메뉴 건너뛰기




Volumn 46, Issue 7, 2008, Pages 1787-1812

Inventory management practices and their implications on perceived planning performance

Author keywords

Inventory management; Materials requirements planning; Performance; Planning environment; Planning parameters; Re order point

Indexed keywords

INDUSTRIAL MANAGEMENT; PARAMETER ESTIMATION; STRATEGIC PLANNING;

EID: 39449124637     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540600988071     Document Type: Article
Times cited : (40)

References (32)
  • 1
    • 0026367452 scopus 로고
    • Safety stock and service levels in periodic review systems
    • Benton, W.C., Safety stock and service levels in periodic review systems. J. Oper. Res. Soc., 1991, 42, 1087-1095.
    • (1991) J. Oper. Res. Soc , vol.42 , pp. 1087-1095
    • Benton, W.C.1
  • 2
    • 21144484323 scopus 로고
    • Linking systems to strategy
    • Berry, W. and Hill, T., Linking systems to strategy. Int. J. Oper. Prod. Manage., 1992, 12(10), 3-15.
    • (1992) Int. J. Oper. Prod. Manage , vol.12 , Issue.10 , pp. 3-15
    • Berry, W.1    Hill, T.2
  • 3
    • 0002647291 scopus 로고
    • A survey of MRP implementation
    • Cerveny, R. and Scott, L., A survey of MRP implementation. Prod. Invent. Manage. J., 1989, 30(3), 31-35.
    • (1989) Prod. Invent. Manage. J , vol.30 , Issue.3 , pp. 31-35
    • Cerveny, R.1    Scott, L.2
  • 4
    • 0032599602 scopus 로고    scopus 로고
    • The effect of batch size selection on MRP performance
    • Enns, S., The effect of batch size selection on MRP performance. Comp. & Indust. Eng., 1999, 37, 15-19.
    • (1999) Comp. & Indust. Eng , vol.37 , pp. 15-19
    • Enns, S.1
  • 5
    • 0033993129 scopus 로고    scopus 로고
    • Research on changes of total cost of dynamic economic lot size
    • Huang, S.-T., Research on changes of total cost of dynamic economic lot size. Prod. Plan. & COM., 2000, 11(1), 54-61.
    • (2000) Prod. Plan. & COM , vol.11 , Issue.1 , pp. 54-61
    • Huang, S.-T.1
  • 7
    • 0041738935 scopus 로고    scopus 로고
    • The implication of fit between planning environments and manufacturing planning and control methods
    • Jonsson, P. and Mattsson, S.-A., The implication of fit between planning environments and manufacturing planning and control methods. Int. J. Oper. Prod. Manage., 2003, 23(8), 872-900.
    • (2003) Int. J. Oper. Prod. Manage , vol.23 , Issue.8 , pp. 872-900
    • Jonsson, P.1    Mattsson, S.-A.2
  • 8
    • 33747117599 scopus 로고    scopus 로고
    • A longitudinal study of material planning applications in manufacturing companies
    • Jonsson, P. and Mattsson, S.-A., A longitudinal study of material planning applications in manufacturing companies. Int. J. Oper. Prod. Manage., 2006, 26(9), 971-995.
    • (2006) Int. J. Oper. Prod. Manage , vol.26 , Issue.9 , pp. 971-995
    • Jonsson, P.1    Mattsson, S.-A.2
  • 9
    • 0023167521 scopus 로고
    • Kanban, MRP and shaping the manufacturing environment
    • Krajewski, L., King, B., Ritzman, L. and Wong, D., Kanban, MRP and shaping the manufacturing environment. Manage. Sci., 1987, 33(1), 39-57.
    • (1987) Manage. Sci , vol.33 , Issue.1 , pp. 39-57
    • Krajewski, L.1    King, B.2    Ritzman, L.3    Wong, D.4
  • 10
    • 0035998164 scopus 로고    scopus 로고
    • Aligning supply chain strategies with product uncertainties
    • Lee, H., Aligning supply chain strategies with product uncertainties. Calif. Manage. Rev., 2002, 44(3), 105-119.
    • (2002) Calif. Manage. Rev , vol.44 , Issue.3 , pp. 105-119
    • Lee, H.1
  • 11
    • 39449085131 scopus 로고    scopus 로고
    • May, N., Managing safety stocks. Midrange ERP, 1999, 8, 00, October.
    • May, N., Managing safety stocks. Midrange ERP, 1999, 8, 00, October.
  • 12
    • 0031123532 scopus 로고    scopus 로고
    • Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system
    • Molinder, A., Joint optimization of lot-sizes, safety stocks and safety lead times in an MRP system. Int. J. Prod. Res., 1997, 35(4), 983-994.
    • (1997) Int. J. Prod. Res , vol.35 , Issue.4 , pp. 983-994
    • Molinder, A.1
  • 13
    • 0002634714 scopus 로고
    • Manufacturing planning and control: Is there one definite answer?
    • Newman, W. and Sridharan, V., Manufacturing planning and control: is there one definite answer?. Prod. Invent. Manage. J., 1992, 33(1), 50-54.
    • (1992) Prod. Invent. Manage. J , vol.33 , Issue.1 , pp. 50-54
    • Newman, W.1    Sridharan, V.2
  • 14
    • 2442488882 scopus 로고    scopus 로고
    • Supply chain management survey of Swedish manufacturing firms
    • Olhager, J. and Seldin, E., Supply chain management survey of Swedish manufacturing firms. Int. J. Prod. Econ., 2004, 89, 353-361.
    • (2004) Int. J. Prod. Econ , vol.89 , pp. 353-361
    • Olhager, J.1    Seldin, E.2
  • 16
    • 0036852653 scopus 로고    scopus 로고
    • Enterprise-wide adoption patterns of inventory management practices and information systems
    • Rabinovich, E. and Evers, P., Enterprise-wide adoption patterns of inventory management practices and information systems. Transport. Res. Part E, 2002, 38, 389-404.
    • (2002) Transport. Res. Part E , vol.38 , pp. 389-404
    • Rabinovich, E.1    Evers, P.2
  • 17
    • 0037213090 scopus 로고    scopus 로고
    • Assessing the effects of operational processes and information systems on inventory performance
    • Rabinovich, E., Dresner, M. and Evers, P., Assessing the effects of operational processes and information systems on inventory performance. J. Oper. Manage., 2003, 21, 63-80.
    • (2003) J. Oper. Manage , vol.21 , pp. 63-80
    • Rabinovich, E.1    Dresner, M.2    Evers, P.3
  • 18
    • 0011577785 scopus 로고
    • The big gap in inventory management
    • Reuter, V., The big gap in inventory management. Int. J. Purch. Mater. Manage., 1978, 14(3), 227-230.
    • (1978) Int. J. Purch. Mater. Manage , vol.14 , Issue.3 , pp. 227-230
    • Reuter, V.1
  • 19
    • 0001160057 scopus 로고    scopus 로고
    • An empirical analysis of the product-process matrix
    • Safizadeh, H., Ritzman, L., Sharma, D. and Wood, C., An empirical analysis of the product-process matrix. Manage. Sci., 1996, 42(11), 1576-1591.
    • (1996) Manage. Sci , vol.42 , Issue.11 , pp. 1576-1591
    • Safizadeh, H.1    Ritzman, L.2    Sharma, D.3    Wood, C.4
  • 20
    • 0031276903 scopus 로고    scopus 로고
    • Linking performance drivers in production planning and inventory control to process choice
    • Safizadeh, H. and Ritzman, L., Linking performance drivers in production planning and inventory control to process choice. J. Oper. Manage., 1997, 15, 389-403.
    • (1997) J. Oper. Manage , vol.15 , pp. 389-403
    • Safizadeh, H.1    Ritzman, L.2
  • 21
    • 0032293709 scopus 로고    scopus 로고
    • Simple solutions aren't the best onKhyberes
    • Sandvig, C., Simple solutions aren't the best onKhyberes. IIE Solutions, 1998, 30(12), 28-29.
    • (1998) IIE Solutions , vol.30 , Issue.12 , pp. 28-29
    • Sandvig, C.1
  • 23
    • 33746786767 scopus 로고    scopus 로고
    • Master production scheduling and a comparison of materials requirements planning and cover-time planning
    • Segerstedt, A., Master production scheduling and a comparison of materials requirements planning and cover-time planning. Int. J. Prod. Res., 2006, 18, 3585-3606.
    • (2006) Int. J. Prod. Res , vol.18 , pp. 3585-3606
    • Segerstedt, A.1
  • 24
    • 0035917219 scopus 로고    scopus 로고
    • Effectiveness of planning and control systems: An empirical study of US and Japanese firms
    • Sheu, C. and Wacker, J.G., Effectiveness of planning and control systems: an empirical study of US and Japanese firms. Int. J. Prod. Res., 2001, 39(5), 887-905.
    • (2001) Int. J. Prod. Res , vol.39 , Issue.5 , pp. 887-905
    • Sheu, C.1    Wacker, J.G.2
  • 26
    • 0037063281 scopus 로고    scopus 로고
    • Planning and replanning the master production schedule under demand uncertainty
    • Tang, O. and Grubbström, R., Planning and replanning the master production schedule under demand uncertainty. Int. J. Prod. Econ., 2002, 78, 323-334.
    • (2002) Int. J. Prod. Econ , vol.78 , pp. 323-334
    • Tang, O.1    Grubbström, R.2
  • 28
    • 0021425415 scopus 로고
    • Lot sizing under uncertainty in a rolling schedule environment
    • Wemmerlöv, U. and Whybark, D., Lot sizing under uncertainty in a rolling schedule environment. Int. J. Prod. Res., 1984, 22(3), 467-484.
    • (1984) Int. J. Prod. Res , vol.22 , Issue.3 , pp. 467-484
    • Wemmerlöv, U.1    Whybark, D.2
  • 29
    • 84989412809 scopus 로고
    • Material requirements planning under uncertainty
    • Whybark, C. and Williams, J., Material requirements planning under uncertainty. Decision Sci., 1976, 7(4), 595-606.
    • (1976) Decision Sci , vol.7 , Issue.4 , pp. 595-606
    • Whybark, C.1    Williams, J.2
  • 30
    • 0003288842 scopus 로고    scopus 로고
    • Service level and safety stock based on probability
    • April
    • Wilkinson, S., Service level and safety stock based on probability. Control, 1996, April, 23-25.
    • (1996) Control , pp. 23-25
    • Wilkinson, S.1
  • 31
    • 0027612429 scopus 로고
    • Freezing the master production schedule under demand uncertainty
    • Zhao, X. and Lee, T., Freezing the master production schedule under demand uncertainty. J. Oper. Manage., 1993, 11, 185-205.
    • (1993) J. Oper. Manage , vol.11 , pp. 185-205
    • Zhao, X.1    Lee, T.2
  • 32
    • 0030382379 scopus 로고    scopus 로고
    • Capacity planning and lead time management
    • Zijm, W. and Buitenhek, R., Capacity planning and lead time management. Int. J. Prod. Econ., 1996, 46/47, 165-179.
    • (1996) Int. J. Prod. Econ , vol.46-47 , pp. 165-179
    • Zijm, W.1    Buitenhek, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.