메뉴 건너뛰기




Volumn , Issue , 2006, Pages 97-104

System-wide dynamic power management for portable multimedia devices

Author keywords

[No Author keywords available]

Indexed keywords

(M ,K) FIRM; BATTERY LIFE; COMPUTING SYSTEMS; DYNAMIC POWER MANAGEMENT (DPM); ENERGY CONSUMPTION; ENERGY REDUCTIONS; ENERGY SAVINGS; EXPERIMENTAL RESULTS; HARD REAL-TIME; INTERNATIONAL SYMPOSIUM; MULTIMEDIA APPLICATIONS; MULTIMEDIA DEVICES; PERIPHERAL DEVICES; QUALITY OF SERVICE (QOS); REAL-TIME CONSTRAINTS; REAL-TIME TASKS; RUN TIME SCHEDULING;

EID: 46249100994     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ISM.2006.146     Document Type: Conference Paper
Times cited : (5)

References (26)
  • 1
    • 84879362082 scopus 로고    scopus 로고
    • Energy-constrained scheduling for weakly-hard real-time systems
    • T. A. AlEnawy and H. Aydin. Energy-constrained scheduling for weakly-hard real-time systems. RTSS, 2005.
    • (2005) RTSS
    • AlEnawy, T.A.1    Aydin, H.2
  • 2
    • 84884685380 scopus 로고    scopus 로고
    • Determining optimal processor speeds for periodic real-time tasks with different power characteristics
    • June
    • H. Aydin, R. Melhem, D. Mosse, and P. Alvarez. Determining optimal processor speeds for periodic real-time tasks with different power characteristics. In ECRTS01, June 2001.
    • (2001) ECRTS01
    • Aydin, H.1    Melhem, R.2    Mosse, D.3    Alvarez, P.4
  • 3
    • 0033706197 scopus 로고    scopus 로고
    • A survey of design techniques for system-level dynamic power management
    • June
    • L. Benini, A. Bogliolo, and G. Micheli. A survey of design techniques for system-level dynamic power management. IEEE Trans. on VLSI, 8(3):299-316, June 2000.
    • (2000) IEEE Trans. on VLSI , vol.8 , Issue.3 , pp. 299-316
    • Benini, L.1    Bogliolo, A.2    Micheli, G.3
  • 4
    • 0035680590 scopus 로고    scopus 로고
    • Guarantted on-line weakly-hard real-time systems
    • G. Bernat and R. Cayssials. Guarantted on-line weakly-hard real-time systems. In RTSS, 2001.
    • (2001) RTSS
    • Bernat, G.1    Cayssials, R.2
  • 5
    • 34047190386 scopus 로고    scopus 로고
    • Online energy-aware i/o device scheduling for hard real-time systems
    • H. Cheng and S. Goddard. Online energy-aware i/o device scheduling for hard real-time systems. DATE, 2006.
    • (2006) DATE
    • Cheng, H.1    Goddard, S.2
  • 7
    • 84932164623 scopus 로고    scopus 로고
    • Dynamic voltage scaling for system-wide energy minimization in real-time embedded systems
    • R. Jejurikar and R. Gupta. Dynamic voltage scaling for system-wide energy minimization in real-time embedded systems. ISLPED, 2004.
    • (2004) ISLPED
    • Jejurikar, R.1    Gupta, R.2
  • 8
    • 4444368993 scopus 로고    scopus 로고
    • Leakage aware dynamic voltage scaling for real-time embedded systems
    • R. Jejurikar, C. Pereira, and R. Gupta. Leakage aware dynamic voltage scaling for real-time embedded systems. DAC, pages 275 - 280, 2004.
    • (2004) DAC , pp. 275-280
    • Jejurikar, R.1    Pereira, C.2    Gupta, R.3
  • 9
    • 17244367323 scopus 로고    scopus 로고
    • Hybrid run-time power management technique for real-time embedded system with voltage scalable processor
    • M. Kim and S. Ha. Hybrid run-time power management technique for real-time embedded system with voltage scalable processor. OM'01, pages 11-19, 2001.
    • (2001) OM'01 , pp. 11-19
    • Kim, M.1    Ha, S.2
  • 10
    • 78650698310 scopus 로고    scopus 로고
    • Preemption aware dynamic voltage scaling in hard real time systems
    • W. Kim, J. Kim, and S. Min. Preemption aware dynamic voltage scaling in hard real time systems. ISLPED, 2004.
    • (2004) ISLPED
    • Kim, W.1    Kim, J.2    Min, S.3
  • 11
    • 84893720356 scopus 로고    scopus 로고
    • A dynamic voltage scaling algorithm for dynamic-priority hard real-time systems using slack analysis
    • W. Kim, J. Kim, and S.L.Min. A dynamic voltage scaling algorithm for dynamic-priority hard real-time systems using slack analysis. DATE, 2002.
    • (2002) DATE
    • Kim, W.1    Kim, J.2    Min, S.L.3
  • 12
    • 0029487571 scopus 로고
    • Skip-over: Algorithms and complexity for overloaded systems that allow skips
    • G. Koren and D. Shasha. Skip-over: Algorithms and complexity for overloaded systems that allow skips. In RTSS, 1995.
    • (1995) RTSS
    • Koren, G.1    Shasha, D.2
  • 13
    • 84974687699 scopus 로고
    • Scheduling algorithms for multiprogramming in a hard real-time environment
    • C. L. Liu and J. W. Layland. Scheduling algorithms for multiprogramming in a hard real-time environment. Journal of the ACM, 17(2):46-61, 1973.
    • (1973) Journal of the ACM , vol.17 , Issue.2 , pp. 46-61
    • Liu, C.L.1    Layland, J.W.2
  • 14
    • 0036911949 scopus 로고    scopus 로고
    • A realistic variable voltage scheduling model for real-time applications
    • B. Mochocki, X. Hu, and G. Quan. A realistic variable voltage scheduling model for real-time applications. ICCAD, 2002.
    • (2002) ICCAD
    • Mochocki, B.1    Hu, X.2    Quan, G.3
  • 15
    • 29144443691 scopus 로고    scopus 로고
    • Reducing both dynamic and leakage energy consumption for hard real-time systems
    • Sep
    • L. Niu and G. Quan. Reducing both dynamic and leakage energy consumption for hard real-time systems. CASES'04, Sep 2004.
    • (2004) CASES'04
    • Niu, L.1    Quan, G.2
  • 16
    • 33746920915 scopus 로고    scopus 로고
    • Energy-aware scheduling for realtime systems with (m,k)-guarantee
    • Technical Report TR-2005-05, Department of Computer Science and Engineering, University of South Carolina
    • L. Niu and G. Quan. Energy-aware scheduling for realtime systems with (m,k)-guarantee. Technical Report TR-2005-05, Department of Computer Science and Engineering, University of South Carolina, 2005.
    • (2005)
    • Niu, L.1    Quan, G.2
  • 17
    • 84879328995 scopus 로고    scopus 로고
    • A hybrid static/dynamic dvs scheduling for real-time systems with (m, k)-guarantee
    • L. Niu and G. Quan. A hybrid static/dynamic dvs scheduling for real-time systems with (m, k)-guarantee. RTSS, 2005.
    • (2005) RTSS
    • Niu, L.1    Quan, G.2
  • 19
    • 0034473645 scopus 로고    scopus 로고
    • Enhanced fixed-priority scheduling with (m,k)-firm guarantee
    • G. Quan and X. Hu. Enhanced fixed-priority scheduling with (m,k)-firm guarantee. In RTSS, pages 79-88, 2000.
    • (2000) RTSS , pp. 79-88
    • Quan, G.1    Hu, X.2
  • 20
    • 0028320392 scopus 로고
    • Scheduling algorithms and operating system support for real-time systems
    • January
    • K. Ramamritham and J. A. Stankovic. Scheduling algorithms and operating system support for real-time systems. Proceedings of the IEEE, 82(1):55-67, January 1994.
    • (1994) Proceedings of the IEEE , vol.82 , Issue.1 , pp. 55-67
    • Ramamritham, K.1    Stankovic, J.A.2
  • 21
    • 0032663989 scopus 로고    scopus 로고
    • Overload management in real-time control applications using (m,k)-firm guarantee
    • Jun
    • P. Ramanathan. Overload management in real-time control applications using (m,k)-firm guarantee. IEEE Trans. on Paral. and Dist. Sys., 10(6):549-559, Jun 1999.
    • (1999) IEEE Trans. on Paral. and Dist. Sys , vol.10 , Issue.6 , pp. 549-559
    • Ramanathan, P.1
  • 22
    • 28444461880 scopus 로고    scopus 로고
    • Hierarchical power management with application to scheduling
    • P. Rong and M. Pedram. Hierarchical power management with application to scheduling. ISLPED, 2005.
    • (2005) ISLPED
    • Rong, P.1    Pedram, M.2
  • 23
    • 29344452797 scopus 로고    scopus 로고
    • Pruning-based, energy-optimal, deterministic i/o device scheduling for hard real-time systems
    • 141-167
    • V. Swaminathan and K. Chakrabarty. Pruning-based, energy-optimal, deterministic i/o device scheduling for hard real-time systems. Trans. on Embedded Computing Sys., 4(1):141-167, 2005.
    • (2005) Trans. on Embedded Computing Sys , vol.4 , Issue.1
    • Swaminathan, V.1    Chakrabarty, K.2
  • 24
    • 0037225561 scopus 로고    scopus 로고
    • Power evaluation of a handheld computer
    • M. A. Viredaz and D. A. Wallach. Power evaluation of a handheld computer. IEEE Micro, 23(1):66-74, 2003.
    • (2003) IEEE Micro , vol.23 , Issue.1 , pp. 66-74
    • Viredaz, M.A.1    Wallach, D.A.2
  • 26
    • 27944458086 scopus 로고    scopus 로고
    • J. Zhuo and C. Chakrabarti. Systemlevel energyefficient dynamic task scheduling. DAC, 2005.
    • J. Zhuo and C. Chakrabarti. Systemlevel energyefficient dynamic task scheduling. DAC, 2005.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.