메뉴 건너뛰기




Volumn 34, Issue 3, 2006, Pages 355-368

Impact of load shedding philosophies on bulk electric system reliability analysis using sequential Monte Carlo simulation

Author keywords

Bulk electric system (BES); Load shedding philosophy; Predictive and performance indices; Reliability; Sequential simulation

Indexed keywords

COMPUTER SIMULATION; COMPUTER SOFTWARE; FORECASTING; MONTE CARLO METHODS; PERFORMANCE; RELIABILITY;

EID: 29144480331     PISSN: 15325008     EISSN: 15325016     Source Type: Journal    
DOI: 10.1080/15325000500241266     Document Type: Article
Times cited : (9)

References (19)
  • 2
    • 29144476689 scopus 로고
    • Monte Carlo simulation techniques in reliability assessment of composite generation and transmission systems
    • L. Salvaderi, "Monte Carlo simulation techniques in reliability assessment of composite generation and transmission systems," IEEE Tutorial Course 90EHO311-1-PWR, pp. 36-43, 1990.
    • (1990) IEEE Tutorial Course 90EHO311-1-PWR , pp. 36-43
    • Salvaderi, L.1
  • 3
    • 0026839776 scopus 로고
    • Sequential simulation applied to composite system reliability evaluation
    • March
    • R. Ubeda and R. N. Allan, "Sequential simulation applied to composite system reliability evaluation," IEE Proceeding-C, vol. 139, no. 2, pp. 81-86, March 1992.
    • (1992) IEE Proceeding-C , vol.139 , Issue.2 , pp. 81-86
    • Ubeda, R.1    Allan, R.N.2
  • 5
    • 0029354288 scopus 로고
    • Sequential Monte Carlo simulation for composite power system reliability analysis with time varying loads
    • August
    • A. Sankarakrishnan and R. Billinton, "Sequential Monte Carlo simulation for composite power system reliability analysis with time varying loads," IEEE Transactions on Power Systems, vol. 10, no. 3, pp. 1540-1545, August 1995.
    • (1995) IEEE Transactions on Power Systems , vol.10 , Issue.3 , pp. 1540-1545
    • Sankarakrishnan, A.1    Billinton, R.2
  • 6
    • 0028481002 scopus 로고
    • Evaluation of reliability worth in composite systems based on pseudo-sequential Monte Carlo simulation
    • August
    • J. C. O. Mello, M. V. F. Pereira, and A. M. Leite da Silva, "Evaluation of reliability worth in composite systems based on pseudo-sequential Monte Carlo simulation," IEEE Transactions on Power Systems, vol. 9, no. 3, pp. 1318-1326, August 1994.
    • (1994) IEEE Transactions on Power Systems , vol.9 , Issue.3 , pp. 1318-1326
    • Mello, J.C.O.1    Pereira, M.V.F.2    Da Silva, A.M.L.3
  • 7
    • 0025522133 scopus 로고
    • Bulk System reliability - Predictive indices
    • November
    • IEEE Task Force, "Bulk System reliability - Predictive indices," IEEE Transactions on Power Systems, vol. 5, no. 4, pp. 1204-1213, November 1990.
    • (1990) IEEE Transactions on Power Systems , vol.5 , Issue.4 , pp. 1204-1213
  • 8
    • 0024718082 scopus 로고
    • Bulk system reliability - Measurement and indices
    • August
    • IEEE Task Force, "Bulk system reliability - Measurement and indices," IEEE Transactions on Power Systems, vol. 4, no. 3, pp. 829-835, August 1989.
    • (1989) IEEE Transactions on Power Systems , vol.4 , Issue.3 , pp. 829-835
  • 9
    • 0030216563 scopus 로고    scopus 로고
    • Reporting bulk power system delivery point reliability
    • August
    • IEEE Task Force, "Reporting bulk power system delivery point reliability," IEEE Transactions on Power Systems, vol. 11, no. 3, pp. 1262-1268, August 1996.
    • (1996) IEEE Transactions on Power Systems , vol.11 , Issue.3 , pp. 1262-1268
  • 14
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • November/December
    • IEEE Task Force, "IEEE reliability test system," IEEE Transactions on Power Apparatus and Systems, vol. PAS-98, pp. 2047-2054, November/December 1979.
    • (1979) IEEE Transactions on Power Apparatus and Systems , vol.PAS-98 , pp. 2047-2054
  • 17
    • 0026820887 scopus 로고
    • A security based approach to composite power system reliability evaluation
    • February
    • R. Billinton and E. Khan, "A security based approach to composite power system reliability evaluation," IEEE Transactions on Power Systems, vol. 7, no. 1, pp. 65-72, February 1992.
    • (1992) IEEE Transactions on Power Systems , vol.7 , Issue.1 , pp. 65-72
    • Billinton, R.1    Khan, E.2
  • 18
    • 0346780228 scopus 로고    scopus 로고
    • Estimating customer outage costs due to a specific failure event
    • November
    • R. Billinton and W. Wangdee, "Estimating customer outage costs due to a specific failure event," IEE Proc.-Gener. Transm. Distrib., vol. 150, no. 6, pp. 668-672, November 2003.
    • (2003) IEE Proc.-gener. Transm. Distrib. , vol.150 , Issue.6 , pp. 668-672
    • Billinton, R.1    Wangdee, W.2
  • 19
    • 0035341046 scopus 로고    scopus 로고
    • Composite reliability evaluation by sequential Monte Carlo simulation on parallel and distributed processing environments
    • May
    • C. L. T. Borges, D. M. Falcao, J. C. O. Mello, and A. C. G. Melo, "Composite reliability evaluation by sequential Monte Carlo simulation on parallel and distributed processing environments," IEEE Transactions on Power Systems, vol. 16, no. 2, pp. 203-209, May 2001.
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.2 , pp. 203-209
    • Borges, C.L.T.1    Falcao, D.M.2    Mello, J.C.O.3    Melo, A.C.G.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.