메뉴 건너뛰기




Volumn 44, Issue 18-19, 2006, Pages 3585-3606

Master production scheduling and a comparison of material eequirements planning and cover-time planning

Author keywords

Available to promise; Cover Time Planning; Make to order; Master production scheduling; Material Requirements Planning

Indexed keywords

DECISION MAKING; ECONOMICS; ENTERPRISE RESOURCE PLANNING; INDUSTRIAL MANAGEMENT; SCHEDULING;

EID: 33746786767     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540600622498     Document Type: Conference Paper
Times cited : (11)

References (17)
  • 1
    • 0032091994 scopus 로고    scopus 로고
    • The value of rescheduling functionality within standard MRP packages
    • Euwe, M.J., Jansen, P.A.L. and Veldkamp, C.T.H., The value of rescheduling functionality within standard MRP packages. Prod. Plann. Contr., 1998, 9, 328-334.
    • (1998) Prod. Plann. Contr. , vol.9 , pp. 328-334
    • Euwe, M.J.1    Jansen, P.A.L.2    Veldkamp, C.T.H.3
  • 3
    • 33746855293 scopus 로고    scopus 로고
    • McGraw-Hill Higher Education: New York, NY
    • Jakobs, F.R. and Whybark, D.C., Why ERP?, 1999 (McGraw-Hill Higher Education: New York, NY).
    • (1999) Why ERP?
    • Jakobs, F.R.1    Whybark, D.C.2
  • 5
    • 2942658952 scopus 로고    scopus 로고
    • Hur används egentligen materialplaneringsmetoder i svensk industri?
    • Jonsson, P., Hur används egentligen materialplaneringsmetoder i svensk industri? [How are techniques for material control used in Swedish industry?]. Bättre Produktivst, 2000, 4, 14-17.
    • (2000) Bättre Produktivst , vol.4 , pp. 14-17
    • Jonsson, P.1
  • 6
    • 0036658552 scopus 로고    scopus 로고
    • The selection and application of material planning method
    • Jonsson, P. and Mattsson, S.-A., The selection and application of material planning method. Prod. Plann. Contr., 2002, 13, 438-450.
    • (2002) Prod. Plann. Contr. , vol.13 , pp. 438-450
    • Jonsson, P.1    Mattsson, S.-A.2
  • 12
    • 0036542357 scopus 로고    scopus 로고
    • Production and inventory control at ABB motors and Volvo construction equipment, two examples of MRP in practical use
    • Segerstedt, A., Production and inventory control at ABB motors and Volvo construction equipment, two examples of MRP in practical use. Prod. Plann. Contr., 2002, 13, 317-325.
    • (2002) Prod. Plann. Contr. , vol.13 , pp. 317-325
    • Segerstedt, A.1
  • 13
    • 0000170779 scopus 로고
    • A hierarchical control architecture for constant work-in-process (CONWIP) production systems
    • Spearman, M.L., Woodruff, D.L. and Hopp, W.J., A hierarchical control architecture for constant work-in-process (CONWIP) production systems. J. Manuf. Oper. Manag., 1989, 2, 141-171.
    • (1989) J. Manuf. Oper. Manag. , vol.2 , pp. 141-171
    • Spearman, M.L.1    Woodruff, D.L.2    Hopp, W.J.3
  • 14
    • 0026859945 scopus 로고
    • Push and pull production systems: Issues and comparisons
    • Spearman, M.L. and Zazanis, M.A., Push and pull production systems: issues and comparisons. Oper. Res., 1992, 40(3), 521-532.
    • (1992) Oper. Res. , vol.40 , Issue.3 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.