메뉴 건너뛰기




Volumn , Issue , 2007, Pages 2051-2056

Agent-based simulation for collaborative cranes

Author keywords

[No Author keywords available]

Indexed keywords

AGENTS; CONSTRUCTION INDUSTRY; FINANCIAL DATA PROCESSING;

EID: 49849106660     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2007.4419836     Document Type: Conference Paper
Times cited : (6)

References (22)
  • 1
    • 18144425787 scopus 로고    scopus 로고
    • Collision free path planning of cooperative crane manipulators using genetic algorithm
    • Ali, M.S.A.D., N.R., Babu, and K. Varghese. 2005. Collision free path planning of cooperative crane manipulators using genetic algorithm. In Journal of Computing in Civil Engineering, ASCE, 19(2): 182-193.
    • (2005) Journal of Computing in Civil Engineering, ASCE , vol.19 , Issue.2 , pp. 182-193
    • Ali M.S1    Varghese, K.2
  • 5
    • 49849087164 scopus 로고    scopus 로고
    • Available via, accessed March 31, 2007
    • Cranimation 2007. Available via [accessed March 31, 2007].
    • (2007)
    • Cranimation1
  • 6
    • 49849084737 scopus 로고    scopus 로고
    • Davis, B.R., and S.C. Sutton. 2003. A guide to crane safety. N.C. Department of Labor, Division of Occupational Safety and Health.
    • Davis, B.R., and S.C. Sutton. 2003. A guide to crane safety. N.C. Department of Labor, Division of Occupational Safety and Health.
  • 7
    • 49849102371 scopus 로고    scopus 로고
    • Available via, accessed March 31, 2007
    • Dialog Visu. 2007. Available via [accessed March 31, 2007]
    • Dialog Visu. 2007
  • 11
    • 0026913154 scopus 로고
    • Gross motion planning: A survey
    • Hwang, Y.K., and C.T. Hass. 1992. Gross motion planning: a survey. In ACM Computing Surveys, 24(3): 219-291.
    • (1992) ACM Computing Surveys , vol.24 , Issue.3 , pp. 219-291
    • Hwang, Y.K.1    Hass, C.T.2
  • 13
    • 0142155982 scopus 로고    scopus 로고
    • Kim, K., and Jr. B.C. Paulson. 2003. Agent-based compensatory negotiation methodology to facilitate distributed coordination of project schedule changes. In Journal of Computing in Civil Engineering, ASCE, 17(1): 10-18.
    • Kim, K., and Jr. B.C. Paulson. 2003. Agent-based compensatory negotiation methodology to facilitate distributed coordination of project schedule changes. In Journal of Computing in Civil Engineering, ASCE, 17(1): 10-18.
  • 14
    • 49849085597 scopus 로고    scopus 로고
    • LiftPlanner, Available via, accessed March 31, 2007
    • LiftPlanner 2007. Available via [accessed March 31, 2007].
    • (2007)
  • 17
    • 0041929221 scopus 로고    scopus 로고
    • Learning in multi-agent systems: A case study of construction claims negotiation
    • Ren, Z., and C. Anumba. 2002. Learning in multi-agent systems: a case study of construction claims negotiation. In Advanced Engineering Information, 16(4): 265-275.
    • (2002) Advanced Engineering Information , vol.16 , Issue.4 , pp. 265-275
    • Ren, Z.1    Anumba, C.2
  • 20
    • 49849103220 scopus 로고    scopus 로고
    • Available via, accessed March 31, 2007
    • Simlog. 2007. Available via [accessed March 31, 2007].
    • (2007)
  • 22
    • 0242664925 scopus 로고    scopus 로고
    • Deck reconstruction of Jacques Carrier Bridge using precast prestressed high performance concrete panels
    • Zaki, A.R., and G. Mailhot. 2003. Deck reconstruction of Jacques Carrier Bridge using precast prestressed high performance concrete panels, PCI Journal.
    • (2003) PCI Journal
    • Zaki, A.R.1    Mailhot, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.