-
2
-
-
0003882275
-
-
Project Report ATC-291. Lincoln Laboratory, Massachusetts Institute of Technology: Lexington, MA
-
Allan S, Gaddy S, Evans J. 2001b. Delay Causality and Reduction at the New York City Airports Using Terminal Weather Information Systems, Project Report ATC-291. Lincoln Laboratory, Massachusetts Institute of Technology: Lexington, MA.
-
(2001)
Delay Causality and Reduction at the New York City Airports Using Terminal Weather Information Systems
-
-
Allan, S.1
Gaddy, S.2
Evans, J.3
-
3
-
-
0344861354
-
Preliminary Evaluation of Flight Delay Propagation Through an Airline Schedule
-
Beatty R, Hsu R, Berry L. 1998. Preliminary Evaluation of Flight Delay Propagation Through an Airline Schedule, 2nd, USA/EUROPE ATM R&D Seminar.
-
(1998)
2nd, USA/EUROPE ATM R&D Seminar
-
-
Beatty, R.1
Hsu, R.2
Berry, L.3
-
4
-
-
0011997251
-
Assessing NAS performance: Normalizing for the effects of weather
-
Santa Fe
-
Callaham MB, DeArmon JS, Cooper A, Goodfriend JH, Moch-Mooney D, Solomos GH. 2001. Assessing NAS performance: normalizing for the effects of weather. In 4th USA/Europe Air Traffic Management R&D Symposium, Santa Fe.
-
(2001)
4th USA/Europe Air Traffic Management R&D Symposium
-
-
Callaham, M.B.1
DeArmon, J.S.2
Cooper, A.3
Goodfriend, J.H.4
Moch-Mooney, D.5
Solomos, G.H.6
-
10
-
-
47049118850
-
Weather sensing and data fusion to improve safety and reduce delays at major west coast airports
-
Orlando, FL
-
Evans J, Dasey T, Cole R, Rhoda D. 2000. Weather sensing and data fusion to improve safety and reduce delays at major west coast airports. In 9th Conference on Aviation, Range & Aerospace Meteorology, Orlando, FL.
-
(2000)
9th Conference on Aviation, Range & Aerospace Meteorology
-
-
Evans, J.1
Dasey, T.2
Cole, R.3
Rhoda, D.4
-
11
-
-
37249058687
-
Corridor integrated weather system
-
Evans J, Ducot E. 2006. Corridor integrated weather system. Lincoln Laboratory Journal 16(1): 59-80.
-
(2006)
Lincoln Laboratory Journal
, vol.16
, Issue.1
, pp. 59-80
-
-
Evans, J.1
Ducot, E.2
-
13
-
-
33646009938
-
Delay and Flight Time Normalization Procedures for Major Airports: LAX Case Study
-
Nextor, NR-2001-003
-
Hansen M, Bolic T. 2001. Delay and Flight Time Normalization Procedures for Major Airports: LAX Case Study, Research Report Nextor, NR-2001-003.
-
(2001)
Research Report
-
-
Hansen, M.1
Bolic, T.2
-
15
-
-
19944400474
-
Potential benefits of fix-based ground delay programs to address weather constraints
-
Providence, RI
-
Hoffman R, Krozel J, Jakobavits R. 2004. Potential benefits of fix-based ground delay programs to address weather constraints. In AIAA Guidance, Navigation, and Control Conference, Providence, RI.
-
(2004)
AIAA Guidance, Navigation, and Control Conference
-
-
Hoffman, R.1
Krozel, J.2
Jakobavits, R.3
-
16
-
-
0004113690
-
-
2nd edn. Wiley: New York
-
Judge GG, Hill RC, Griffiths WE, Lütkepohl H, Lee TC. 1988. Introduction to the Theory and Practice of Econometrics, 2nd edn. Wiley: New York.
-
(1988)
Introduction to the Theory and Practice of Econometrics
-
-
Judge, G.G.1
Hill, R.C.2
Griffiths, W.E.3
Lütkepohl, H.4
Lee, T.C.5
-
18
-
-
33751431498
-
Characteristic scales, temporal variability modes and simulation of monthly Elbe River flow time series at ungauged locations
-
Markovic D, Koch M. 2006. Characteristic scales, temporal variability modes and simulation of monthly Elbe River flow time series at ungauged locations. Physics and Chemistry of the Earth 31: 1262-1273.
-
(2006)
Physics and Chemistry of the Earth
, vol.31
, pp. 1262-1273
-
-
Markovic, D.1
Koch, M.2
-
19
-
-
26944450880
-
Learning methods for air traffic management
-
Springer: Berlin/Heidelberg;
-
Rehm F, Klawonn F. 2005. Learning methods for air traffic management. Lecture Notes in Computer Science. Springer: Berlin/Heidelberg; 992-1001.
-
(2005)
Lecture Notes in Computer Science
, pp. 992-1001
-
-
Rehm, F.1
Klawonn, F.2
-
20
-
-
47049125009
-
-
Project Report ATC-313. Lincoln Laboratory, Massachusetts Institute of Technology: Lexington, MA
-
Robinson M, Evans J, Crowe B, Klingle-Wilson D, Allan S. 2004. Corridor Integrated Weather System Operational Benefits 2002-03: Initial Estimates of Convective Weather Delay Reduction, Project Report ATC-313. Lincoln Laboratory, Massachusetts Institute of Technology: Lexington, MA.
-
(2004)
Corridor Integrated Weather System Operational Benefits 2002-03: Initial Estimates of Convective Weather Delay Reduction
-
-
Robinson, M.1
Evans, J.2
Crowe, B.3
Klingle-Wilson, D.4
Allan, S.5
-
21
-
-
12844255391
-
A study of thunderstorm-induced delays at Frankfurt Airport, Germany
-
Sasse M, Hauf T. 2003. A study of thunderstorm-induced delays at Frankfurt Airport, Germany. Meteorological Applications 10: 21-30.
-
(2003)
Meteorological Applications
, vol.10
, pp. 21-30
-
-
Sasse, M.1
Hauf, T.2
-
23
-
-
47049101142
-
Einflüsse auf die Variabilität von Anflugzeiten bei Verkehrsflugzeugen
-
2006
-
Solf M. 2006. Einflüsse auf die Variabilität von Anflugzeiten bei Verkehrsflugzeugen. Diplomarbeit, Braunschweig, DLR ID 112-2006/01.
-
(2001)
Diplomarbeit, Braunschweig, DLR ID
, vol.112
-
-
Solf, M.1
|