메뉴 건너뛰기




Volumn 43, Issue 22, 2005, Pages 4771-4786

Range, work in progress and utilization

Author keywords

Inventory; Lead time; Range; Utilization; Work in progress

Indexed keywords

INVENTORY CONTROL; PROCESS CONTROL; QUEUEING NETWORKS;

EID: 31444443985     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540500137555     Document Type: Article
Times cited : (6)

References (14)
  • 2
    • 3042555628 scopus 로고    scopus 로고
    • Modeling supply networks and business cycles as unstable transport phenomena
    • Helbing, D., Modeling supply networks and business cycles as unstable transport phenomena. New J. Phys., 2003, 5, 90.1-90.28.
    • (2003) New J. Phys. , vol.5
    • Helbing, D.1
  • 3
    • 1442337445 scopus 로고    scopus 로고
    • Discussion of the standard processing time
    • Jodlbauer, H., Discussion of the standard processing time. Int. J. Prod. Res., 2004, 42(7), 1471-1479.
    • (2004) Int. J. Prod. Res. , vol.42 , Issue.7 , pp. 1471-1479
    • Jodlbauer, H.1
  • 4
    • 10444251003 scopus 로고    scopus 로고
    • Definition and properties of the input-weighted average lead-time
    • Jodlbauer, H., Definition and properties of the input-weighted average lead-time. Eur. J. Operat. Res., 2005, 164, 354-357.
    • (2005) Eur. J. Operat. Res. , vol.164 , pp. 354-357
    • Jodlbauer, H.1
  • 5
    • 0023310940 scopus 로고
    • Lot sizes, lead times and in-process inventories
    • Karmarkar, U.S., Lot sizes, lead times and in-process inventories. Manage. Sci., 1987, 33, 409-418.
    • (1987) Manage. Sci. , vol.33 , pp. 409-418
    • Karmarkar, U.S.1
  • 6
    • 0000861722 scopus 로고
    • A proof of the queuing formula L = 1W
    • Little, J.D.C., A proof of the queuing formula L = 1W. Operat. Res., 1961, 9, 383-387.
    • (1961) Operat. Res. , vol.9 , pp. 383-387
    • Little, J.D.C.1
  • 7
    • 10744222043 scopus 로고    scopus 로고
    • Decentralized WIP-oriented manufacturing control (DEWIP)
    • Lödding, H., Yu, K.-W. and Wiendahl, H.-P., Decentralized WIP-oriented manufacturing control (DEWIP). Prod. Plan. Cont., 2003, 14, 42-54.
    • (2003) Prod. Plan. Cont. , vol.14 , pp. 42-54
    • Lödding, H.1    Yu, K.-W.2    Wiendahl, H.-P.3
  • 8
    • 0003449926 scopus 로고
    • Industrial Engineering and Management Press: Norcross, GA
    • Monden, Y., Toyota Production System, 1993 (Industrial Engineering and Management Press: Norcross, GA).
    • (1993) Toyota Production System
    • Monden, Y.1
  • 10
    • 0001598716 scopus 로고
    • Finite moments for inventory processes
    • Sigman, K. and Yao, C., Finite moments for inventory processes. Ann. Appl. Prob., 1993, 3, 765-778.
    • (1993) Ann. Appl. Prob. , vol.3 , pp. 765-778
    • Sigman, K.1    Yao, C.2
  • 12
    • 31444442366 scopus 로고
    • Push and pull production systems
    • Spearman, M.L. and Zananis, M.A., Push and pull production systems. Operat. Res., 1992, 40, 945-948.
    • (1992) Operat. Res. , vol.40 , pp. 945-948
    • Spearman, M.L.1    Zananis, M.A.2
  • 14
    • 0030382379 scopus 로고    scopus 로고
    • Capacity planning and lead time management
    • Zijm, W.H.M. and Buitenhek, R., Capacity planning and lead time management. Int. J. Prod. Econ., 1996, 46-47, 165-179.
    • (1996) Int. J. Prod. Econ. , vol.46-47 , pp. 165-179
    • Zijm, W.H.M.1    Buitenhek, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.