메뉴 건너뛰기




Volumn 29, Issue 2, 1997, Pages 109-113

Complexity of the ELSP with general cyclic schedules

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL COMPLEXITY; CONSTRAINT THEORY; INDUSTRIAL ECONOMICS; PRODUCTION;

EID: 0031069125     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408179708966318     Document Type: Article
Times cited : (53)

References (11)
  • 1
    • 0020587837 scopus 로고
    • On the general feasibility of scheduling lot sizes of several products on one machine
    • Hsu, W.L., (1983) On the general feasibility of scheduling lot sizes of several products on one machine. Management Science, 29, 93–105.
    • (1983) Management Science , vol.29 , pp. 93-105
    • Hsu, L.1
  • 2
    • 0442314870 scopus 로고
    • Mathematical pitfalls in the one machine multi-product lot scheduling problem
    • Schweitzer, P.J., and Silver, E.A., (1983) Mathematical pitfalls in the one machine multi-product lot scheduling problem. Operations Research, 31, 401–405.
    • (1983) Operations Research , vol.31 , pp. 401-405
    • Schweitzer, P.J.1    Silver, E.A.2
  • 4
    • 0343086507 scopus 로고
    • Inventory coordination and pricing decisions analysis of a simple class of heuristics
    • Sciomachen, A. (ed.), Mathematical Programming and Modeling Techniques in Practice, Wiley, New York
    • Gallego, G., and Queyranne, M., (1995) Inventory coordination and pricing decisions analysis of a simple class of heuristics, in Sciomachen, A. (ed.), Optimization in Industry, vol. 3 (Mathematical Programming and Modeling Techniques in Practice), Wiley, New York, pp. 83–107
    • (1995) Optimization in Industry , vol.3 , pp. 83-107
    • Gallego, G.1    Queyranne, M.2
  • 5
    • 0015669867 scopus 로고
    • An iterative procedure for the single machine multi product lot scheduling problem
    • Doll, C., and Whybark, D., (1973) An iterative procedure for the single machine multi product lot scheduling problem. Management Science, 20, 50–55.
    • (1973) Management Science , vol.20 , pp. 50-55
    • Doll, C.1    Whybark, D.2
  • 6
    • 0017931081 scopus 로고
    • The economic lot scheduling problem (ELSP) review and extensions
    • Elmaghraby, S.E., (1978) The economic lot scheduling problem (ELSP) review and extensions. Management Science, 24, 587–598.
    • (1978) Management Science , vol.24 , pp. 587-598
    • Elmaghraby, S.E.1
  • 7
    • 0023420909 scopus 로고
    • The economic lot scheduling problem achieving feasibility using time-varying lot sizes
    • Dobson, G., (1987) The economic lot scheduling problem achieving feasibility using time-varying lot sizes. Operations Research, 35, 764–771.
    • (1987) Operations Research , vol.35 , pp. 764-771
    • Dobson, G.1
  • 9
    • 0017505335 scopus 로고
    • Lot sizing and sequencing for N products on one facility
    • Delporte, CM., and Thomas, L.J., (1978) Lot sizing and sequencing for N products on one facility. Management Science, 23, 1070–1079.
    • (1978) Management Science , vol.23 , pp. 1070-1079
    • Delporte, C.M.1    Thomas, L.J.2
  • 10
    • 0022757594 scopus 로고
    • A note on linear programming and the single machine lot size scheduling problem
    • Hodgson, T., and Nuttle, H., (1986) A note on linear programming and the single machine lot size scheduling problem. International Journal of Production Research, 24, 939–943.
    • (1986) International Journal of Production Research , vol.24 , pp. 939-943
    • Hodgson, T.1    Nuttle, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.