메뉴 건너뛰기




Volumn 3571 LNAI, Issue , 2005, Pages 992-1001

Learning methods for air traffic management

Author keywords

[No Author keywords available]

Indexed keywords

AIR TRAFFIC CONTROL; AIRCRAFT; COSTS; DATA MINING; MATHEMATICAL MODELS; REGRESSION ANALYSIS;

EID: 26944450880     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: 10.1007/11518655_83     Document Type: Conference Paper
Times cited : (12)

References (9)
  • 4
    • 33646009938 scopus 로고    scopus 로고
    • Delay and flight time normalization procedures for major airports: LAX case study
    • University of California at Berkeley
    • Hanson, M., Bolic, T.: Delay and Flight Time Normalization Procedures for Major Airports: LAX Case Study. Research Report UCB-ITS-RR-2001-5, University of California at Berkeley, 2001.
    • (2001) Research Report UCB-ITS-RR-2001-5
    • Hanson, M.1    Bolic, T.2
  • 6
    • 0020157362 scopus 로고
    • Fuzzy clustering algorithms and their cluster validity
    • Rubens, M.: Fuzzy clustering algorithms and their cluster validity. European Journal of Operational Research, 10, pp. 294-301, 1992.
    • (1992) European Journal of Operational Research , vol.10 , pp. 294-301
    • Rubens, M.1
  • 7
    • 12844255391 scopus 로고    scopus 로고
    • A study of thunderstorm-induced delays at Frankfurt Airport, Germany
    • Sasse, M., Hauf, T.: A study of thunderstorm-induced delays at Frankfurt Airport, Germany. Meteorological Applications, 10, pp. 21-30, 2003.
    • (2003) Meteorological Applications , vol.10 , pp. 21-30
    • Sasse, M.1    Hauf, T.2
  • 9
    • 0001702254 scopus 로고
    • Cluster validity for fuzzy clustering algorithms
    • Windham, M.P.: Cluster validity for fuzzy clustering algorithms. Fuzzy Sets and Systems, 5, pp. 177-185, 1981.
    • (1981) Fuzzy Sets and Systems , vol.5 , pp. 177-185
    • Windham, M.P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.