-
1
-
-
0024719222
-
A Reliability Test System for Educational Purposes-Basic Data
-
August
-
R.Billinton and et al, "A Reliability Test System for Educational Purposes-Basic Data", IEEE Transactions on Power System, Vol.PWRS-3,No.4,August 1989,pp. 1238-1244.
-
(1989)
IEEE Transactions on Power System
, vol.PWRS-3
, Issue.4
, pp. 1238-1244
-
-
Billinton, R.1
and et, al.2
-
2
-
-
0029354288
-
Sequential Monte Carlo simulation for composite power system reliability analysis with time varying loads
-
August
-
A.Sankarakrishnan and R.Billinton, "Sequential Monte Carlo simulation for composite power system reliability analysis with time varying loads", IEEE Transactions on Power Systems, Vol. 10, No.3, August 1995, pp. 1540-1545.
-
(1995)
IEEE Transactions on Power Systems
, vol.10
, Issue.3
, pp. 1540-1545
-
-
Sankarakrishnan, A.1
Billinton, R.2
-
3
-
-
0026839776
-
Sequential Simulation Applied to Composite System. Reliability Evaluation
-
March
-
R.Ubeda and R.N.Allan, "Sequential Simulation Applied to Composite System. Reliability Evaluation", IEE Proceeding-C, Vol.139, No.2, March 1992.
-
(1992)
IEE Proceeding-C
, vol.139
, Issue.2
-
-
Ubeda, R.1
Allan, R.N.2
-
5
-
-
22744439007
-
Monte Carlo Reliability Evaluation for Large Scale Compostie Genaration and Transmission Systems
-
May
-
W.Y.Li, "Monte Carlo Reliability Evaluation for Large Scale Compostie Genaration and Transmission Systems", Journal of Chongqing University, Vol.12, No.3, May 1989, pp.92-98
-
(1989)
Journal of Chongqing University
, vol.12
, Issue.3
, pp. 92-98
-
-
Li, W.Y.1
-
6
-
-
0028198009
-
An evidential reasoning approach for multiple attribute decision making with uncertainty
-
January
-
J.B.Yang and M.G.Singh, "An evidential reasoning approach for multiple attribute decision making with uncertainty", IEEE Trans. Syst., Man, Cybern., Vol.24, No.1 January 1994, pp.1-8.
-
(1994)
IEEE Trans. Syst., Man, Cybern
, vol.24
, Issue.1
, pp. 1-8
-
-
Yang, J.B.1
Singh, M.G.2
-
7
-
-
0028517940
-
An general multi-level evaluation process for hybrid MADM with, uncertainty
-
October
-
J.B.Yang and P.Sen, "An general multi-level evaluation process for hybrid MADM with, uncertainty", IEEE Trans. Syst., Man, Cybern., Vol.24, October 1994, pp. 1458-1473.
-
(1994)
IEEE Trans. Syst., Man, Cybern
, vol.24
, pp. 1458-1473
-
-
Yang, J.B.1
Sen, P.2
-
8
-
-
0036084897
-
Risk Evaluation of Transmission Systems Operation Models: Concept, Method and Application
-
Paper No.02WM012, New York ,January 27-31
-
Li Wenyuan,Korczynski J K. "Risk Evaluation of Transmission Systems Operation Models: Concept, Method and Application", IEEE Winter Meeting ,Paper No.02WM012, New York ,January 27-31, 2002.
-
(2002)
IEEE Winter Meeting
-
-
Li Wenyuan, K.J.K.1
-
9
-
-
0027646288
-
-
R.Billinton, W.Y.Xi, A System State Transition Sampling Method for Composite System Reliability Evaluation, IEEE Transaction on Power Systems ,8,No.3,1993,pp.761.-770.
-
R.Billinton, W.Y.Xi, "A System State Transition Sampling Method for Composite System Reliability Evaluation", IEEE Transaction on Power Systems ,Vol.8,No.3,1993,pp.761.-770.
-
-
-
-
10
-
-
0000469059
-
Composite Generation/Transmission Reliability Evaluation
-
April
-
M.V.F.Pereira and N.J.Balu. "Composite Generation/Transmission Reliability Evaluation",Proceedings of the IEEE, Vol.80,No.4,April 1992,pp.470-490.
-
(1992)
Proceedings of the IEEE
, vol.80
, Issue.4
, pp. 470-490
-
-
Pereira, M.V.F.1
Balu, N.J.2
-
11
-
-
13344250409
-
Deterministic/Probabilistic Contingency Evaluation in Composite Generation and Transmission Systems
-
June
-
R.Billinton and R.Mo, "Deterministic/Probabilistic Contingency Evaluation in Composite Generation and Transmission Systems", IEEE/PES Genaral Meeting, Vol. 2, June 2004, pp. 2232-2237.
-
(2004)
IEEE/PES Genaral Meeting
, vol.2
, pp. 2232-2237
-
-
Billinton, R.1
Mo, R.2
-
12
-
-
29144480331
-
Impact of Load Shedding Philosophies on Bulk Electric System Reliability Analysis Using Sequential Monte Carlo Simulation
-
March
-
W.Wangdee and R.Billinton, "Impact of Load Shedding Philosophies on Bulk Electric System Reliability Analysis Using Sequential Monte Carlo Simulation", Electric Power Components and Systems, Vol.34, No.3, March 2006.
-
(2006)
Electric Power Components and Systems
, vol.34
, Issue.3
-
-
Wangdee, W.1
Billinton, R.2
-
13
-
-
84968856104
-
-
John Wiley & Sons, Hoboken, NJ
-
W. Y. Li, Risk Assessment of Power Systems:Models, Methods, and Applications, John Wiley & Sons, Hoboken, NJ, 2005.
-
(2005)
Risk Assessment of Power Systems:Models, Methods, and Applications
-
-
Li, W.Y.1
-
14
-
-
26244457624
-
Impact of Utilizing Sequential and Non-Sequential Simulation Techniques in Bulk Electric System Reliability Assessment
-
September
-
R.Billinton and W.Wangdee, "Impact of Utilizing Sequential and Non-Sequential Simulation Techniques in Bulk Electric System Reliability Assessment", IEE Proceedings-Generation, Transmission and Distribution, Vol.152, No.5, September 2005, pp.623-628.
-
(2005)
IEE Proceedings-Generation, Transmission and Distribution
, vol.152
, Issue.5
, pp. 623-628
-
-
Billinton, R.1
Wangdee, W.2
-
15
-
-
0027646288
-
A System State Transition Sampling Method for Composite System Reliability Evaluation
-
August
-
R.Billinton, W.Y.Li, " A System State Transition Sampling Method for Composite System Reliability Evaluation" IEEE Transaction on Power Systems, Vol.8, No.3, August 1993, pp.761-771.
-
(1993)
IEEE Transaction on Power Systems
, vol.8
, Issue.3
, pp. 761-771
-
-
Billinton, R.1
Li, W.Y.2
|