메뉴 건너뛰기




Volumn 16, Issue 1, 2005, Pages 81-97

Rolling horizon heuristics for production planning and set-up scheduling with backlogs and error-prone demand forecasts

Author keywords

Demand forecasts; Heuristics; Production planning; Rolling horizons; Set ups

Indexed keywords

DEMAND FORECASTS; PRODUCTION PLANNING; ROLLING HORIZONS; SET-UPS;

EID: 27844491012     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537280412331286565     Document Type: Article
Times cited : (29)

References (34)
  • 1
    • 4243370917 scopus 로고
    • Requirements planning
    • edited by S.C. Graves; Elsevier Science: New York
    • Baker, K.R., Requirements planning. In Handbooks in Operations Research and Management Science, edited by S.C. Graves; Vol. 4, pp. 571-627, 1993 (Elsevier Science: New York).
    • (1993) Handbooks in Operations Research and Management Science , vol.4 , pp. 571-627
    • Baker, K.R.1
  • 2
    • 0001731442 scopus 로고
    • An analytical framework for evaluating rolling horizon schedules
    • Baker, K.R. and Peterson, D.W., An analytical framework for evaluating rolling horizon schedules. Management Science, 1979, 25, 341-351.
    • (1979) Management Science , vol.25 , pp. 341-351
    • Baker, K.R.1    Peterson, D.W.2
  • 4
    • 0022693736 scopus 로고
    • A comparison of strategies to dampen nervousness in MRP systems
    • Blackburn, J.D., Kropp, D.H. and Millen, R.A., A comparison of strategies to dampen nervousness in MRP systems. Management Science, 1986, 32(4), 413-429.
    • (1986) Management Science , vol.32 , Issue.4 , pp. 413-429
    • Blackburn, J.D.1    Kropp, D.H.2    Millen, R.A.3
  • 5
    • 0032044738 scopus 로고    scopus 로고
    • Batch sequencing and sizing with regular varying demand
    • Clark, A.R., 1998, Batch sequencing and sizing with regular varying demand. Production Planning & Control, 9(3), 260-266.
    • (1998) Production Planning & Control , vol.9 , Issue.3 , pp. 260-266
    • Clark, A.R.1
  • 6
    • 0037432979 scopus 로고    scopus 로고
    • Optimization approximations for capacity constrained material requirements planning
    • Clark, A.R., Optimization approximations for capacity constrained material requirements planning. International Journal of Production Economics, 2003, 84(2), 115-131.
    • (2003) International Journal of Production Economics , vol.84 , Issue.2 , pp. 115-131
    • Clark, A.R.1
  • 7
    • 0034631279 scopus 로고    scopus 로고
    • Rolling-horizon lot-sizing when setup times are sequence-dependent
    • Clark, A.R. and Clark, S.J., Rolling-horizon lot-sizing when setup times are sequence-dependent. International Journal of Production Research, 2000, 38(10), 2287-2308.
    • (2000) International Journal of Production Research , vol.38 , Issue.10 , pp. 2287-2308
    • Clark, A.R.1    Clark, S.J.2
  • 8
    • 84989457223 scopus 로고
    • Cost increases due to demand uncertainty in MRP lot sizing
    • De Bodt, M.A. and Van Wassenhove, L.N., Cost increases due to demand uncertainty in MRP lot sizing. Decision Sciences, 1983, 13(3), 345-362.
    • (1983) Decision Sciences , vol.13 , Issue.3 , pp. 345-362
    • De Bodt, M.A.1    Van Wassenhove, L.N.2
  • 9
    • 0000685021 scopus 로고    scopus 로고
    • Rtn-based rolling horizon algorithms for medium term scheduling of multipurpose plants
    • Dimitriadis, A.D., Shah, N. and Pantelides, C.C., Rtn-based rolling horizon algorithms for medium term scheduling of multipurpose plants. Computers and Chemical Engineering, 1997, 21(Supplement), S1061-S1066.
    • (1997) Computers and Chemical Engineering , vol.21 , Issue.SUPPL.
    • Dimitriadis, A.D.1    Shah, N.2    Pantelides, C.C.3
  • 13
    • 0008655177 scopus 로고    scopus 로고
    • The general lotsizing and scheduling problem
    • Fleischman, B. and Meyr, H., The general lotsizing and scheduling problem. OR Spektrum, 1997, 19(1), 11-21.
    • (1997) OR Spektrum , vol.19 , Issue.1 , pp. 11-21
    • Fleischman, B.1    Meyr, H.2
  • 15
    • 0036174304 scopus 로고    scopus 로고
    • Integrating management judgment and statistical methods to improve short-term forecasts
    • Goodwin, P., Integrating management judgment and statistical methods to improve short-term forecasts. Omega, 2002, 30, 127-135.
    • (2002) Omega , vol.30 , pp. 127-135
    • Goodwin, P.1
  • 17
    • 0037143048 scopus 로고    scopus 로고
    • Evaluating dampening effects of alternative lot-sizing rules to reduce MRP system nervousness
    • Ho, C.-J., Evaluating dampening effects of alternative lot-sizing rules to reduce MRP system nervousness. International Journal of Production Research, 2002, 40(11), 2633-2652.
    • (2002) International Journal of Production Research , vol.40 , Issue.11 , pp. 2633-2652
    • Ho, C.-J.1
  • 18
    • 34547220494 scopus 로고    scopus 로고
    • ILOG S.A, BP 85, 9 Rue de Verdun, 94253 Gentilly Cedex, France, www.iro.umontreal.ca/~gendron/IFT6551/CPLEX
    • ILOG, CPLEX 7.1 User's Manual, ILOG S.A, BP 85, 9 Rue de Verdun, 94253 Gentilly Cedex, France, 2001 (www.cplex.com and www.iro.umontreal.ca/~gendron/ IFT6551/CPLEX).
    • (2001) CPLEX 7.1 User's Manual
  • 20
    • 0041511823 scopus 로고    scopus 로고
    • The capacitated lot sizing problem: A review of models and algorithms
    • Karimia, B., Fatemi Ghomia, S.M.T. and Wilson, J.M., The capacitated lot sizing problem: a review of models and algorithms. Omega, 2003, 31, 365-378.
    • (2003) Omega , vol.31 , pp. 365-378
    • Karimia, B.1    Fatemi Ghomia, S.M.T.2    Wilson, J.M.3
  • 21
    • 0034333693 scopus 로고    scopus 로고
    • New lot-sizing formulations for less nervous production schedules
    • Kazan, O., Nagi, R. and Rump, C.M., New lot-sizing formulations for less nervous production schedules. Computers and Operations Research, 2000, 27, 1325-1345.
    • (2000) Computers and Operations Research , vol.27 , pp. 1325-1345
    • Kazan, O.1    Nagi, R.2    Rump, C.M.3
  • 22
    • 0001694846 scopus 로고    scopus 로고
    • Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling and lot sizing
    • Kimms, A., Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling and lot sizing. Omega, 1998, 26(3), 355-366.
    • (1998) Omega , vol.26 , Issue.3 , pp. 355-366
    • Kimms, A.1
  • 23
    • 84989427471 scopus 로고
    • Heuristic lot-sizing approaches for dealing with MRP systems nervousness
    • Kropp, D.H., Carlson, R.C. and Jucker, J.V., Heuristic lot-sizing approaches for dealing with MRP systems nervousness. Decision Sciences, 1983, 14, 156-165.
    • (1983) Decision Sciences , vol.14 , pp. 156-165
    • Kropp, D.H.1    Carlson, R.C.2    Jucker, J.V.3
  • 25
    • 0022735070 scopus 로고
    • Multi item single level capacitated dynamic lotsizing heuristics: A computational comparison. Part ii: Rolling horizon
    • Maes, J. and Van Wassenhove, L.N., Multi item single level capacitated dynamic lotsizing heuristics: a computational comparison. Part ii: Rolling horizon. IIE Transactions, 1986, 18, 124-129.
    • (1986) IIE Transactions , vol.18 , pp. 124-129
    • Maes, J.1    Van Wassenhove, L.N.2
  • 27
    • 0002657699 scopus 로고
    • A heuristic for selecting lot size quantities for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment
    • Silver, E.A. and Meal, H.C., A heuristic for selecting lot size quantities for the case of a deterministic time-varying demand rate and discrete opportunities for replenishment. Production and Inventory Management, 1973, 14, 64-74.
    • (1973) Production and Inventory Management , vol.14 , pp. 64-74
    • Silver, E.A.1    Meal, H.C.2
  • 28
    • 0035427489 scopus 로고    scopus 로고
    • Questioning the relative virtues of dynamic lot sizing rules
    • Simpson, N. C., Questioning the relative virtues of dynamic lot sizing rules. Computers and Operations Research, 2001, 28, 899-914.
    • (2001) Computers and Operations Research , vol.28 , pp. 899-914
    • Simpson, N.C.1
  • 29
    • 0002586278 scopus 로고
    • Freezing the master production schedule for make-to-stock products under demand uncertainty in a rolling horizon planning environment
    • Sridharan, V. and Berry, W.L., Freezing the master production schedule for make-to-stock products under demand uncertainty in a rolling horizon planning environment. Decision Sciences, 1990, 21(1), 87-120.
    • (1990) Decision Sciences , vol.21 , Issue.1 , pp. 87-120
    • Sridharan, V.1    Berry, W.L.2
  • 30
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • Wagner, H.M. and Whitin, T.M., Dynamic version of the economic lot size model. Management Science, 1958, 5, 89-96.
    • (1958) Management Science , vol.5 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.M.2
  • 31
    • 84985848169 scopus 로고
    • Comments on 'Cost increases due to demand uncertainty in MRP lot-sizing': A verification of ordering probabilities
    • Wemmerlöv, U., Comments on 'Cost increases due to demand uncertainty in MRP lot-sizing': a verification of ordering probabilities. Decision Sciences, 1985, 16(4), 410-419.
    • (1985) Decision Sciences , vol.16 , Issue.4 , pp. 410-419
    • Wemmerlöv, U.1
  • 32
    • 0037464628 scopus 로고    scopus 로고
    • Freezing the master production schedule under single resource constraint and demand uncertainty
    • Xie, J., Zhao, X., Lee, T.S. and Goodale, J., Freezing the master production schedule under single resource constraint and demand uncertainty. International Journal of Production Economics, 2003, 83, 65-84.
    • (2003) International Journal of Production Economics , vol.83 , pp. 65-84
    • Xie, J.1    Zhao, X.2    Lee, T.S.3    Goodale, J.4
  • 33
    • 0027612429 scopus 로고
    • Freezing the master production schedule in multilevel material requirements planning systems under demand uncertainty
    • Zhao, X. and Lee, T.S., Freezing the master production schedule in multilevel material requirements planning systems under demand uncertainty. Journal of Operations Management, 1993, 11, 185-205.
    • (1993) Journal of Operations Management , vol.11 , pp. 185-205
    • Zhao, X.1    Lee, T.S.2
  • 34
    • 84884343507 scopus 로고
    • Lot-sizing rules and freezing the master production schedule in MRP systems under demand uncertainty
    • Zhao, X., Lee, T.S. and Goodale, J., Lot-sizing rules and freezing the master production schedule in MRP systems under demand uncertainty. International Journal of Production Research, 1995, 33(8), 2241-2276.
    • (1995) International Journal of Production Research , vol.33 , Issue.8 , pp. 2241-2276
    • Zhao, X.1    Lee, T.S.2    Goodale, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.