메뉴 건너뛰기




Volumn 16, Issue 3, 2005, Pages 157-167

A fuzzy reasoning knowledge-based system for assessing rain impact in highway construction scheduling: Part 1. Analytical model

Author keywords

Activity duration; Expert knowledge; Fuzzy logic; Fuzzy set; Highway construction; Implication rule; Productivity loss; Rain impact

Indexed keywords


EID: 25144487170     PISSN: 10641246     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (7)

References (18)
  • 1
    • 0016544914 scopus 로고
    • Analysis of activity networks under uncertainty
    • A. Ang and Abdelnour, Analysis of activity networks under uncertainty, J. Engrg. Mech., ASCE 101(4) (1975), 373-387.
    • (1975) J. Engrg. Mech., ASCE , vol.101 , Issue.4 , pp. 373-387
    • Ang, A.1    Abdelnour2
  • 9
    • 0021409897 scopus 로고
    • Fuzzy importance in fault tree analysis
    • H. Furuta and N. Shiraishi, Fuzzy importance in fault tree analysis, Fuzzy Sets and Systems 12 (1984), 205-213.
    • (1984) Fuzzy Sets and Systems , vol.12 , pp. 205-213
    • Furuta, H.1    Shiraishi, N.2
  • 10
    • 0029273384 scopus 로고
    • Neuro-fuzzy modeling and control
    • J. Jang and C. Sun, Neuro-fuzzy modeling and control, Proceedings of the IEEE 83(3) (1995), 378-406.
    • (1995) Proceedings of the IEEE , vol.83 , Issue.3 , pp. 378-406
    • Jang, J.1    Sun, C.2
  • 18
    • 25144503280 scopus 로고    scopus 로고
    • The Taiwan Weather Bureau, Taiwan
    • The Taiwan Weather Bureau, Weather in Taiwan, The Taiwan Weather Bureau, Taiwan, 2001.
    • (2001) Weather in Taiwan


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.