-
1
-
-
33745936138
-
Joint protective capacity: Methodology, sensitivity analyses, and implementation for the P856/8 factories
-
Allen, D.E., Kalir, A., Harding, E. and Kempf, K.G., Joint protective capacity: methodology, sensitivity analyses, and implementation for the P856/8 factories, in Intel Manufacturing Excellence Conference, 1999.
-
(1999)
Intel Manufacturing Excellence Conference
-
-
Allen, D.E.1
Kalir, A.2
Harding, E.3
Kempf, K.G.4
-
2
-
-
0028511861
-
Does protective capacity assist managers in competing along time-based dimensions?
-
Atwater, J.B. and Satya, S.C., Does protective capacity assist managers in competing along time-based dimensions? Prod. Invent. Mgmt J., 1994, 35.
-
(1994)
Prod. Invent. Mgmt J
, vol.35
-
-
Atwater, J.B.1
Satya, S.C.2
-
3
-
-
0036610796
-
Designing unbalanced lines-Understanding protective capacity and protective inventory
-
Blackstone, J.H. and Cox, J., Designing unbalanced lines-Understanding protective capacity and protective inventory. Prod. Plann. Contr., 2002, 13.
-
(2002)
Prod. Plann. Contr
, vol.13
-
-
Blackstone, J.H.1
Cox, J.2
-
5
-
-
33745954124
-
Joint protective capacity: A novel planning metric and methodology
-
Carson, M., Chakraborty, A., Cunningham, S.P., Gin, M., Kempf, KG., McBride, E., Mitlehner, M. and Swihart, M., Joint protective capacity: a novel planning metric and methodology, in Intel Manufacturing Excellence Conference, 1998.
-
(1998)
Intel Manufacturing Excellence Conference
-
-
Carson, M.1
Chakraborty, A.2
Cunningham, S.P.3
Gin, M.4
Kempf, K.G.5
McBride, E.6
Mitlehner, M.7
Swihart, M.8
-
6
-
-
0035900039
-
Protective capacity positioning: Impact on manufacturing cell performance
-
Craighead, C.W., Patterson, J.W. and Fredendall, L.D., Protective capacity positioning: impact on manufacturing cell performance. Eur. J. Oper. Res., 2001, 134.
-
(2001)
Eur. J. Oper. Res
, vol.134
-
-
Craighead, C.W.1
Patterson, J.W.2
Fredendall, L.D.3
-
7
-
-
33745953127
-
Lost utilization-Constraint performance management
-
Devlin, P., Thielemier, C. and Wehrlin, D.E., Lost utilization-Constraint performance management, in 12th IEEE/SEMI International Symposium on Semiconductor Manufacturing, 2003.
-
(2003)
12th IEEE/SEMI International Symposium on Semiconductor Manufacturing
-
-
Devlin, P.1
Thielemier, C.2
Wehrlin, D.E.3
-
8
-
-
0004034817
-
-
North River Press: Croton-on-Hudson, NY
-
Goldratt, E.M., Theory of Constraints, 1990 (North River Press: Croton-on-Hudson, NY).
-
(1990)
Theory of Constraints
-
-
Goldratt, E.M.1
-
11
-
-
0033888501
-
A study on the effect of the extent and location of protective capacity in flow systems
-
Kadipasaoglu, S.N., Xiang, W., Hurley, S.F. and Khumawala, B.M., A study on the effect of the extent and location of protective capacity in flow systems. Int. J. Prod. Econ., 2000, 63.
-
(2000)
Int. J. Prod. Econ
, vol.63
-
-
Kadipasaoglu, S.N.1
Xiang, W.2
Hurley, S.F.3
Khumawala, B.M.4
-
12
-
-
1142280535
-
Using the theory of constraints' production application in a semiconductor fab with a reentrant bottleneck
-
Kayton, D., Using the theory of constraints' production application in a semiconductor fab with a reentrant bottleneck, in IEEE/CPMT International Electronics Manufacturing Technology Symposium, 1998.
-
(1998)
IEEE/CPMT International Electronics Manufacturing Technology Symposium
-
-
Kayton, D.1
-
13
-
-
84958185021
-
Using natural statistics concept to develop a capacity model that can solve tool-operation multi-to-multi relation of IC FAB
-
Ko, L.J. and Wang, I., Using natural statistics concept to develop a capacity model that can solve tool-operation multi-to-multi relation of IC FAB, in Semiconductor Manufacturing Technology Workshop, 2002.
-
(2002)
Semiconductor Manufacturing Technology Workshop
-
-
Ko, L.J.1
Wang, I.2
-
15
-
-
0032284159
-
A rapid modeling technique for measurable improvements in factory performance
-
Peikert, J.T. and Brown, S., A rapid modeling technique for measurable improvements in factory performance, in Winter Simulation Conference, 1998.
-
(1998)
Winter Simulation Conference
-
-
Peikert, J.T.1
Brown, S.2
-
16
-
-
0032266431
-
Implementing the theory of constraints philosophy in highly reentrant systems
-
Rippenhagen, C. and Krishnaswamy, S., Implementing the theory of constraints philosophy in highly reentrant systems, in Winter Simulation Conference, 1998.
-
(1998)
Winter Simulation Conference
-
-
Rippenhagen, C.1
Krishnaswamy, S.2
-
19
-
-
36248998707
-
-
SEMI E10, Standard for definition and measurement of equipment reliability, availability, and maintainability, in Semiconductor Equipment and Materials International (SEMI), 1996.
-
SEMI E10, Standard for definition and measurement of equipment reliability, availability, and maintainability, in Semiconductor Equipment and Materials International (SEMI), 1996.
-
-
-
-
20
-
-
0022029167
-
Continuous excess capacity versus intermittent extra capacity to control average queue size in a random environment
-
South, J.B., Continuous excess capacity versus intermittent extra capacity to control average queue size in a random environment. Prod. Invent. Mgmt J., 1985, 26.
-
(1985)
Prod. Invent. Mgmt J
, vol.26
-
-
South, J.B.1
-
21
-
-
0024128544
-
Excess capacity versus finished goods safety stock
-
South, J.B. and Hixson, R., Excess capacity versus finished goods safety stock. Prod. Invent. Mgmt J., 1988, 29.
-
(1988)
Prod. Invent. Mgmt J
, vol.29
-
-
South, J.B.1
Hixson, R.2
-
22
-
-
27844453227
-
Model to determine the backup capacity of a wafer foundry
-
Tu, Y.M., Chao, Y.H., Chang, S.H. and You, H.C., Model to determine the backup capacity of a wafer foundry. Int. J. Prod. Res., 2005, 43.
-
(2005)
Int. J. Prod. Res
, vol.43
-
-
Tu, Y.M.1
Chao, Y.H.2
Chang, S.H.3
You, H.C.4
-
24
-
-
36248990583
-
Doing by virtual experimenting: Simulation-based scheduling system in semiconductor manufacturing
-
March
-
Zhang, M.T. and Wang, Y., Doing by virtual experimenting: simulation-based scheduling system in semiconductor manufacturing. Ind. Engrs, 2005, March.
-
(2005)
Ind. Engrs
-
-
Zhang, M.T.1
Wang, Y.2
|