메뉴 건너뛰기




Volumn 105, Issue 2, 2007, Pages 591-606

Evaluating alternative capacity strategies in semiconductor manufacturing under uncertain demand and price scenarios

Author keywords

Capacity planning and investment; Capacity strategy; Geometric Brownian motion; Manufacturing cost; Real options; Semiconductor manufacturing

Indexed keywords

BROWNIAN MOVEMENT; COMPETITIVE INTELLIGENCE; COMPUTER SIMULATION; DATA REDUCTION; INDUSTRIAL PLANTS; INVESTMENTS; PRODUCTION ENGINEERING; STRATEGIC PLANNING;

EID: 37449014988     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2006.05.006     Document Type: Article
Times cited : (78)

References (20)
  • 1
    • 37949045562 scopus 로고    scopus 로고
    • Ahmed, S., 2002. Semiconductor tool planning via multi-stage stochastic programming. In: Proceeding of the 2002 International Conference on Modeling and Analysis of Semiconductor Manufacturing, Tempe, Arizona, USA, pp. 153-157.
  • 3
    • 85015692260 scopus 로고
    • The pricing of options and corporate liabilities
    • Black F., and Scholes M. The pricing of options and corporate liabilities. The Journal of Political Economy 81 3 (1973) 637-654
    • (1973) The Journal of Political Economy , vol.81 , Issue.3 , pp. 637-654
    • Black, F.1    Scholes, M.2
  • 4
    • 0036869938 scopus 로고    scopus 로고
    • Economic analysis and optimization of tool portfolio in semiconductor manufacturing
    • Chou Y.-C., and Wu C.-S. Economic analysis and optimization of tool portfolio in semiconductor manufacturing. IEEE Transactions on Semiconductor Manufacturing 15 4 (2002) 447-453
    • (2002) IEEE Transactions on Semiconductor Manufacturing , vol.15 , Issue.4 , pp. 447-453
    • Chou, Y.-C.1    Wu, C.-S.2
  • 5
    • 0036468406 scopus 로고    scopus 로고
    • Semiconductor capacity planning: Stochastic modeling and computational studies
    • Christie M.E.R., and Wu D. Semiconductor capacity planning: Stochastic modeling and computational studies. IIE Transactions 34 (2002) 131-143
    • (2002) IIE Transactions , vol.34 , pp. 131-143
    • Christie, M.E.R.1    Wu, D.2
  • 7
    • 29344438380 scopus 로고    scopus 로고
    • On bullwhip in supply chains-Historical review, present practice and expected future impact
    • Geary S., Disney S.M., and Towill D.R. On bullwhip in supply chains-Historical review, present practice and expected future impact. International Journal of Production Economics 101 1 (2006) 2-18
    • (2006) International Journal of Production Economics , vol.101 , Issue.1 , pp. 2-18
    • Geary, S.1    Disney, S.M.2    Towill, D.R.3
  • 9
    • 37949015344 scopus 로고    scopus 로고
    • International SEMATECH, 2002. Industry Economic Model.
  • 10
    • 37949048624 scopus 로고    scopus 로고
    • Jarrow, A.R., Rudd, A., 1983. Option pricing (Irwin).
  • 11
    • 37949051376 scopus 로고    scopus 로고
    • Karabuk, S., Wu, S.D., 2001. Coordinating strategic capacity planning in the semiconductor industry. Technical Report 99T-11, Department of IMSE, Lehigh University.
  • 12
    • 37949027934 scopus 로고    scopus 로고
    • Liang, Y.-Y., Chou, Y.-C., 2003. Option-based capacity planning for semiconductor manufacturing. In: IEEE International Symposium on Semiconductor Manufacturing, San Jose, California, USA, September 30-October 2, pp. 77-80.
  • 13
    • 0004281114 scopus 로고    scopus 로고
    • Oxford University Press, Oxford (Chapter 11)
    • Luenberger D.G. Investment Science (1998), Oxford University Press, Oxford (Chapter 11)
    • (1998) Investment Science
    • Luenberger, D.G.1
  • 14
    • 0020183161 scopus 로고
    • Operations research and capacity expansion problems: A review
    • Luss H. Operations research and capacity expansion problems: A review. Operations Research 30 5 (1982) 907-947
    • (1982) Operations Research , vol.30 , Issue.5 , pp. 907-947
    • Luss, H.1
  • 15
    • 28444461369 scopus 로고    scopus 로고
    • A simulation-based evaluation of the cost of cycle time reduction in Agere Systems wafer fabrication facility-A case study
    • Nazzal D., Mollaghasemi M., and Anderson D. A simulation-based evaluation of the cost of cycle time reduction in Agere Systems wafer fabrication facility-A case study. International Journal of Production Economics 100 1 (2006) 300-313
    • (2006) International Journal of Production Economics , vol.100 , Issue.1 , pp. 300-313
    • Nazzal, D.1    Mollaghasemi, M.2    Anderson, D.3
  • 16
    • 37949028327 scopus 로고    scopus 로고
    • Neudorff, J., 1999. Static capacity analysis using Microsoft Visual Basic. In: International Conference on Semiconductor Manufacturing Operational Modeling and Simulation, San Francisco, pp. 207-212.
  • 17
    • 0033889013 scopus 로고    scopus 로고
    • Tool capacity planning for semiconductor fabrication facilities under demand uncertainty
    • Swaminathan J.M. Tool capacity planning for semiconductor fabrication facilities under demand uncertainty. European Journal of Operations Research 120 (2000) 545-558
    • (2000) European Journal of Operations Research , vol.120 , pp. 545-558
    • Swaminathan, J.M.1
  • 19
    • 0030395447 scopus 로고    scopus 로고
    • Witte, J.D., 1996. Using static capacity modelling techniques in semiconductor manufacturing. In: IEEE/SEMI Advanced Semiconductor Manufacturing Conference and Workshop, pp. 31-35.
  • 20
    • 37949019326 scopus 로고    scopus 로고
    • Wu, W.-F., Yang, J.-L., Liao, J.-T., 1998. Static capacity checking system with cycle time considered. In: The Seventh International Symposium on Semiconductor Manufacturing, pp. 307-310.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.