-
2
-
-
0023981354
-
Graph-based heuristics for recognition of machined features
-
Joshi S, Chang TC (1988) Graph-based heuristics for recognition of machined features. CAD 20:58-66
-
(1988)
CAD
, vol.20
, pp. 58-66
-
-
Joshi, S.1
Chang, T.C.2
-
3
-
-
0036532878
-
Machinable volume extraction for automatic process planning
-
Nagraj HS, Gurumoorthy B (2002) Machinable volume extraction for automatic process planning. IIE Trans 34:393-410
-
(2002)
IIE Trans
, vol.34
, pp. 393-410
-
-
Nagraj, H.S.1
Gurumoorthy, B.2
-
4
-
-
0042865818
-
STEP-based integration of feature recognition and design by feature for manufacturing applications in a concurrent engineering environment
-
1-4
-
Ong SK, Li WD, Nee AYC (2003) STEP-based integration of feature recognition and design by feature for manufacturing applications in a concurrent engineering environment. Int J Comput Appl Technol 18(1-4):78-92
-
(2003)
Int J Comput Appl Technol
, vol.18
, pp. 78-92
-
-
Ong, S.K.1
Li, W.D.2
Nee, A.Y.C.3
-
5
-
-
0033883189
-
STEP-based feature extraction from STEP geometry for agile manufacturing
-
Bhandarkar MP, Nagi R (2000) STEP-based feature extraction from STEP geometry for agile manufacturing. Comput Ind 41:3-24
-
(2000)
Comput Ind
, vol.41
, pp. 3-24
-
-
Bhandarkar, M.P.1
Nagi, R.2
-
6
-
-
0037775779
-
An approach to identify design and manufacturing features from a data exchanged part model
-
Fu MW, Ong SK, Lu WF, Lee IBH, Nee AYC (2003) An approach to identify design and manufacturing features from a data exchanged part model. CAD 35:979-993
-
(2003)
CAD
, vol.35
, pp. 979-993
-
-
Fu, M.W.1
Ong, S.K.2
Lu, W.F.3
Lee, I.B.H.4
Nee, A.Y.C.5
-
8
-
-
49449087321
-
STEP-based automatic system for recognizing design and manufacturing features
-
Accepted for publication in
-
Nagarajan S, Reddy NV (2007) STEP-based automatic system for recognizing design and manufacturing features. Accepted for publication in International Journal of Production Research
-
(2007)
International Journal of Production Research
-
-
Nagarajan, S.1
Reddy, N.V.2
-
9
-
-
0030787210
-
Automatic setup planning in machining operation
-
SK Ong, AYC Nee (1997) Automatic setup planning in machining operation. J Mater Process Technol 63:151-156
-
(1997)
J Mater Process Technol
, vol.63
, pp. 151-156
-
-
Ong, S.K.1
Nee, A.Y.C.2
-
11
-
-
3142732811
-
A constraint-based operation sequencing for a knowledge-based process planning
-
4
-
Gologlu C (2004) A constraint-based operation sequencing for a knowledge-based process planning. J Intell Manuf 15(4):463-470 August 2004
-
(2004)
J Intell Manuf
, vol.15
, pp. 463-470
-
-
Gologlu, C.1
-
12
-
-
4344718627
-
Computer aided setup planning for machining centers configuration
-
Contini P, Tolio T (2004) Computer aided setup planning for machining centers configuration. Int J Prod Res 42:3473-3491
-
(2004)
Int J Prod Res
, vol.42
, pp. 3473-3491
-
-
Contini, P.1
Tolio, T.2
-
13
-
-
18144427547
-
Process planning strategy based on fixturing indicator & evaluation
-
Paris D, Brissaud H (2005) Process planning strategy based on fixturing indicator & evaluation. Int J Adv Manuf Technol 25:913-922
-
(2005)
Int J Adv Manuf Technol
, vol.25
, pp. 913-922
-
-
Paris, D.1
Brissaud, H.2
-
16
-
-
0022074551
-
Kinematic analysis of work-part fixturing for flexible assembly with automatically reconfigurable fixtures
-
Asada H, BY AB (1985) Kinematic analysis of work-part fixturing for flexible assembly with automatically reconfigurable fixtures. IEEE J Robot Autom 2:86-93
-
(1985)
IEEE J Robot Autom
, vol.2
, pp. 86-93
-
-
Asada, H.1
By, A.B.2
-
17
-
-
0030083491
-
A complete algorithm for designing planer fixtures using modular components
-
Brost RC, Goldberg KY (1996) A complete algorithm for designing planer fixtures using modular components. IEEE Trans Robot Autom 12:31-46
-
(1996)
IEEE Trans Robot Autom
, vol.12
, pp. 31-46
-
-
Brost, R.C.1
Goldberg, K.Y.2
-
19
-
-
0030213072
-
Machining accuracy analysis for computer aided fixture design verification
-
Rong Y, Bai Y (1996) Machining accuracy analysis for computer aided fixture design verification. Transaction of ASME, J Manuf Sci Eng 118:289-299
-
(1996)
Transaction of ASME, J Manuf Sci Eng
, vol.118
, pp. 289-299
-
-
Rong, Y.1
Bai, Y.2
-
21
-
-
0036286150
-
Tolerance analysis for fixture layout design
-
Wang MY (2002) Tolerance analysis for fixture layout design. Assem Autom 22:153-162
-
(2002)
Assem Autom
, vol.22
, pp. 153-162
-
-
Wang, M.Y.1
-
22
-
-
0042233719
-
Analysis of the influence of fixture location errors on the compliance of work part features to geometric tolerance specifications
-
Marin RA, Ferreira PM (2003) Analysis of the influence of fixture location errors on the compliance of work part features to geometric tolerance specifications. Transaction of ASME, J Manuf Sci Eng 125:609-617
-
(2003)
Transaction of ASME, J Manuf Sci Eng
, vol.125
, pp. 609-617
-
-
Marin, R.A.1
Ferreira, P.M.2
-
23
-
-
36348973079
-
Modular fixture planning for minimum 3D tolerances using a neutral part data exchange format
-
6
-
Bansal S, Malik P, Reddy NV, Saxena A (2007) Modular fixture planning for minimum 3D tolerances using a neutral part data exchange format. Int J Prod Res 46(6):1455-1476
-
(2007)
Int J Prod Res
, vol.46
, pp. 1455-1476
-
-
Bansal, S.1
Malik, P.2
Reddy, N.V.3
Saxena, A.4
-
24
-
-
0031120266
-
Tolerance analysis for setup planning: A graph theoretical approach
-
4
-
Huang SH, Zhang HC, Oldham WJB (1997) Tolerance analysis for setup planning: A graph theoretical approach. Int J Prod Res 35(4):1107-1124
-
(1997)
Int J Prod Res
, vol.35
, pp. 1107-1124
-
-
Huang, S.H.1
Zhang, H.C.2
Oldham, W.J.B.3
-
25
-
-
0037287794
-
Rigorous application of tolerance analysis in setup planning
-
Huang SH, Liu Q (2003) Rigorous application of tolerance analysis in setup planning. Int J Adv Manuf Technol 3:196-207
-
(2003)
Int J Adv Manuf Technol
, vol.3
, pp. 196-207
-
-
Huang, S.H.1
Liu, Q.2
-
26
-
-
0002274363
-
Algorithms for the minimization of setups and tool changes in Simply fixturable components in milling
-
2
-
SE Sarma, PK Wright (1996) Algorithms for the minimization of setups and tool changes in Simply fixturable components in milling. J Manuf Syst 15(2):95-112
-
(1996)
J Manuf Syst
, vol.15
, pp. 95-112
-
-
Sarma, S.E.1
Wright, P.K.2
-
28
-
-
0032668985
-
A hybrid-graph approach for automated setup planning in CAPP
-
Zhang HC, Lin W (1999) A hybrid-graph approach for automated setup planning in CAPP. Robot Comput-integr Manuf 15:89-100
-
(1999)
Robot Comput-integr Manuf
, vol.15
, pp. 89-100
-
-
Zhang, H.C.1
Lin, W.2
-
29
-
-
44049122190
-
Automatic setup planning and fixture design for machining
-
1
-
Sakurai H (1992) Automatic setup planning and fixture design for machining. J Manuf Syst 11(1):30-37
-
(1992)
J Manuf Syst
, vol.11
, pp. 30-37
-
-
Sakurai, H.1
|