-
1
-
-
15744377510
-
Predictability of hierarchical, heterarchical, and holonic control
-
Leuven, Belgium, September 22-24
-
Bongaerts L., Indrayadi Y., Van Brussel H., and Valckenaers P. Predictability of hierarchical, heterarchical, and holonic control. Proceedings of the 2nd International Workshop on Intelligent Manufacturing Systems. Leuven, Belgium, September 22-24 (1999) 167-176
-
(1999)
Proceedings of the 2nd International Workshop on Intelligent Manufacturing Systems
, pp. 167-176
-
-
Bongaerts, L.1
Indrayadi, Y.2
Van Brussel, H.3
Valckenaers, P.4
-
2
-
-
0034298926
-
An experimental Benchmarking of two multi-agent systems for production scheduling and control
-
Cavalieri S., Taisch M., Garetti M., and Macchi M. An experimental Benchmarking of two multi-agent systems for production scheduling and control. Computers in Industry 43 (2000) 139-152
-
(2000)
Computers in Industry
, vol.43
, pp. 139-152
-
-
Cavalieri, S.1
Taisch, M.2
Garetti, M.3
Macchi, M.4
-
3
-
-
0029254356
-
Robust scheduling to hedge against processing time uncertainty in single stage production
-
Daniels R., and Kouvelis P. Robust scheduling to hedge against processing time uncertainty in single stage production. Management Science 41 2 (1995) 363-376
-
(1995)
Management Science
, vol.41
, Issue.2
, pp. 363-376
-
-
Daniels, R.1
Kouvelis, P.2
-
4
-
-
34447309909
-
-
M.T. Jensen, Robust and flexible scheduling with evolutionary computation, Ph.D. Thesis, Department of Computer Science, University of Aarhus, Denmark, 2001.
-
-
-
-
5
-
-
0026494564
-
The balanced scorecard-measures that drive performance
-
Kaplan R.S., and Norton D.P. The balanced scorecard-measures that drive performance. Harvard Business Review (1992) 71-79
-
(1992)
Harvard Business Review
, pp. 71-79
-
-
Kaplan, R.S.1
Norton, D.P.2
-
7
-
-
34447303435
-
-
IMS-NoE, Network of Excellence on Intelligent Manufacturing Systems, Project Reference IST-2001-65001 IMS-02006, http://www.ims-noe.org (2003).
-
-
-
-
8
-
-
34447305066
-
-
S. Gören, Robustness and Stability for Scheduling Policies in a Single Machine Environment, M.Sc. Thesis, Bilkent University, Ankara, Turkey, 2002.
-
-
-
-
11
-
-
15744381144
-
Evaluation and validation of scheduling systems: issues and trends
-
Dalmine, Italy, June 19-20
-
Terzi S., Brambilla P., and Cavalieri S. Evaluation and validation of scheduling systems: issues and trends. Proceedings of the Third International Workshop on Performance Measurement. Dalmine, Italy, June 19-20 (2003) 155-168
-
(2003)
Proceedings of the Third International Workshop on Performance Measurement
, pp. 155-168
-
-
Terzi, S.1
Brambilla, P.2
Cavalieri, S.3
-
13
-
-
0031142371
-
Identifying investment opportunities for advanced manufacturing system with comparative-integrated performance measurement
-
Kim G., Park C.S., and Yoon K.P. Identifying investment opportunities for advanced manufacturing system with comparative-integrated performance measurement. International Journal of Production Economics 50 (1997) 23-33
-
(1997)
International Journal of Production Economics
, vol.50
, pp. 23-33
-
-
Kim, G.1
Park, C.S.2
Yoon, K.P.3
-
14
-
-
34447301683
-
General concepts of a Manufacturing Systems Engineering workbench as a tool for the re-engineering of manufacturing systems
-
Browne J., and O'Sullivan D. (Eds), Chapman & Hall, London
-
Garetti M., and Bartolotta A. General concepts of a Manufacturing Systems Engineering workbench as a tool for the re-engineering of manufacturing systems. In: Browne J., and O'Sullivan D. (Eds). Re-engineering the Enterprise (1995), Chapman & Hall, London
-
(1995)
Re-engineering the Enterprise
-
-
Garetti, M.1
Bartolotta, A.2
-
15
-
-
0037297773
-
Benchmarking the performance of manufacturing control systems: design principles for a web-based simulated testbed
-
Cavalieri S., Macchi M., and Valckenaers P. Benchmarking the performance of manufacturing control systems: design principles for a web-based simulated testbed. Journal of Intelligent Manufacturing 14 1 (2003) 43-57
-
(2003)
Journal of Intelligent Manufacturing
, vol.14
, Issue.1
, pp. 43-57
-
-
Cavalieri, S.1
Macchi, M.2
Valckenaers, P.3
-
16
-
-
12444338917
-
Definition of a robustness metric for resource allocation
-
Nice, France, April 22-26
-
Ali S., Maciejewski A.A., Siegel H.J., and Kim J.-K. Definition of a robustness metric for resource allocation. Proceedings of the 17th International Parallel and Distributed Processing Symposium (IPDPS 2003). Nice, France, April 22-26 (2003)
-
(2003)
Proceedings of the 17th International Parallel and Distributed Processing Symposium (IPDPS 2003)
-
-
Ali, S.1
Maciejewski, A.A.2
Siegel, H.J.3
Kim, J.-K.4
-
17
-
-
0030555126
-
A survey and taxonomy of strategy-related performance measures for manufacturing
-
White G.P. A survey and taxonomy of strategy-related performance measures for manufacturing. International Journal of Operations & Production Management 16 3 (1996) 42-61
-
(1996)
International Journal of Operations & Production Management
, vol.16
, Issue.3
, pp. 42-61
-
-
White, G.P.1
-
19
-
-
0009433205
-
Deriving particular agile scheduling systems using the HOLOS methodology
-
Rabelo R.J., and Camarinha-Matos L.M. Deriving particular agile scheduling systems using the HOLOS methodology. Studies in Informatics and Control 5 2 (1996) 89-106
-
(1996)
Studies in Informatics and Control
, vol.5
, Issue.2
, pp. 89-106
-
-
Rabelo, R.J.1
Camarinha-Matos, L.M.2
-
20
-
-
34447326857
-
-
S.V.G. Adobe, Scalable Vector Graphics, http://www.adobe.com/svg (2003).
-
-
-
-
21
-
-
5144232431
-
Executing production schedules in the face of uncertainty: a review and some future directions
-
Aytug H., Lawley M.A., McKay K.N., Mohan S., and Uzsoy R. Executing production schedules in the face of uncertainty: a review and some future directions. European Journal of Operational Research 161 (2005) 86-110
-
(2005)
European Journal of Operational Research
, vol.161
, pp. 86-110
-
-
Aytug, H.1
Lawley, M.A.2
McKay, K.N.3
Mohan, S.4
Uzsoy, R.5
-
22
-
-
0032183949
-
Dispatching rules for stochastic finite capacity scheduling
-
Liu C.K. Dispatching rules for stochastic finite capacity scheduling. Computers & Industrial Engineering 1/2 (1998) 113-116
-
(1998)
Computers & Industrial Engineering
, vol.1-2
, pp. 113-116
-
-
Liu, C.K.1
-
23
-
-
0242703954
-
Rescheduling manufacturing systems: a framework of strategies, policies and methods
-
Vieira G.E., Herrmann J.W., and Edward L. Rescheduling manufacturing systems: a framework of strategies, policies and methods. Journal of Scheduling 6 (2003) 39-62
-
(2003)
Journal of Scheduling
, vol.6
, pp. 39-62
-
-
Vieira, G.E.1
Herrmann, J.W.2
Edward, L.3
-
24
-
-
34447337399
-
-
Van Dyke Parunak, MASCOT: A Virtual Factory for Research and Development in Manufacturing Scheduling and Control, Industrial Technology Institute-ITI Tech Memo 93-02 (1993).
-
-
-
-
25
-
-
0002679890
-
Benchmarks, testbeds, controlled experimentation, and the design of agent architectures
-
Hanks S., Pollack M.E., and Cohen P. Benchmarks, testbeds, controlled experimentation, and the design of agent architectures. AI Magazine 14 4 (1993) 17-42
-
(1993)
AI Magazine
, vol.14
, Issue.4
, pp. 17-42
-
-
Hanks, S.1
Pollack, M.E.2
Cohen, P.3
|