-
1
-
-
0032074551
-
The impact of priority rule combinations on lateness and tardiness
-
Barman, S.: The Impact of Priority Rule Combinations on Lateness and Tardiness. IIE Transactions 30 (1998) 495-504
-
(1998)
IIE Transactions
, vol.30
, pp. 495-504
-
-
Barman, S.1
-
2
-
-
0037546939
-
A neural networks approach for due-date assignment in a wafer fabrication factory
-
Chang, P.-C., Hsieh, J.-C.: A Neural Networks Approach for Due-date Assignment in a Wafer Fabrication Factory. International Journal of Industrial Engineering 10(1) (2003) 55-61
-
(2003)
International Journal of Industrial Engineering
, vol.10
, Issue.1
, pp. 55-61
-
-
Chang, P.-C.1
Hsieh, J.-C.2
-
3
-
-
67749133834
-
A case-based reasoning approach for due date assignment in a wafer fabrication factory
-
Vancouver, British Columbia, Canada
-
Chang, P.-C., Hsieh, J.-C., Liao, T. W.: A Case-based Reasoning Approach for Due Date Assignment in a Wafer Fabrication Factory. In: Proceedings of the International Conference on Case-Based Reasoning (ICCBR 2001), Vancouver, British Columbia, Canada (2001)
-
(2001)
Proceedings of the International Conference on Case-Based Reasoning (ICCBR 2001)
-
-
Chang, P.-C.1
Hsieh, J.-C.2
Liao, T.W.3
-
4
-
-
23044463387
-
Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory
-
Chang, P.-C., Hsieh, J.-C., Liao, T. W.: Evolving Fuzzy Rules for Due-date Assignment Problem in Semiconductor Manufacturing Factory. Journal of Intelligent Manufacturing 16 (2005) 549-557
-
(2005)
Journal of Intelligent Manufacturing
, vol.16
, pp. 549-557
-
-
Chang, P.-C.1
Hsieh, J.-C.2
Liao, T.W.3
-
5
-
-
15844419035
-
A fuzzy back propagation network for output time prediction in a wafer fab
-
Chen, T.: A Fuzzy Back Propagation Network for Output Time Prediction in a Wafer Fab. Journal of Applied Soft Computing 2/3F (2003) 211-222
-
(2003)
Journal of Applied Soft Computing
, vol.2-3 F
, pp. 211-222
-
-
Chen, T.1
-
6
-
-
0031246943
-
The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories
-
Chung, S.-H., Yang, M.-H., Cheng, C.-M.: The Design of Due Date Assignment Model and the Determination of Flow Time Control Parameters for the Wafer Fabrication Factories. IEEE Transactions on Components, Packaging, and Manufacturing Technology - Part C 20(4) (1997) 278-287
-
(1997)
IEEE Transactions on Components, Packaging, and Manufacturing Technology - Part C
, vol.20
, Issue.4
, pp. 278-287
-
-
Chung, S.-H.1
Yang, M.-H.2
Cheng, C.-M.3
-
7
-
-
0026851662
-
Neural network forecasting of short, noisy time series
-
Foster, W. R., Gollopy, F., Ungar, L. H.: Neural Network Forecasting of Short, Noisy Time Series. Computers in Chemical Engineering 16(4) (1992) 293-297
-
(1992)
Computers in Chemical Engineering
, vol.16
, Issue.4
, pp. 293-297
-
-
Foster, W.R.1
Gollopy, F.2
Ungar, L.H.3
-
8
-
-
0003722376
-
-
Addison-Wesley, Reading, MA
-
Goldberg, D. E.: Genetic Algorithms in Search, Optimization, and Machine Learning. Addison-Wesley, Reading, MA (1989)
-
(1989)
Genetic Algorithms in Search, Optimization, and Machine Learning
-
-
Goldberg, D.E.1
-
10
-
-
0002197262
-
Distributed representation of fuzzy rules and its application to pattern classification
-
Ishibuchi, H., Nozaki, K., Tanaka, H.: Distributed Representation of Fuzzy Rules and Its Application to Pattern Classification. Fuzzy Sets and Systems 52(1) (1992) 21-32
-
(1992)
Fuzzy Sets and Systems
, vol.52
, Issue.1
, pp. 21-32
-
-
Ishibuchi, H.1
Nozaki, K.2
Tanaka, H.3
-
12
-
-
0032749972
-
Theory and methodology - Financial credit-risk evaluation with neural and neuralfuzzy systems
-
Piramuthu, S.: Theory and Methodology - Financial Credit-risk Evaluation with Neural and Neuralfuzzy Systems. European Journal of Operational Research 112 (1991) 310-321
-
(1991)
European Journal of Operational Research
, vol.112
, pp. 310-321
-
-
Piramuthu, S.1
-
15
-
-
0026943536
-
Generating fuzzy rules by learning from examples
-
Wang, L.-X., Mendel, J. M.: Generating Fuzzy Rules by Learning from Examples. IEEE Transactions on Systems, Man, and Cybernetics 22(6) (1992) 1414-1427
-
(1992)
IEEE Transactions on Systems, Man, and Cybernetics
, vol.22
, Issue.6
, pp. 1414-1427
-
-
Wang, L.-X.1
Mendel, J.M.2
-
16
-
-
0018454859
-
A simulation study of predictable due-dates
-
Weeks, J. K.: A Simulation Study of Predictable Due-dates. Management Science 25 (1979) 363-373
-
(1979)
Management Science
, vol.25
, pp. 363-373
-
-
Weeks, J.K.1
|