메뉴 건너뛰기




Volumn 46, Issue 7, 2008, Pages 1723-1744

A time-continuous analytic production model for service level, work in process, lead time and utilization

Author keywords

Backlog; Lead time; Service level; Throughput; Utilization; WIP

Indexed keywords

MATHEMATICAL MODELS; OPTIMIZATION; PROCESS CONTROL; SUPPLY CHAINS;

EID: 39449094246     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540601080498     Document Type: Article
Times cited : (9)

References (23)
  • 1
    • 33144460387 scopus 로고    scopus 로고
    • Tractable nonlinear production planning models for semiconductor wafer fabrication facilities
    • Asmundsson, J., Rardin, R.L. and Uzsoy, R., Tractable nonlinear production planning models for semiconductor wafer fabrication facilities. IEEE Trans., 2006, 19, 95-111.
    • (2006) IEEE Trans , vol.19 , pp. 95-111
    • Asmundsson, J.1    Rardin, R.L.2    Uzsoy, R.3
  • 2
    • 0032594151 scopus 로고    scopus 로고
    • Optimal variance structures and performance improvement of synchronous assembly lines
    • Erlebacher, S.J. and Singh, M.R., Optimal variance structures and performance improvement of synchronous assembly lines. Oper. Res., 1999, 47, 601-618.
    • (1999) Oper. Res , vol.47 , pp. 601-618
    • Erlebacher, S.J.1    Singh, M.R.2
  • 3
    • 0022741221 scopus 로고
    • A tactical planning model for a job shop
    • Graves, S.C., A tactical planning model for a job shop. Oper. Res., 1986, 34, 522-533.
    • (1986) Oper. Res , vol.34 , pp. 522-533
    • Graves, S.C.1
  • 4
    • 0034275944 scopus 로고    scopus 로고
    • Quoting manufacturing due dates subject to a service level constraint
    • Hopp, W.J. and Roof Sturgis, ML., Quoting manufacturing due dates subject to a service level constraint. HE Trans., 2000, 32, 771-784.
    • (2000) HE Trans , vol.32 , pp. 771-784
    • Hopp, W.J.1    Roof Sturgis, M.L.2
  • 6
    • 0025437152 scopus 로고
    • Practical strategies for lead time reduction
    • Hopp, W.J., Spearman, MVL. and Woodruff, D.L., Practical strategies for lead time reduction. Manuf Rev., 1990, 3, 78-84.
    • (1990) Manuf Rev , vol.3 , pp. 78-84
    • Hopp, W.J.1    Spearman, M.V.L.2    Woodruff, D.L.3
  • 7
    • 1442337445 scopus 로고    scopus 로고
    • Discussion of the standard processing time
    • Jodlbauer, H., Discussion of the standard processing time. Int. J. Prod. Res., 2004, 42, 1471-1479.
    • (2004) Int. J. Prod. Res , vol.42 , pp. 1471-1479
    • Jodlbauer, H.1
  • 8
    • 31444443985 scopus 로고    scopus 로고
    • Range, work in progress and utilization
    • Jodlbauer, H., Range, work in progress and utilization. Int. J. Prod. Res., 2005, 43, 4771-4786.
    • (2005) Int. J. Prod. Res , vol.43 , pp. 4771-4786
    • Jodlbauer, H.1
  • 9
    • 39449119610 scopus 로고    scopus 로고
    • Service level performance of MRP, KANBAN, CONWIP and DBR due to parameter stability and environmental robustness
    • to appear
    • Jodlbauer, H. and Huber, A., Service level performance of MRP, KANBAN, CONWIP and DBR due to parameter stability and environmental robustness. Int. J. Prod. Res., 2006 (to appear).
    • (2006) Int. J. Prod. Res
    • Jodlbauer, H.1    Huber, A.2
  • 10
    • 33744974751 scopus 로고    scopus 로고
    • Little's Law in a continuous setting
    • Jodlbauer, H. and Stocher, W., Little's Law in a continuous setting. Int. J. Prod. Econ., 2006, 103, 10-16.
    • (2006) Int. J. Prod. Econ , vol.103 , pp. 10-16
    • Jodlbauer, H.1    Stocher, W.2
  • 11
    • 0023310940 scopus 로고
    • Lot sizes, lead times and in-process inventories
    • Karmarkar, U.S., Lot sizes, lead times and in-process inventories. Manage. Sci., 1987, 33, 409-418.
    • (1987) Manage. Sci , vol.33 , pp. 409-418
    • Karmarkar, U.S.1
  • 12
    • 0345872316 scopus 로고    scopus 로고
    • A strategic management system for manufacturing: Linking action to performance
    • Ketokivi, M. and Heikkilä, J., A strategic management system for manufacturing: linking action to performance. Prod. Plan. Contr., 2003, 6, 487-496.
    • (2003) Prod. Plan. Contr , vol.6 , pp. 487-496
    • Ketokivi, M.1    Heikkilä, J.2
  • 13
    • 39449093514 scopus 로고    scopus 로고
    • Little, J.D.C., A proof of the queuing formula. L = IW. Oper. Res., 1961, 9, 383-387.
    • Little, J.D.C., A proof of the queuing formula. L = IW. Oper. Res., 1961, 9, 383-387.
  • 14
    • 10744222043 scopus 로고    scopus 로고
    • Decentralized WIP-oriented manufacturing control (DEWIP)
    • Lödding, H., Yu, K-W. and Windahl, H.-P., Decentralized WIP-oriented manufacturing control (DEWIP). Prod. Plan. Contr., 2003, 14, 42-54.
    • (2003) Prod. Plan. Contr , vol.14 , pp. 42-54
    • Lödding, H.1    Yu, K.-W.2    Windahl, H.-P.3
  • 15
    • 0032210280 scopus 로고    scopus 로고
    • A note on lead time and distributional assumptions in continuous review inventory models
    • Moon, I. and Choi, S., A note on lead time and distributional assumptions in continuous review inventory models. Comput. Oper. Res., 1998, 25, 1007-1012.
    • (1998) Comput. Oper. Res , vol.25 , pp. 1007-1012
    • Moon, I.1    Choi, S.2
  • 17
    • 0030170083 scopus 로고    scopus 로고
    • Mixture inventory model with backorders and lost sales for variable lead time
    • Quyang, L., Yeh, N. and Wu, K., Mixture inventory model with backorders and lost sales for variable lead time. J. Oper. Res. Soc., 1996, 47, 829-832.
    • (1996) J. Oper. Res. Soc , vol.47 , pp. 829-832
    • Quyang, L.1    Yeh, N.2    Wu, K.3
  • 18
    • 0001598716 scopus 로고
    • Finite moments for inventory processes
    • Sigman, K. and Yao, C., Finite moments for inventory processes. Ann. Appl. Probab., 1993, 3, 765-778.
    • (1993) Ann. Appl. Probab , vol.3 , pp. 765-778
    • Sigman, K.1    Yao, C.2
  • 20
    • 0032630294 scopus 로고    scopus 로고
    • Optimal lead time policies
    • Spearman, M.L. and Zhang, R.Q., Optimal lead time policies. Manage. Sci., 1999, 45, 290-295.
    • (1999) Manage. Sci , vol.45 , pp. 290-295
    • Spearman, M.L.1    Zhang, R.Q.2
  • 21
    • 9544257295 scopus 로고    scopus 로고
    • Comparing CONWIP, synchronized CONWIP, and KANBAB in complex supply chains
    • Takahashi, K. and Hirotani, D., Comparing CONWIP, synchronized CONWIP, and KANBAB in complex supply chains. Int. J. Prod. Econ., 2005, 93-94, 25-40.
    • (2005) Int. J. Prod. Econ , vol.93-94 , pp. 25-40
    • Takahashi, K.1    Hirotani, D.2
  • 22
    • 29644435336 scopus 로고    scopus 로고
    • towards the holistic configuration of PPC systems
    • Stumbling blocks of PPC
    • Wiendahl, H.H., Von Cieminski, G. and Wiendahl, H.P., Stumbling blocks of PPC: towards the holistic configuration of PPC systems. J. Prod. Contr., 2005, 16, 634-651.
    • (2005) J. Prod. Contr , vol.16 , pp. 634-651
    • Wiendahl, H.H.1    Von Cieminski, G.2    Wiendahl, H.P.3
  • 23
    • 0002274219 scopus 로고
    • Input/output control a real handle on lead time
    • Wight, O., Input/output control a real handle on lead time. Prod. Invent. Manage. J., 1970, 11, 9-31.
    • (1970) Prod. Invent. Manage. J , vol.11 , pp. 9-31
    • Wight, O.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.