메뉴 건너뛰기




Volumn 2, Issue , 2002, Pages 1124-1129

Risk evaluation of transmission system operation modes: Concept, method and application

Author keywords

Operation modes; Operation planning; Risk evaluation; Transmission system reliability

Indexed keywords

COMPUTER SIMULATION; ELECTRIC LOADS; MONTE CARLO METHODS; NETWORKS (CIRCUITS); POWER GENERATION; PROBABILISTIC LOGICS; RISK ASSESSMENT;

EID: 0036084897     PISSN: 21608555     EISSN: 21608563     Source Type: Journal    
DOI: 10.1109/PESW.2002.985185     Document Type: Article
Times cited : (18)

References (15)
  • 4
    • 85013573204 scopus 로고
    • IEEE Gold Book, Power Systems Reliability
    • (1991) IEEE Std , vol.493 , Issue.1990
  • 5
    • 0003629824 scopus 로고    scopus 로고
    • Framework for stochastic reliability of bulk power system
    • TR-110048, March
    • (1998) EPRI Report
  • 6
    • 0005934586 scopus 로고
    • Transmission reliability evaluation for large-scale systems, vol.2
    • TR-100566-R1, April
    • (1995) EPRI Report
  • 15
    • 0005968439 scopus 로고    scopus 로고
    • Risk evaluation of operation alternatives in the metro area with 2L39 and 2L40 out-of-service
    • October 6
    • (2000) BC Hydro Technical Report , vol.CCT-R-013
    • Li, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.