메뉴 건너뛰기




Volumn , Issue , 2007, Pages 919-925

Effects of imperfect products and rework on lot sizing with work in process inventory

Author keywords

Lot sizing; Reworking; Work in process inventory

Indexed keywords

AUTOMATION; EXHIBITIONS; HELIUM; INDUSTRIAL ENGINEERING; INVENTORY CONTROL; PAPER; PRODUCTION CONTROL; PROJECT MANAGEMENT; SYSTEMS ENGINEERING; TECHNOLOGY;

EID: 44949250732     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (2)

References (21)
  • 1
    • 0022613610 scopus 로고
    • Optimal lot-sizing process quality improvement and setup cost reduction
    • Porteus E.L., 1986, Optimal lot-sizing process quality improvement and setup cost reduction, Operation Research 34, 137-144.
    • (1986) Operation Research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 3
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycles and inspection schedules in a production system
    • Lee H.L., Rosenblatt M.J., 1987, Simultaneous determination of production cycles and inspection schedules in a production system, Management Science, 33, 1125-1137.
    • (1987) Management Science , vol.33 , pp. 1125-1137
    • Lee, H.L.1    Rosenblatt, M.J.2
  • 5
    • 0024014390 scopus 로고
    • A quality control model with learning effects
    • Fine C.H., 1988, A quality control model with learning effects, Operation Research, 36, 437-444.
    • (1988) Operation Research , vol.36 , pp. 437-444
    • Fine, C.H.1
  • 8
    • 69749123862 scopus 로고    scopus 로고
    • Observation on: Economic production quantity model for items with imperfect quality [International Journal of Production Economics 64, 59-64]
    • Cardenas-Barron LE., 2000, Observation on: economic production quantity model for items with imperfect quality [International Journal of Production Economics 64, 59-64], International Journal of Production Economics, 67, 201.
    • (2000) International Journal of Production Economics , vol.67 , pp. 201
    • Cardenas-Barron, L.E.1
  • 10
    • 0036568439 scopus 로고    scopus 로고
    • Note on: Economic production quantity model for items with imperfect quality - a practical approach
    • Goyal, S.K., Cardenas-Baron, L.E., 2002, Note on: Economic production quantity model for items with imperfect quality - a practical approach. International Journal of Production Economics, 77, 85-87.
    • (2002) International Journal of Production Economics , vol.77 , pp. 85-87
    • Goyal, S.K.1    Cardenas-Baron, L.E.2
  • 11
    • 0035470201 scopus 로고    scopus 로고
    • Production lot sizing with the reworking of imperfect quality items produced
    • Hayek, P.A., Salameh, M.K., 2001. Production lot sizing with the reworking of imperfect quality items produced. Production Planning and Control, 12, 584-590.
    • (2001) Production Planning and Control , vol.12 , pp. 584-590
    • Hayek, P.A.1    Salameh, M.K.2
  • 12
    • 0142090745 scopus 로고    scopus 로고
    • Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging
    • Chiu, Y.P., 2003, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging, Engineering Optimization, 35 (4), 427-437.
    • (2003) Engineering Optimization , vol.35 , Issue.4 , pp. 427-437
    • Chiu, Y.P.1
  • 13
    • 0345872325 scopus 로고    scopus 로고
    • A new EPQ model: Integrating lower pricing, rework and reject situations
    • Chan, W.M., Ibrahim, R.N., Lochert, P.B., 2003, A new EPQ model: Integrating lower pricing, rework and reject situations, Production Planning and Control, 14, 588-595.
    • (2003) Production Planning and Control , vol.14 , pp. 588-595
    • Chan, W.M.1    Ibrahim, R.N.2    Lochert, P.B.3
  • 14
    • 3242701287 scopus 로고    scopus 로고
    • Optimal manufacturing batch size with rework process at a single-stage production system
    • Jamal A.M.M., Sarker B. R., Mondal S., 2004, Optimal manufacturing batch size with rework process at a single-stage production system, Computers & Industrial Engineering, 47, 77-89 89.
    • (2004) Computers & Industrial Engineering , vol.47 , Issue.77-89 , pp. 89
    • Jamal, A.M.M.1    Sarker, B.R.2    Mondal, S.3
  • 16
    • 44949216140 scopus 로고    scopus 로고
    • The single period problem with stochastic initial inventory
    • Bijari M. Haji R.,2004, The single period problem with stochastic initial inventory, International Journal of Engineering Science, 15 (2), 47-54.
    • (2004) International Journal of Engineering Science , vol.15 , Issue.2 , pp. 47-54
    • Bijari, M.1    Haji, R.2
  • 18
    • 27444445374 scopus 로고    scopus 로고
    • Integrated inventory control and inspection policies with deterministic demand
    • Ben-Daya, M., Nomana, S.M. & Harigab M., 2006, Integrated inventory control and inspection policies with deterministic demand. Computers and Operations Research, 33(6), 1625-1638.
    • (2006) Computers and Operations Research , vol.33 , Issue.6 , pp. 1625-1638
    • Ben-Daya, M.1    Nomana, S.M.2    Harigab, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.