메뉴 건너뛰기




Volumn 111, Issue 2, 2008, Pages 793-801

Customer driven production planning

Author keywords

Constant work in process (CONWIP); Make to order (MTO); Market driven production planning

Indexed keywords

CUSTOMER SATISFACTION; ECONOMIC ANALYSIS; STRATEGIC PLANNING;

EID: 37349074744     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2007.03.011     Document Type: Article
Times cited : (32)

References (22)
  • 1
    • 0035501857 scopus 로고    scopus 로고
    • Analytic model for when and how to expedite in make-to-orders systems
    • Arslan H., Ayhan H., and Olsen T.L. Analytic model for when and how to expedite in make-to-orders systems. IIE Transactions 33 (2001) 1019-1029
    • (2001) IIE Transactions , vol.33 , pp. 1019-1029
    • Arslan, H.1    Ayhan, H.2    Olsen, T.L.3
  • 3
    • 9644274216 scopus 로고    scopus 로고
    • Capacity competition of make-to-order firms
    • Chen H., and Wan Y.-W. Capacity competition of make-to-order firms. Operations Research Letters 33 2 (2005) 187-194
    • (2005) Operations Research Letters , vol.33 , Issue.2 , pp. 187-194
    • Chen, H.1    Wan, Y.-W.2
  • 4
    • 31444441387 scopus 로고    scopus 로고
    • Market-driven production lot-sizes and scheduling with finite capacity for a deteriorating item
    • Chen J.M., and Chen L.T. Market-driven production lot-sizes and scheduling with finite capacity for a deteriorating item. Production Planning & Control 17 1 (2006) 44-53
    • (2006) Production Planning & Control , vol.17 , Issue.1 , pp. 44-53
    • Chen, J.M.1    Chen, L.T.2
  • 5
    • 0028547827 scopus 로고
    • A simple release policy for networks of queues with controllable inputs
    • Duenyas I. A simple release policy for networks of queues with controllable inputs. Operations Research 42/6 (1993) 1162-1171
    • (1993) Operations Research , vol.42-6 , pp. 1162-1171
    • Duenyas, I.1
  • 6
    • 0033874529 scopus 로고    scopus 로고
    • Performance evaluation and design of a CONWIP system with inspections
    • Duri C., Frein Y., and Lee H.S. Performance evaluation and design of a CONWIP system with inspections. International Journal of Production Economics 64 1 (2000) 219-229
    • (2000) International Journal of Production Economics , vol.64 , Issue.1 , pp. 219-229
    • Duri, C.1    Frein, Y.2    Lee, H.S.3
  • 9
    • 0037125665 scopus 로고    scopus 로고
    • Optimal and near-optimal inventory control policies for a make-to-order inventory production system
    • He Q.M., Jewkes E.M., and Buzacott J. Optimal and near-optimal inventory control policies for a make-to-order inventory production system. European Journal of Operational Research 141 1 (2002) 113-132
    • (2002) European Journal of Operational Research , vol.141 , Issue.1 , pp. 113-132
    • He, Q.M.1    Jewkes, E.M.2    Buzacott, J.3
  • 10
    • 0024961857 scopus 로고
    • Production planning systems and the applicability to make to order companies
    • Hendry L.C., and Kingsman B.G. Production planning systems and the applicability to make to order companies. European Journal of Operational Research 40 (1989) 1-15
    • (1989) European Journal of Operational Research , vol.40 , pp. 1-15
    • Hendry, L.C.1    Kingsman, B.G.2
  • 11
    • 0032046661 scopus 로고    scopus 로고
    • Setting WIP levels with statistical throughput control (STC) in CONWIP production lines
    • Hopp W.J., and Roof M.L. Setting WIP levels with statistical throughput control (STC) in CONWIP production lines. International Journal of Production Research 36 4 (1998) 867-882
    • (1998) International Journal of Production Research , vol.36 , Issue.4 , pp. 867-882
    • Hopp, W.J.1    Roof, M.L.2
  • 15
    • 0031102504 scopus 로고    scopus 로고
    • Capacity driven due date settings in make to order production systems
    • Ozdamar L., and Yazgac T. Capacity driven due date settings in make to order production systems. International Journal of Production Economics 49 (1997) 29-44
    • (1997) International Journal of Production Economics , vol.49 , pp. 29-44
    • Ozdamar, L.1    Yazgac, T.2
  • 16
    • 0037138029 scopus 로고    scopus 로고
    • Two-stage make to order remanufacturing with service-level constraints
    • Souza G.C., and Ketzenberg M.E. Two-stage make to order remanufacturing with service-level constraints. International Journal of Production Research 40 2 (2002) 477-493
    • (2002) International Journal of Production Research , vol.40 , Issue.2 , pp. 477-493
    • Souza, G.C.1    Ketzenberg, M.E.2
  • 21
    • 0029260612 scopus 로고
    • A survey of US manufacturing practices in make to order machine shops
    • Wisner J.D., and Siferd S.P. A survey of US manufacturing practices in make to order machine shops. Production and Inventory Management Journal 36 1 (1995) 1-7
    • (1995) Production and Inventory Management Journal , vol.36 , Issue.1 , pp. 1-7
    • Wisner, J.D.1    Siferd, S.P.2
  • 22
    • 0035384315 scopus 로고    scopus 로고
    • A quick response production strategy to market demand
    • Yang P.C., and Wee H.M. A quick response production strategy to market demand. Production Planning & Control 12 4 (2001) 326-334
    • (2001) Production Planning & Control , vol.12 , Issue.4 , pp. 326-334
    • Yang, P.C.1    Wee, H.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.