufacturing software
    • Kwok, A.D. and Norrie, D.H. (1994) ‘A development system for intelligent agent manufacturing software’, Integrated Manufacturing Systems, Vol. 5, Nos. 4/5, pp.64-76.
    • (1994) Integrated Manufacturing Systems , vol.5 , Issue.4-5 , pp. 64-76
    • Kwok, A.D.1    Norrie, D.H.2
  • 48
    • 0030216517 scopus 로고    scopus 로고
    • Multi-agent mediator architecture for distributed manufacturing
    • Maturana, F.P. and Norrie, D.H. (1996) ‘Multi-agent mediator architecture for distributed manufacturing,’ Journal of Intelligent Manufacturing, Vol. 7 No. 4, pp.257-270.
    • (1996) Journal of Intelligent Manufacturing , vol.7 , Issue.4 , pp. 257-270
    • Maturana, F.P.1    Norrie, D.H.2
  • 49
    • 0030380690 scopus 로고    scopus 로고
    • An Agent-driven approach to design factory information systems
    • Lefrancois, P., Cloutier, L. and Monteruil, B. (1996) ‘An Agent-driven approach to design factory information systems’, Computers in Industry, Vol. 32, No. 2, pp.197-217.
    • (1996) Computers in Industry , vol.32 , Issue.2 , pp. 197-217
    • Lefrancois, P.1    Cloutier, L.2    Monteruil, B.3
  • 50
    • 0031069104 scopus 로고    scopus 로고
    • Using multi-agent architecture in FMS for dynamic scheduling
    • 19970
    • Kouiss, K., Pierreval, H. and Mebarki, N. (19970 ‘Using multi-agent architecture in FMS for dynamic scheduling’, Journal of Intelligent Manufacturing, Vol. 8, No. 1, pp.41-47.
    • Journal of Intelligent Manufacturing , vol.8 , Issue.1 , pp. 41-47
    • Kouiss, K.1    Pierreval, H.2    Mebarki, N.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.