Volumn 33, Issue 12, 2006, Pages 1490-1504

Modeling and coordinating building systems in three dimensions: A case study

Author keywords

3 D modeling; Building systems; Constructability; Knowledge framework; Mechanical, electrical, and plumbing (MEP) coordination; Product and process modeling

Indexed keywords

ARCHITECTURAL DESIGN; COMPUTER AIDED SOFTWARE ENGINEERING; COMPUTER SIMULATION; CONSTRUCTION;

EID: 34249807025     PISSN: 03151468     EISSN: None     Source Type: Journal    
DOI: 10.1139/L06-124     Document Type: Article
Times cited : (21)

References (12)
  • 1
    • 0026131327 scopus 로고
    • Constructability and constructability programs: White paper
    • ASCE American Society of Civil Engineers
    • ASCE (American Society of Civil Engineers). 1991. Constructability and constructability programs: White paper. ASCE Journal of Construction Engineering and Management, 117(1): 67-89.
    • (1991) ASCE Journal of Construction Engineering and Management , vol.117 , Issue.1 , pp. 67-89
  • 3
    • 0003747807 scopus 로고
    • CII Construction Industry Institute, CII, Bureau of Engineering Research, University of Texas at Austin, Tex. Publication 3-1
    • CII (Construction Industry Institute). 1986. Constructability: a primer. CII, Bureau of Engineering Research, University of Texas at Austin, Tex. Publication 3-1.
    • (1986) Constructability: A primer
  • 6
    • 84866126106 scopus 로고    scopus 로고
    • Case study of the implementation of the Lean Project Delivery System (LPDS) using virtual building technologies on a large healthcare project
    • Sydney, Australia, 19-21 July
    • Khanzode, A., Fischer, M., and Reed, D. 2005. Case study of the implementation of the Lean Project Delivery System (LPDS) using virtual building technologies on a large healthcare project. In Proceedings of the 13th International Group for Lean Construction Conference (IGLC-13), Sydney, Australia, 19-21 July 2005. pp. 143-150.
    • (2005) Proceedings of the 13th International Group for Lean Construction Conference (IGLC-13) , pp. 143-150
    • Khanzode, A.1    Fischer, M.2    Reed, D.3
  • 7
    • 9344245058 scopus 로고    scopus 로고
    • Development of a knowledge-based system to improve mechanical, electrical, and plumbing coordination. Centre for Integrated Facility Engineering, Stanford University, Stanford, Calif
    • Technical Report No. 129
    • Korman, T.M., and Tatum, C.B. 2001. Development of a knowledge-based system to improve mechanical, electrical, and plumbing coordination. Centre for Integrated Facility Engineering, Stanford University, Stanford, Calif. Technical Report No. 129.
    • (2001)
    • Korman, T.M.1    Tatum, C.B.2
  • 10
    • 0042861949 scopus 로고    scopus 로고
    • Industrial case study of electronic design, cost, and schedule integration. Centre for Integrated Facility Engineering, Stanford University, Stanford, Calif
    • Technical Report No. 122
    • Staub-French, S., and Fischer, M. 2001. Industrial case study of electronic design, cost, and schedule integration. Centre for Integrated Facility Engineering, Stanford University, Stanford, Calif. Technical Report No. 122.
    • (2001)
    • Staub-French, S.1    Fischer, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.