Delays in construction projects: The case of Jordan

Author keywords

Construction delays; Jordanian construction industry; Residential construction projects

Indexed keywords

CONSTRUCTION INDUSTRY; CONTRACTORS; CONTRACTS; COST ACCOUNTING;

EID: 49349093439     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2007.09.009     Document Type: Article
Times cited : (329)

References (34)
  • 1
    • 0034225662 scopus 로고    scopus 로고
    • Schedule delay analysis
    • Stumpf G. Schedule delay analysis. Cost Eng J 42 7 (2000) 32-43
    • (2000) Cost Eng J , vol.42 , Issue.7 , pp. 32-43
    • Stumpf, G.1
  • 2
    • 0000893055 scopus 로고    scopus 로고
    • Construction delay analysis techniques
    • Alkass S., Mazerolle M., and Harris F. Construction delay analysis techniques. Constr Manage Econ 14 5 (1996) 375-394
    • (1996) Constr Manage Econ , vol.14 , Issue.5 , pp. 375-394
    • Alkass, S.1    Mazerolle, M.2    Harris, F.3
  • 3
    • 84927635730 scopus 로고
    • Causes of delay in large building construction projects
    • Assaf S.A., Al-Khalil M., and Al-Hazmi M. Causes of delay in large building construction projects. J Manage Eng 11 2 (1995) 45-50
    • (1995) J Manage Eng , vol.11 , Issue.2 , pp. 45-50
    • Assaf, S.A.1    Al-Khalil, M.2    Al-Hazmi, M.3
  • 4
    • 84992957706 scopus 로고    scopus 로고
    • Causes of delays in the construction industry in Lebanon
    • Mezher T., and Tawil W. Causes of delays in the construction industry in Lebanon. Eng Constr Arch Manage J 5 3 (1998) 252-260
    • (1998) Eng Constr Arch Manage J , vol.5 , Issue.3 , pp. 252-260
    • Mezher, T.1    Tawil, W.2
  • 5
    • 4143113321 scopus 로고    scopus 로고
    • Important causes of delay in public utility projects in Saudi Arabia
    • Al-Khalil M., and Al-Ghafly M. Important causes of delay in public utility projects in Saudi Arabia. Constr Manage Econ 17 5 (1999) 647-655
    • (1999) Constr Manage Econ , vol.17 , Issue.5 , pp. 647-655
    • Al-Khalil, M.1    Al-Ghafly, M.2
  • 6
    • 16444365584 scopus 로고    scopus 로고
    • Delays and cost increases in construction of private residential projects in Kuwait
    • Koushki P.A., Al-Rashid K., and Kartam N. Delays and cost increases in construction of private residential projects in Kuwait. Constr Manage Econ 23 3 (2005) 285-294
    • (2005) Constr Manage Econ , vol.23 , Issue.3 , pp. 285-294
    • Koushki, P.A.1    Al-Rashid, K.2    Kartam, N.3
  • 7
    • 0033883312 scopus 로고    scopus 로고
    • Construction delays: a quantitative analysis
    • Al-Moumani A. Construction delays: a quantitative analysis. Int J Project Manage 18 4 (2000) 51-59
    • (2000) Int J Project Manage , vol.18 , Issue.4 , pp. 51-59
    • Al-Moumani, A.1
  • 8
    • 0036132474 scopus 로고    scopus 로고
    • Causes of construction delay: traditional contracts
    • Odeh A.M., and Battaineh H.T. Causes of construction delay: traditional contracts. Int J Project Manage 20 1 (2002) 67-73
    • (2002) Int J Project Manage , vol.20 , Issue.1 , pp. 67-73
    • Odeh, A.M.1    Battaineh, H.T.2
  • 9
    • 33745311973 scopus 로고    scopus 로고
    • Construction delays and their causative factors in Nigeria
    • Aibinu A., and Odeyinka H. Construction delays and their causative factors in Nigeria. J Constr Eng Manage 132 7 (2006) 667-677
    • (2006) J Constr Eng Manage , vol.132 , Issue.7 , pp. 667-677
    • Aibinu, A.1    Odeyinka, H.2
  • 11
    • 33645965860 scopus 로고    scopus 로고
    • Causes of delay in large construction projects
    • Assaf S.A., and Al-Hejji S. Causes of delay in large construction projects. Int J Project Manage 24 4 (2006) 349-357
    • (2006) Int J Project Manage , vol.24 , Issue.4 , pp. 349-357
    • Assaf, S.A.1    Al-Hejji, S.2
  • 12
    • 49349116452 scopus 로고    scopus 로고
    • Zikmund W. Business research methods (Thomson-South-Western); 2003. p. 388-89.
    • Zikmund W. Business research methods (Thomson-South-Western); 2003. p. 388-89.
  • 13
    • 0039997969 scopus 로고    scopus 로고
    • Factors influencing construction time and cost overruns on high-rise projects in Indonesia
    • Kaming P., Olomolaiye P., Holt G., and Harris F. Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Constr Manage Econ 15 1 (1997) 83-94
    • (1997) Constr Manage Econ , vol.15 , Issue.1 , pp. 83-94
    • Kaming, P.1    Olomolaiye, P.2    Holt, G.3    Harris, F.4
  • 14
    • 33847327339 scopus 로고    scopus 로고
    • The significant factors causing delay of building construction projects in Malaysia
    • Alaghbari W., Razali M., Kadir S., and Ernawat G. The significant factors causing delay of building construction projects in Malaysia. Eng Constr Arch Manage 14 2 (2007) 192-206
    • (2007) Eng Constr Arch Manage , vol.14 , Issue.2 , pp. 192-206
    • Alaghbari, W.1    Razali, M.2    Kadir, S.3    Ernawat, G.4
  • 15
    • 33751295266 scopus 로고    scopus 로고
    • Significant factors causing delay in the UAE construction industry
    • Faridi A.S., and El-Sayegh S.M. Significant factors causing delay in the UAE construction industry. Constr Manage Econ 24 11 (2006) 1167-1176
    • (2006) Constr Manage Econ , vol.24 , Issue.11 , pp. 1167-1176
    • Faridi, A.S.1    El-Sayegh, S.M.2
  • 17
    • 0006865274 scopus 로고
    • Reasons for delays in public projects in Turkey
    • Arditi D., Akan G.T., and Gurdamar S. Reasons for delays in public projects in Turkey. Constr Manage Econ 3 (1985) 171-181
    • (1985) Constr Manage Econ , vol.3 , pp. 171-181
    • Arditi, D.1    Akan, G.T.2    Gurdamar, S.3
  • 18
    • 84930124504 scopus 로고
    • Causes of high costs of construction in Nigeria
    • Okpala D.C., and Aniekwu A.N. Causes of high costs of construction in Nigeria. J Constr Eng Manage, ASCE 114 2 (1988) 233-244
    • (1988) J Constr Eng Manage, ASCE , vol.114 , Issue.2 , pp. 233-244
    • Okpala, D.C.1    Aniekwu, A.N.2
  • 19
    • 38249017819 scopus 로고
    • Reasons for overrun in public sector construction projects in Nigeria
    • Dlakwa M.M., and Culpin M.F. Reasons for overrun in public sector construction projects in Nigeria. Int J Project Manage 8 4 (1990) 237-241
    • (1990) Int J Project Manage , vol.8 , Issue.4 , pp. 237-241
    • Dlakwa, M.M.1    Culpin, M.F.2
  • 20
    • 0000725583 scopus 로고
    • Causes of delay and cost overruns in Nigerian construction projects
    • Mansfield N.R., Ugwu O.O., and Doran T. Causes of delay and cost overruns in Nigerian construction projects. Int J Project Manage 12 4 (1994) 254-260
    • (1994) Int J Project Manage , vol.12 , Issue.4 , pp. 254-260
    • Mansfield, N.R.1    Ugwu, O.O.2    Doran, T.3
  • 21
    • 0028754078 scopus 로고
    • Construction claims and disputes: causes and cost/time overruns
    • Semple C., Hartman F.T., and Jergeas G. Construction claims and disputes: causes and cost/time overruns. J Constr Eng Manage, ASCE 120 4 (1994) 785-795
    • (1994) J Constr Eng Manage, ASCE , vol.120 , Issue.4 , pp. 785-795
    • Semple, C.1    Hartman, F.T.2    Jergeas, G.3
  • 22
    • 0030074893 scopus 로고    scopus 로고
    • Construction delays in a fast-growing economy: comparing Thailand with other economies
    • Ogunlana S.O., Promkuntong K., and Jearkjirm V. Construction delays in a fast-growing economy: comparing Thailand with other economies. Int J Project Manage 14 1 (1996) 37-45
    • (1996) Int J Project Manage , vol.14 , Issue.1 , pp. 37-45
    • Ogunlana, S.O.1    Promkuntong, K.2    Jearkjirm, V.3
  • 23
    • 33646751898 scopus 로고    scopus 로고
    • Construction delays in Hong Kong civil engineering projects
    • Lo T.Y., Fung I.W.H., and Tung K.C.F. Construction delays in Hong Kong civil engineering projects. J Constr Eng Manage, ASCE 132 6 (2006) 636-649
    • (2006) J Constr Eng Manage, ASCE , vol.132 , Issue.6 , pp. 636-649
    • Lo, T.Y.1    Fung, I.W.H.2    Tung, K.C.F.3
  • 24
    • 84920260707 scopus 로고    scopus 로고
    • Reasons for delay in civil engineering projects-the case of Hong Kong
    • Chan D.W.M., and Kumaraswamy M.M. Reasons for delay in civil engineering projects-the case of Hong Kong. Hong Kong Instit Eng Trans 2 3 (1996) 1-8
    • (1996) Hong Kong Instit Eng Trans , vol.2 , Issue.3 , pp. 1-8
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 26
    • 0003712977 scopus 로고
    • Academic Press, New York p. 86-7
    • Seymour S. Applied sampling (1976), Academic Press, New York p. 86-7
    • (1976) Applied sampling
    • Seymour, S.1
  • 27
    • 33846291054 scopus 로고    scopus 로고
    • Delay time analysis in microtunneling projects
    • Hegab M.Y., and Smith J.R. Delay time analysis in microtunneling projects. J Constr Eng Manage, ASCE 133 2 (2007) 191-195
    • (2007) J Constr Eng Manage, ASCE , vol.133 , Issue.2 , pp. 191-195
    • Hegab, M.Y.1    Smith, J.R.2
  • 29
    • 27744587547 scopus 로고    scopus 로고
    • Delay analysis method using delay section
    • Youngjae K., Kyungrai K., and Dongwoo S. Delay analysis method using delay section. J Constr Eng Manage 131 11 (2005) 1155-1164
    • (2005) J Constr Eng Manage , vol.131 , Issue.11 , pp. 1155-1164
    • Youngjae, K.1    Kyungrai, K.2    Dongwoo, S.3
  • 30
    • 33645157686 scopus 로고    scopus 로고
    • Avoiding and minimizing construction delay claim disputes in relational contracting
    • Yates J.K., and Epstein A. Avoiding and minimizing construction delay claim disputes in relational contracting. J Profl Issues Eng Educ Pract 132 2 (2006) 168-179
    • (2006) J Profl Issues Eng Educ Pract , vol.132 , Issue.2 , pp. 168-179
    • Yates, J.K.1    Epstein, A.2
  • 31
    • 34248402903 scopus 로고    scopus 로고
    • Causes and effects of delays in Malaysian construction industry
    • Sambasivan M., and Wen Soon Y. Causes and effects of delays in Malaysian construction industry. Int J Project Manage 25 5 (2007) 517-526
    • (2007) Int J Project Manage , vol.25 , Issue.5 , pp. 517-526
    • Sambasivan, M.1    Wen Soon, Y.2
  • 32
    • 33745212283 scopus 로고    scopus 로고
    • Construction claims in United Arab Emirates: types, causes, and frequency
    • Zaneldin E.K. Construction claims in United Arab Emirates: types, causes, and frequency. Int J Project Manage 24 5 (2006) 453-459
    • (2006) Int J Project Manage , vol.24 , Issue.5 , pp. 453-459
    • Zaneldin, E.K.1
  • 33
    • 33645966496 scopus 로고    scopus 로고
    • Non-delay scheduling as a managerial approach for managing projects
    • Zwikael O., Cohen Y., and Sadeh A. Non-delay scheduling as a managerial approach for managing projects. Int J Project Manage 24 4 (2006) 330-336
    • (2006) Int J Project Manage , vol.24 , Issue.4 , pp. 330-336
    • Zwikael, O.1    Cohen, Y.2    Sadeh, A.3
  • 34
    • 32644462382 scopus 로고    scopus 로고
    • Selecting a delay analysis method in resolving construction claims
    • Arditi D., and Pattanakitchamroon T. Selecting a delay analysis method in resolving construction claims. Int J Constr Manage 24 2 (2006) 145-155
    • (2006) Int J Constr Manage , vol.24 , Issue.2 , pp. 145-155
    • Arditi, D.1    Pattanakitchamroon, T.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.