-
1
-
-
0023829029
-
Principles of part setup and workholding in automated manufacturing
-
P.J. Englert and P.K. Wright, "Principles of Part Setup and Workholding in Automated Manufacturing," Journal of Manufacturing Systems (v7, n2, 1988), pp147-161.
-
(1988)
Journal of Manufacturing Systems
, vol.7
, Issue.2
, pp. 147-161
-
-
Englert, P.J.1
Wright, P.K.2
-
2
-
-
0028322821
-
Automatic design of machining fixtures: Conceptual design
-
Y-C. Chou, R.A. Srinivas, and S. Saraf, "Automatic Design of Machining Fixtures: Conceptual Design," International Journal of Advanced Manufacturing Technology (v9, n1, 1994), pp3-12.
-
(1994)
International Journal of Advanced Manufacturing Technology
, vol.9
, Issue.1
, pp. 3-12
-
-
Chou, Y.-C.1
Srinivas, R.A.2
Saraf, S.3
-
3
-
-
0026205883
-
Fixture planning with friction
-
S-H. Lee and M. Cutkosky, "Fixture Planning with Friction," Journal of Engineering for Industry (v113, n3, 1991), pp320-327.
-
(1991)
Journal of Engineering for Industry
, vol.113
, Issue.3
, pp. 320-327
-
-
Lee, S.-H.1
Cutkosky, M.2
-
4
-
-
77951527122
-
Reference free part encapsulation: A new universal fixturing technology
-
S.E. Sarma, S. Gandhi, and P.K. Wright, "Reference Free Part Encapsulation: A New Universal Fixturing Technology," to appear in Design for Manufacturability Symposium, ASME WAM, 1995.
-
(1995)
Design for Manufacturability Symposium, ASME WAM
-
-
Sarma, S.E.1
Gandhi, S.2
Wright, P.K.3
-
5
-
-
0042437214
-
Programmable conformable clamps
-
M.R. Cutkosky, E. Kurokawa, and P.K. Wright, "Programmable Conformable Clamps," Proceedings of AUTOFACT 4 (1988), pp1151-1158.
-
(1988)
Proceedings of AUTOFACT
, vol.4
, pp. 1151-1158
-
-
Cutkosky, M.R.1
Kurokawa, E.2
Wright, P.K.3
-
6
-
-
0002007079
-
Phase Change Fixturing for Flexible Manufacturing Systems
-
B.S. Thompson and M.V. Gandhi, "Phase Change Fixturing for Flexible Manufacturing Systems," Journal of Manufacturing Svstems (v4, nl, 1985), pp29-39.
-
(1985)
Journal of Manufacturing Svstems
, vol.4
, Issue.1
, pp. 29-39
-
-
Thompson, B.S.1
Gandhi, M.V.2
-
8
-
-
0019648825
-
GARI: A problem solver that plans how to machine mechanical parts
-
Y. Descotte and J. Latombe, "GARI: A Problem Solver that Plans How to Machine Mechanical Parts" Proceedings of the IJCAI (1981).
-
(1981)
Proceedings of the IJCAI
-
-
Descotte, Y.1
Latombe, J.2
-
10
-
-
0003133669
-
Automating process planning: Using feature interactions to guide search
-
Caroline C. Hayes and Paul K. Wright, "Automating Process Planning: Using Feature Interactions to Guide Search," Journal of Mannufacturing Systems (v8, nl, 1989), ppl-15.
-
(1989)
Journal of Mannufacturing Systems
, vol.8
, Issue.1
, pp. 1-15
-
-
Hayes, C.C.1
Wright, P.K.2
-
13
-
-
77951601429
-
Rapid product realization from detail design
-
S.E. Sarma, S.M. Schofield, J.A. Stori, J. MacFarlane, and P.K. Wright, "Rapid Product Realization from Detail Design," to be published in Computer-Aided Design, 1995.
-
(1995)
Computer-aided Design
-
-
Sarma, S.E.1
Schofield, S.M.2
Stori, J.A.3
MacFarlane, J.4
Wright, P.K.5
-
15
-
-
0027052179
-
An integrated cutting tool selection and operation sequencing method
-
H.M. Rho, R. Geelink, A.H. van't Erve, and H.J.J. Kals, "An Integrated Cutting Tool Selection and Operation Sequencing Method,'" Annals of CIRP (1992), pp517-521.
-
(1992)
Annals of CIRP
, pp. 517-521
-
-
Rho, H.M.1
Geelink, R.2
Van't Erve, A.H.3
Kals, H.J.J.4
-
17
-
-
77951561100
-
AI search for minimum cost set cover and multiple goal plan optimization problems: Applications to manufacturing, planning and scheduling
-
A. Mahanti, R. Karinthi, S. Ghosh, and A. Pal, "AI Search for Minimum Cost Set Cover and Multiple Goal Plan Optimization Problems: Applications to Manufacturing, Planning and Scheduling," 4th International Conference on Industrial and Engineering Applications of AI and Expert Systems (IEA-AIE-91) (1990).
-
(1990)
4th International Conference on Industrial and Engineering Applications of AI and Expert Systems (IEA-AIE-91)
-
-
Mahanti, A.1
Karinthi, R.2
Ghosh, S.3
Pal, A.4
-
18
-
-
0012553079
-
A heuristic grouping algorithm for fixture and tool setups
-
G. Yut and T.C. Chang, "A Heuristic Grouping Algorithm for Fixture and Tool Setups," Engineering Design and Automation (v1, n1, 1995), pp21-31.
-
(1995)
Engineering Design and Automation
, vol.1
, Issue.1
, pp. 21-31
-
-
Yut, G.1
Chang, T.C.2
-
20
-
-
0026930175
-
Handling feature interactions in process planning
-
R. Karinthi, D.S. Nau, and Q. Yang, "Handling Feature Interactions in Process Planning," Applied Artificial Intelligence (v6, 1992), pp389-415.
-
(1992)
Applied Artificial Intelligence
, vol.6
, pp. 389-415
-
-
Karinthi, R.1
Nau, D.S.2
Yang, Q.3
-
21
-
-
84880647869
-
Merging separately generated plans with restricted interactions
-
Q. Yang, D.S. Nau, and J. Hendler, "Merging Separately Generated Plans with Restricted Interactions," Computational Intelligence (v8, n4, 1992).
-
(1992)
Computational Intelligence
, vol.8
, Issue.4
-
-
Yang, Q.1
Nau, D.S.2
Hendler, J.3
-
22
-
-
0025628737
-
An approach toward incremental and interactive planning for concurrent product and process planning
-
Subbarao Kambhampati and Mark R. Cutkosky, "An Approach Toward Incremental and Interactive Planning for Concurrent Product and Process Planning," Proceedings of the ASME Winter Annual Meeting, Issues in Design/Manufacture Integration (DE-v29, 1990), pp 1-8.
-
(1990)
Proceedings of the ASME Winter Annual Meeting, Issues in Design/Manufacture Integration
, vol.29 DE
, pp. 1-8
-
-
Kambhampati, S.1
Cutkosky, M.R.2
-
23
-
-
0042938050
-
Observing machinist's planning methods: Using goal interactions to guide search
-
C.C. Hayes, "Observing Machinist's Planning Methods: Using Goal Interactions to Guide Search," Proceedings of the 9th Annual Cognitive Science Meeting (1987), pp952-958.
-
(1987)
Proceedings of the 9th Annual Cognitive Science Meeting
, pp. 952-958
-
-
Hayes, C.C.1
|