-
1
-
-
33144460387
-
Tractable nonlinear production planning models for semiconductor wafer fabrication facilities
-
Asmundsson, J., Rardin, R.L. and Uzsoy, R., Tractable nonlinear production planning models for semiconductor wafer fabrication facilities. IEEE Trans., 2006, 19, 95-111.
-
(2006)
IEEE Trans
, vol.19
, pp. 95-111
-
-
Asmundsson, J.1
Rardin, R.L.2
Uzsoy, R.3
-
2
-
-
0032594151
-
Optimal variance structures and performance improvement of synchronous assembly lines
-
Erlebacher, S.J. and Singh, M.R., Optimal variance structures and performance improvement of synchronous assembly lines. Oper. Res., 1999, 47, 601-618.
-
(1999)
Oper. Res
, vol.47
, pp. 601-618
-
-
Erlebacher, S.J.1
Singh, M.R.2
-
3
-
-
0022741221
-
A tactical planning model for a job shop
-
Graves, S.C., A tactical planning model for a job shop. Oper. Res., 1986, 34, 522-533.
-
(1986)
Oper. Res
, vol.34
, pp. 522-533
-
-
Graves, S.C.1
-
4
-
-
0034275944
-
Quoting manufacturing due dates subject to a service level constraint
-
Hopp, W.J. and Roof Sturgis, ML., Quoting manufacturing due dates subject to a service level constraint. HE Trans., 2000, 32, 771-784.
-
(2000)
HE Trans
, vol.32
, pp. 771-784
-
-
Hopp, W.J.1
Roof Sturgis, M.L.2
-
6
-
-
0025437152
-
Practical strategies for lead time reduction
-
Hopp, W.J., Spearman, MVL. and Woodruff, D.L., Practical strategies for lead time reduction. Manuf Rev., 1990, 3, 78-84.
-
(1990)
Manuf Rev
, vol.3
, pp. 78-84
-
-
Hopp, W.J.1
Spearman, M.V.L.2
Woodruff, D.L.3
-
7
-
-
1442337445
-
Discussion of the standard processing time
-
Jodlbauer, H., Discussion of the standard processing time. Int. J. Prod. Res., 2004, 42, 1471-1479.
-
(2004)
Int. J. Prod. Res
, vol.42
, pp. 1471-1479
-
-
Jodlbauer, H.1
-
8
-
-
31444443985
-
Range, work in progress and utilization
-
Jodlbauer, H., Range, work in progress and utilization. Int. J. Prod. Res., 2005, 43, 4771-4786.
-
(2005)
Int. J. Prod. Res
, vol.43
, pp. 4771-4786
-
-
Jodlbauer, H.1
-
9
-
-
39449119610
-
Service level performance of MRP, KANBAN, CONWIP and DBR due to parameter stability and environmental robustness
-
to appear
-
Jodlbauer, H. and Huber, A., Service level performance of MRP, KANBAN, CONWIP and DBR due to parameter stability and environmental robustness. Int. J. Prod. Res., 2006 (to appear).
-
(2006)
Int. J. Prod. Res
-
-
Jodlbauer, H.1
Huber, A.2
-
10
-
-
33744974751
-
Little's Law in a continuous setting
-
Jodlbauer, H. and Stocher, W., Little's Law in a continuous setting. Int. J. Prod. Econ., 2006, 103, 10-16.
-
(2006)
Int. J. Prod. Econ
, vol.103
, pp. 10-16
-
-
Jodlbauer, H.1
Stocher, W.2
-
11
-
-
0023310940
-
Lot sizes, lead times and in-process inventories
-
Karmarkar, U.S., Lot sizes, lead times and in-process inventories. Manage. Sci., 1987, 33, 409-418.
-
(1987)
Manage. Sci
, vol.33
, pp. 409-418
-
-
Karmarkar, U.S.1
-
12
-
-
0345872316
-
A strategic management system for manufacturing: Linking action to performance
-
Ketokivi, M. and Heikkilä, J., A strategic management system for manufacturing: linking action to performance. Prod. Plan. Contr., 2003, 6, 487-496.
-
(2003)
Prod. Plan. Contr
, vol.6
, pp. 487-496
-
-
Ketokivi, M.1
Heikkilä, J.2
-
13
-
-
39449093514
-
-
Little, J.D.C., A proof of the queuing formula. L = IW. Oper. Res., 1961, 9, 383-387.
-
Little, J.D.C., A proof of the queuing formula. L = IW. Oper. Res., 1961, 9, 383-387.
-
-
-
-
14
-
-
10744222043
-
Decentralized WIP-oriented manufacturing control (DEWIP)
-
Lödding, H., Yu, K-W. and Windahl, H.-P., Decentralized WIP-oriented manufacturing control (DEWIP). Prod. Plan. Contr., 2003, 14, 42-54.
-
(2003)
Prod. Plan. Contr
, vol.14
, pp. 42-54
-
-
Lödding, H.1
Yu, K.-W.2
Windahl, H.-P.3
-
15
-
-
0032210280
-
A note on lead time and distributional assumptions in continuous review inventory models
-
Moon, I. and Choi, S., A note on lead time and distributional assumptions in continuous review inventory models. Comput. Oper. Res., 1998, 25, 1007-1012.
-
(1998)
Comput. Oper. Res
, vol.25
, pp. 1007-1012
-
-
Moon, I.1
Choi, S.2
-
16
-
-
0011662821
-
-
Springer: Berlin
-
Nyhuis, P. and Wiendahl, H.P., Logistische Kennlinien, Grundlagen, Werkzeuge und Anwendungen, 1999 (Springer: Berlin).
-
(1999)
Logistische Kennlinien, Grundlagen, Werkzeuge und Anwendungen
-
-
Nyhuis, P.1
Wiendahl, H.P.2
-
17
-
-
0030170083
-
Mixture inventory model with backorders and lost sales for variable lead time
-
Quyang, L., Yeh, N. and Wu, K., Mixture inventory model with backorders and lost sales for variable lead time. J. Oper. Res. Soc., 1996, 47, 829-832.
-
(1996)
J. Oper. Res. Soc
, vol.47
, pp. 829-832
-
-
Quyang, L.1
Yeh, N.2
Wu, K.3
-
18
-
-
0001598716
-
Finite moments for inventory processes
-
Sigman, K. and Yao, C., Finite moments for inventory processes. Ann. Appl. Probab., 1993, 3, 765-778.
-
(1993)
Ann. Appl. Probab
, vol.3
, pp. 765-778
-
-
Sigman, K.1
Yao, C.2
-
19
-
-
0025430443
-
a pull alternative to kanban
-
CONWIP
-
Spearman, M.L., Woodruff, D.L. and Hopp, W.J., CONWIP: a pull alternative to kanban. Int. J. Prod. Res., 1990, 28, 879-894.
-
(1990)
Int. J. Prod. Res
, vol.28
, pp. 879-894
-
-
Spearman, M.L.1
Woodruff, D.L.2
Hopp, W.J.3
-
20
-
-
0032630294
-
Optimal lead time policies
-
Spearman, M.L. and Zhang, R.Q., Optimal lead time policies. Manage. Sci., 1999, 45, 290-295.
-
(1999)
Manage. Sci
, vol.45
, pp. 290-295
-
-
Spearman, M.L.1
Zhang, R.Q.2
-
21
-
-
9544257295
-
Comparing CONWIP, synchronized CONWIP, and KANBAB in complex supply chains
-
Takahashi, K. and Hirotani, D., Comparing CONWIP, synchronized CONWIP, and KANBAB in complex supply chains. Int. J. Prod. Econ., 2005, 93-94, 25-40.
-
(2005)
Int. J. Prod. Econ
, vol.93-94
, pp. 25-40
-
-
Takahashi, K.1
Hirotani, D.2
-
22
-
-
29644435336
-
towards the holistic configuration of PPC systems
-
Stumbling blocks of PPC
-
Wiendahl, H.H., Von Cieminski, G. and Wiendahl, H.P., Stumbling blocks of PPC: towards the holistic configuration of PPC systems. J. Prod. Contr., 2005, 16, 634-651.
-
(2005)
J. Prod. Contr
, vol.16
, pp. 634-651
-
-
Wiendahl, H.H.1
Von Cieminski, G.2
Wiendahl, H.P.3
-
23
-
-
0002274219
-
Input/output control a real handle on lead time
-
Wight, O., Input/output control a real handle on lead time. Prod. Invent. Manage. J., 1970, 11, 9-31.
-
(1970)
Prod. Invent. Manage. J
, vol.11
, pp. 9-31
-
-
Wight, O.1
|