-
1
-
-
0022074551
-
Kinematic analysis of work-part fixturing for flexible assembly with automatically reconfigurable fixtures
-
Asada, H. and By, A.B., Kinematic analysis of work-part fixturing for flexible assembly with automatically reconfigurable fixtures. IEEE J. Robot. Automat., 1985, 2, 86-93.
-
(1985)
IEEE J. Robot. Automat
, vol.2
, pp. 86-93
-
-
Asada, H.1
By, A.B.2
-
2
-
-
0030083491
-
A complete algorithm for designing planer fixtures using modular components
-
Brost, R.C. and Goldberg, K.Y., A complete algorithm for designing planer fixtures using modular components. IEEE Trans. Robot. Automat., 1996, 12, 31-46.
-
(1996)
IEEE Trans. Robot. Automat
, vol.12
, pp. 31-46
-
-
Brost, R.C.1
Goldberg, K.Y.2
-
3
-
-
0000652371
-
Quadratic sensitivity analysis of fixtures and locating scheme for rigid parts
-
Carlson, J.S., Quadratic sensitivity analysis of fixtures and locating scheme for rigid parts. Trans. ASME, J, Manuf, Sci., Eng., 2001, 123, 462-472.
-
(2001)
Trans. ASME, J, Manuf, Sci., Eng
, vol.123
, pp. 462-472
-
-
Carlson, J.S.1
-
4
-
-
0032682110
-
Tolerance analysis of machining fixture locators
-
Choudhuri, S.A. and Demeter, E.C. Tolerance analysis of machining fixture locators, Trans. ASME J. Manuf. Sci. Eng., 1999, 121, 273-281.
-
(1999)
Trans. ASME J. Manuf. Sci. Eng
, vol.121
, pp. 273-281
-
-
Choudhuri, S.A.1
Demeter, E.C.2
-
5
-
-
0031337814
-
An approach to automating modular fixture design and assembly
-
Dai, J.R., Nee, A.Y.C., Fuh, J.Y.H. and Kumar, A.S., An approach to automating modular fixture design and assembly, Proc. Instit. Mech. Eng., 1997, 211, 509-521.
-
(1997)
Proc. Instit. Mech. Eng
, vol.211
, pp. 509-521
-
-
Dai, J.R.1
Nee, A.Y.C.2
Fuh, J.Y.H.3
Kumar, A.S.4
-
6
-
-
0342918690
-
An automated design and assembly of interference free modular fixture
-
Kumar, A.S., Fuh, J.Y.H, and Kow, T.S., An automated design and assembly of interference free modular fixture. Comput.-Aid Des., 2000, 32, 583-596.
-
(2000)
Comput.-Aid Des
, vol.32
, pp. 583-596
-
-
Kumar, A.S.1
Fuh, J.Y.H.2
Kow, T.S.3
-
7
-
-
44049118826
-
Expert fixture design system for an automated manufacturing environment
-
Kumar, A.S., Nee, A.Y.C. and Prombanpong, S., Expert fixture design system for an automated manufacturing environment. Comput.-Aid Des., 1992, 23, 316-326.
-
(1992)
Comput.-Aid Des
, vol.23
, pp. 316-326
-
-
Kumar, A.S.1
Nee, A.Y.C.2
Prombanpong, S.3
-
8
-
-
36349032643
-
Case based agile fixture design
-
Li, W., Li, F., and Rong, Y., Case based agile fixture design. J. Mat. Proc. Tech., 2002, 5637, 1-12.
-
(2002)
J. Mat. Proc. Tech
, vol.5637
, pp. 1-12
-
-
Li, W.1
Li, F.2
Rong, Y.3
-
9
-
-
0042233719
-
Analysis of the influence of fixture location errors on the compliance of work part features to geometric tolerance specifications
-
Marin, R.A. and Ferreira, P.M., Analysis of the influence of fixture location errors on the compliance of work part features to geometric tolerance specifications. Trans. ASME, J. Manuf. Sci. Eng., 2003, 125, 609-617.
-
(2003)
Trans. ASME, J. Manuf. Sci. Eng
, vol.125
, pp. 609-617
-
-
Marin, R.A.1
Ferreira, P.M.2
-
10
-
-
0030213072
-
Machining accuracy analysis for computer aided fixture design verification
-
Rong, Y., and Bai, Y., Machining accuracy analysis for computer aided fixture design verification. Trans. ASME, J. Manuf. Sci. Eng., 1996, 118, 289-299.
-
(1996)
Trans. ASME, J. Manuf. Sci. Eng
, vol.118
, pp. 289-299
-
-
Rong, Y.1
Bai, Y.2
-
12
-
-
0030260730
-
A fixture design system using case based reasoning
-
Sun, S.H. and Chen, J.L., A fixture design system using case based reasoning, Eng. Appl. Artif. Intell., 1996, 5, 533-540.
-
(1996)
Eng. Appl. Artif. Intell
, vol.5
, pp. 533-540
-
-
Sun, S.H.1
Chen, J.L.2
-
13
-
-
0036286150
-
Tolerance analysis for fixture layout design
-
Wang, M.Y., Tolerance analysis for fixture layout design, Ass. Automat., 2002, 22, 153-162.
-
(2002)
Ass. Automat
, vol.22
, pp. 153-162
-
-
Wang, M.Y.1
-
14
-
-
0034472491
-
An optimum design for 3-D fixture synthesis in a point set domain
-
Wang, Y.M., An optimum design for 3-D fixture synthesis in a point set domain, IEEE Trans. Robot. Automat., 2000, 16, 839-846.
-
(2000)
IEEE Trans. Robot. Automat
, vol.16
, pp. 839-846
-
-
Wang, Y.M.1
-
15
-
-
36348970987
-
The geometric principle of automatic modular fixture planning
-
Wu, Y., Gao, S. and Chen, Z., The geometric principle of automatic modular fixture planning, Proc. DETC'01 (ASME 2001), 2001, 1-9.
-
(2001)
Proc. DETC'01 (ASME 2001)
, pp. 1-9
-
-
Wu, Y.1
Gao, S.2
Chen, Z.3
-
16
-
-
0031994379
-
Automated modular fixture planning: Geometric analysis
-
Wu, Y., Rong, Y., Ma, W., and LeClair, S.R., Automated modular fixture planning: geometric analysis. Robot. CIM, 1998a, 14, 1-15.
-
(1998)
Robot. CIM
, vol.14
, pp. 1-15
-
-
Wu, Y.1
Rong, Y.2
Ma, W.3
LeClair, S.R.4
-
17
-
-
0031995184
-
Automated modular fixture planning: Accuracy, clamping and accessibility analyses
-
Wu, Y., Rong, Y., Ma, W. and LeClair, S.R., Automated modular fixture planning: accuracy, clamping and accessibility analyses. Robot. CIM, 1998b, 14, 17-26.
-
(1998)
Robot. CIM
, vol.14
, pp. 17-26
-
-
Wu, Y.1
Rong, Y.2
Ma, W.3
LeClair, S.R.4
|