메뉴 건너뛰기




Volumn 161, Issue 2, 2008, Pages 73-81

Identifying risk factors of BOT for water supply projects

Author keywords

Risk probability analysis; Water supply

Indexed keywords

MATHEMATICAL MODELS; PROJECT MANAGEMENT; RISK ANALYSIS; WATER RESOURCES;

EID: 41549093344     PISSN: 17417589     EISSN: 17517729     Source Type: Journal    
DOI: 10.1680/wama.2008.161.2.73     Document Type: Article
Times cited : (19)

References (25)
  • 3
    • 0036160566 scopus 로고    scopus 로고
    • Prototype model for buildoperate-transfer risk assessment
    • ZAYED T. M. and CHANG L. M. Prototype model for buildoperate-transfer risk assessment. Journal of Management in Engineering, ASCE, 2002, 18, No. 1, 7-16.
    • (2002) Journal of Management in Engineering, ASCE , vol.18 , Issue.1 , pp. 7-16
    • ZAYED, T.M.1    CHANG, L.M.2
  • 6
    • 1942530582 scopus 로고    scopus 로고
    • The Huaibei power plant and its implications for the Chinese BOT market
    • SMITH N., ZHANG H. and ZHU Y. R. The Huaibei power plant and its implications for the Chinese BOT market. International Journal of Project Management, 2004, 22, 407-413.
    • (2004) International Journal of Project Management , vol.22 , pp. 407-413
    • SMITH, N.1    ZHANG, H.2    ZHU, Y.R.3
  • 8
    • 0033988396 scopus 로고    scopus 로고
    • Case study of government initiatives for PRC's BOT power plant project
    • WANG S. Q. and TIONG L. K. Case study of government initiatives for PRC's BOT power plant project. International Journal of Project Management, 2000, 18, No. 1, 69-78.
    • (2000) International Journal of Project Management , vol.18 , Issue.1 , pp. 69-78
    • WANG, S.Q.1    TIONG, L.K.2
  • 12
    • 0029747848 scopus 로고    scopus 로고
    • Company and project evaluation model for privately promoted infrastructure projects
    • DIAS A. Jr and IOANNOU P. O. Company and project evaluation model for privately promoted infrastructure projects. Journal of Construction Engineering and Management, ASCE, 1996, 122, No. 1, 71-82.
    • (1996) Journal of Construction Engineering and Management, ASCE , vol.122 , Issue.1 , pp. 71-82
    • DIAS Jr, A.1    IOANNOU, P.O.2
  • 13
    • 0037292985 scopus 로고    scopus 로고
    • Transforming project risk management into project uncertainty management
    • WARD S. and CHAPMAN C. Transforming project risk management into project uncertainty management. International Journal of Project Management, 2003, 21, 97-105.
    • (2003) International Journal of Project Management , vol.21 , pp. 97-105
    • WARD, S.1    CHAPMAN, C.2
  • 14
    • 0000619965 scopus 로고
    • Risks and guarantees in BOT tender
    • TIONG L. K. R. Risks and guarantees in BOT tender. Journal of Management in Engineering, 1995, 121, No. 2, 183-188.
    • (1995) Journal of Management in Engineering , vol.121 , Issue.2 , pp. 183-188
    • TIONG, L.K.R.1
  • 15
    • 20444507073 scopus 로고    scopus 로고
    • The financial risks in build-operate-transfer projects
    • XENIDIS Y. and ANGELIDES D. The financial risks in build-operate-transfer projects. Construction Management and Economics, 2005, 23, No. 4, 431-441.
    • (2005) Construction Management and Economics , vol.23 , Issue.4 , pp. 431-441
    • XENIDIS, Y.1    ANGELIDES, D.2
  • 19
    • 0002425683 scopus 로고
    • The analytic hierarchy process: A survey of the method and its applications
    • ZAHEDI F. The analytic hierarchy process: a survey of the method and its applications. Interfaces, 1986, 16, No. 4, 96-108.
    • (1986) Interfaces , vol.16 , Issue.4 , pp. 96-108
    • ZAHEDI, F.1
  • 21
    • 0345098580 scopus 로고    scopus 로고
    • Project risk management in the Queensland engineering construction industry: A survey
    • LYONS T. and SKITMORE M. Project risk management in the Queensland engineering construction industry: a survey. International Journal of Project Management, 2004, 22, No. 1, 51-61.
    • (2004) International Journal of Project Management , vol.22 , Issue.1 , pp. 51-61
    • LYONS, T.1    SKITMORE, M.2
  • 23
    • 0033879670 scopus 로고    scopus 로고
    • Positive management of differences for risk reduction in BOT projects
    • YEO K. T. and TIONG R. L. K. Positive management of differences for risk reduction in BOT projects. International Journal of Project Management, 2000, 18, No. 4, 257-265.
    • (2000) International Journal of Project Management , vol.18 , Issue.4 , pp. 257-265
    • YEO, K.T.1    TIONG, R.L.K.2
  • 25
    • 16444369164 scopus 로고    scopus 로고
    • Minimum feasible tariff model for BOT water supply projects in Malaysia
    • CHENG L. Y. and TIONG R. L. K. Minimum feasible tariff model for BOT water supply projects in Malaysia. Construction Management and Economics, 2005, 23, No. 3, 255-263.
    • (2005) Construction Management and Economics , vol.23 , Issue.3 , pp. 255-263
    • CHENG, L.Y.1    TIONG, R.L.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.