메뉴 건너뛰기




Volumn 101, Issue 3, 1997, Pages 474-485

Lead time and response time in a pull production control system

Author keywords

Customer service; Manufacturing; Pull systems; Queuing models; Time based competition

Indexed keywords

COMPETITION; MANUFACTURE; MATHEMATICAL MODELS; OPTIMIZATION; PERFORMANCE; PRODUCTION CONTROL; PRODUCTIVITY; QUEUEING THEORY;

EID: 0031221480     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(96)00174-9     Document Type: Article
Times cited : (22)

References (29)
  • 1
    • 0000357181 scopus 로고
    • A model for continuous-review pull policies in serial inventory systems
    • Badinelli, R.D. (1992), "A Model for Continuous-Review Pull Policies in Serial Inventory Systems", Operations Research 40 (1), 142-156.
    • (1992) Operations Research , vol.40 , Issue.1 , pp. 142-156
    • Badinelli, R.D.1
  • 2
    • 84986958388 scopus 로고
    • A review of the kanban production control research literature
    • Berkley, B.J. (1992), "A Review of the Kanban Production Control Research Literature", Production and Operations Management 1 (4), 393-411.
    • (1992) Production and Operations Management , vol.1 , Issue.4 , pp. 393-411
    • Berkley, B.J.1
  • 3
    • 0023330726 scopus 로고
    • A mathematical programming approach to a deterministic kanban system
    • Bitran, G.R., and Chang, L., (1987), "A Mathematical Programming Approach to a Deterministic Kanban System", Management Science 33, 427-442.
    • (1987) Management Science , vol.33 , pp. 427-442
    • Bitran, G.R.1    Chang, L.2
  • 4
    • 30244468278 scopus 로고
    • Lot sizing under (Q, R) policy in a capacity constrained manufacturing facility
    • Bitran, G.R., and Tirupati, D., (1984), "Lot Sizing Under (Q, R) Policy in a Capacity Constrained Manufacturing Facility", Robotics & Computer-Integrated Manufacturing 1 (3/4), 327-337.
    • (1984) Robotics & Computer-Integrated Manufacturing , vol.1 , Issue.3-4 , pp. 327-337
    • Bitran, G.R.1    Tirupati, D.2
  • 6
    • 0024719991 scopus 로고
    • Queuing models of kanban and MRP controlled production systems
    • Buzacott, J.A. (1989), "Queuing Models of Kanban and MRP Controlled Production Systems", Engineering Costs and Production Economics 17, 3-20.
    • (1989) Engineering Costs and Production Economics , vol.17 , pp. 3-20
    • Buzacott, J.A.1
  • 8
    • 0023981636 scopus 로고
    • Empirical evaluation of a queueing network model for semiconductor wafer fabrication
    • Chen, H., Harrison, M.J., Mandelbaum, A., VanAckere, A., and Wein, L.M. (1988), "Empirical Evaluation of a Queueing Network Model for Semiconductor Wafer Fabrication", Operations Research 36 (2), 202-215.
    • (1988) Operations Research , vol.36 , Issue.2 , pp. 202-215
    • Chen, H.1    Harrison, M.J.2    Mandelbaum, A.3    Vanackere, A.4    Wein, L.M.5
  • 10
    • 0001026422 scopus 로고
    • Linear control of a markov production system
    • Denardo, E.V., and Tang, C.S. ( 1992), "Linear Control of a Markov Production System", Operations Research 40 (2), 259-278.
    • (1992) Operations Research , vol.40 , Issue.2 , pp. 259-278
    • Denardo, E.V.1    Tang, C.S.2
  • 11
    • 0023310940 scopus 로고
    • Lotsizes, lead times and in-process inventories
    • Karmarkar, U.S. (1987), "Lotsizes, Lead Times and In-Process Inventories", Management Science 33 (3), 409-418.
    • (1987) Management Science , vol.33 , Issue.3 , pp. 409-418
    • Karmarkar, U.S.1
  • 17
    • 0025564738 scopus 로고
    • Analysis of a kanban discipline for cell coordination in production lines
    • Mitra, D., and Mitrani, I. (1990), "Analysis of A Kanban Discipline for Cell Coordination in Production Lines, I", Management Science 36 (12), 1548-1566.
    • (1990) Management Science , vol.36 , Issue.12 , pp. 1548-1566
    • Mitra, D.1    Mitrani, I.2
  • 18
    • 0026223819 scopus 로고
    • Analysis of a kanban discipline for cell coordination in production lines, II: Stochastic demands
    • Mitra, D., and Mitrani, I. (1991), "Analysis of A Kanban Discipline for Cell Coordination in Production Lines, II: Stochastic Demands", Operations Research 39 (5), 807-823.
    • (1991) Operations Research , vol.39 , Issue.5 , pp. 807-823
    • Mitra, D.1    Mitrani, I.2
  • 20
    • 0023310442 scopus 로고
    • An investigation of factors influencing the number of kanbans required in the implementation of the JIT technique with kanbans
    • Philipoom, P., Rees, L., Taylor III, B., and Huang, P. (1987), "An Investigation of Factors Influencing the Number of Kanbans Required in the Implementation of the JIT Technique with Kanbans", International Journal of Production Research 25 (3), 457-472.
    • (1987) International Journal of Production Research , vol.25 , Issue.3 , pp. 457-472
    • Philipoom, P.1    Rees, L.2    Taylor B. III3    Huang, P.4
  • 21
    • 0023365980 scopus 로고
    • Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of leadtime
    • Rees, L., Philipoom, P., Taylor III, B., and Huang, P. (1987), "Dynamically Adjusting the Number of Kanbans in a Just-In-Time Production System Using Estimated Values of Leadtime", IIE Transactions 19 (2), 199-207.
    • (1987) IIE Transactions , vol.19 , Issue.2 , pp. 199-207
    • Rees, L.1    Philipoom, P.2    Taylor B. III3    Huang, P.4
  • 25
    • 0001921931 scopus 로고
    • Japanese manufacturing techniques: Their importance to U.S. Manufacturers
    • Suzaki, K. (1985), "Japanese Manufacturing Techniques: Their Importance to U.S. Manufacturers", The Journal of Business Strategy 5 (3), 10-19.
    • (1985) The Journal of Business Strategy , vol.5 , Issue.3 , pp. 10-19
    • Suzaki, K.1
  • 26
    • 0025568624 scopus 로고
    • The impact of uncertainty on a production line
    • Tang, C.S. (1990), "The Impact of Uncertainty on a Production Line", Management Science 36 (11), 1518-1531.
    • (1990) Management Science , vol.36 , Issue.11 , pp. 1518-1531
    • Tang, C.S.1
  • 27
    • 21144459469 scopus 로고
    • Properties of serial kanban lines
    • Tayur, S.R. (1992), "Properties of Serial Kanban Lines", Queuing Systems 12, 297-318.
    • (1992) Queuing Systems , vol.12 , pp. 297-318
    • Tayur, S.R.1
  • 28
    • 0027696153 scopus 로고
    • Structural properties and a heuristic for kanban controlled serial lines
    • Tayur, S.R. (1993), "Structural Properties and a Heuristic for Kanban Controlled Serial Lines", Management Science 39 (11), 1347-1368.
    • (1993) Management Science , vol.39 , Issue.11 , pp. 1347-1368
    • Tayur, S.R.1
  • 29
    • 0026374299 scopus 로고
    • Optimum number of kanbans between two adjacent workstations in a JIT system
    • Wang, H., and Wang, H. (1991), "Optimum Number of Kanbans between Two Adjacent Workstations in a JIT System", International Journal of Production Economics 22, 179-188.
    • (1991) International Journal of Production Economics , vol.22 , pp. 179-188
    • Wang, H.1    Wang, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.