메뉴 건너뛰기




Volumn 58, Issue 7, 2007, Pages 656-666

A Benchmarking Service for the evaluation and comparison of scheduling techniques

Author keywords

Benchmarking; Performance measurement; Plant management; Scheduling evaluation

Indexed keywords

CONCEPTUAL MODELS; MANUFACTURING SYSTEMS CONTROL; PERFORMANCE MEASUREMENT; SCHEDULING EVALUATION;

EID: 34447307395     PISSN: 01663615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compind.2007.05.004     Document Type: Article
Times cited : (19)

References (26)
  • 2
    • 0034298926 scopus 로고    scopus 로고
    • An experimental Benchmarking of two multi-agent systems for production scheduling and control
    • Cavalieri S., Taisch M., Garetti M., and Macchi M. An experimental Benchmarking of two multi-agent systems for production scheduling and control. Computers in Industry 43 (2000) 139-152
    • (2000) Computers in Industry , vol.43 , pp. 139-152
    • Cavalieri, S.1    Taisch, M.2    Garetti, M.3    Macchi, M.4
  • 3
    • 0029254356 scopus 로고
    • Robust scheduling to hedge against processing time uncertainty in single stage production
    • Daniels R., and Kouvelis P. Robust scheduling to hedge against processing time uncertainty in single stage production. Management Science 41 2 (1995) 363-376
    • (1995) Management Science , vol.41 , Issue.2 , pp. 363-376
    • Daniels, R.1    Kouvelis, P.2
  • 4
    • 34447309909 scopus 로고    scopus 로고
    • M.T. Jensen, Robust and flexible scheduling with evolutionary computation, Ph.D. Thesis, Department of Computer Science, University of Aarhus, Denmark, 2001.
  • 5
    • 0026494564 scopus 로고
    • The balanced scorecard-measures that drive performance
    • Kaplan R.S., and Norton D.P. The balanced scorecard-measures that drive performance. Harvard Business Review (1992) 71-79
    • (1992) Harvard Business Review , pp. 71-79
    • Kaplan, R.S.1    Norton, D.P.2
  • 6
    • 0033728696 scopus 로고    scopus 로고
    • Evaluation and comparison of production schedules
    • Kempf K., Uzsoy R., Smith S., and Gary K. Evaluation and comparison of production schedules. Computers in Industry 42 (2000) 203-220
    • (2000) Computers in Industry , vol.42 , pp. 203-220
    • Kempf, K.1    Uzsoy, R.2    Smith, S.3    Gary, K.4
  • 7
    • 34447303435 scopus 로고    scopus 로고
    • IMS-NoE, Network of Excellence on Intelligent Manufacturing Systems, Project Reference IST-2001-65001 IMS-02006, http://www.ims-noe.org (2003).
  • 8
    • 34447305066 scopus 로고    scopus 로고
    • S. Gören, Robustness and Stability for Scheduling Policies in a Single Machine Environment, M.Sc. Thesis, Bilkent University, Ankara, Turkey, 2002.
  • 13
    • 0031142371 scopus 로고    scopus 로고
    • Identifying investment opportunities for advanced manufacturing system with comparative-integrated performance measurement
    • Kim G., Park C.S., and Yoon K.P. Identifying investment opportunities for advanced manufacturing system with comparative-integrated performance measurement. International Journal of Production Economics 50 (1997) 23-33
    • (1997) International Journal of Production Economics , vol.50 , pp. 23-33
    • Kim, G.1    Park, C.S.2    Yoon, K.P.3
  • 14
    • 34447301683 scopus 로고
    • General concepts of a Manufacturing Systems Engineering workbench as a tool for the re-engineering of manufacturing systems
    • Browne J., and O'Sullivan D. (Eds), Chapman & Hall, London
    • Garetti M., and Bartolotta A. General concepts of a Manufacturing Systems Engineering workbench as a tool for the re-engineering of manufacturing systems. In: Browne J., and O'Sullivan D. (Eds). Re-engineering the Enterprise (1995), Chapman & Hall, London
    • (1995) Re-engineering the Enterprise
    • Garetti, M.1    Bartolotta, A.2
  • 15
    • 0037297773 scopus 로고    scopus 로고
    • Benchmarking the performance of manufacturing control systems: design principles for a web-based simulated testbed
    • Cavalieri S., Macchi M., and Valckenaers P. Benchmarking the performance of manufacturing control systems: design principles for a web-based simulated testbed. Journal of Intelligent Manufacturing 14 1 (2003) 43-57
    • (2003) Journal of Intelligent Manufacturing , vol.14 , Issue.1 , pp. 43-57
    • Cavalieri, S.1    Macchi, M.2    Valckenaers, P.3
  • 17
    • 0030555126 scopus 로고    scopus 로고
    • A survey and taxonomy of strategy-related performance measures for manufacturing
    • White G.P. A survey and taxonomy of strategy-related performance measures for manufacturing. International Journal of Operations & Production Management 16 3 (1996) 42-61
    • (1996) International Journal of Operations & Production Management , vol.16 , Issue.3 , pp. 42-61
    • White, G.P.1
  • 19
    • 0009433205 scopus 로고    scopus 로고
    • Deriving particular agile scheduling systems using the HOLOS methodology
    • Rabelo R.J., and Camarinha-Matos L.M. Deriving particular agile scheduling systems using the HOLOS methodology. Studies in Informatics and Control 5 2 (1996) 89-106
    • (1996) Studies in Informatics and Control , vol.5 , Issue.2 , pp. 89-106
    • Rabelo, R.J.1    Camarinha-Matos, L.M.2
  • 20
    • 34447326857 scopus 로고    scopus 로고
    • S.V.G. Adobe, Scalable Vector Graphics, http://www.adobe.com/svg (2003).
  • 22
    • 0032183949 scopus 로고    scopus 로고
    • Dispatching rules for stochastic finite capacity scheduling
    • Liu C.K. Dispatching rules for stochastic finite capacity scheduling. Computers & Industrial Engineering 1/2 (1998) 113-116
    • (1998) Computers & Industrial Engineering , vol.1-2 , pp. 113-116
    • Liu, C.K.1
  • 23
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: a framework of strategies, policies and methods
    • Vieira G.E., Herrmann J.W., and Edward L. Rescheduling manufacturing systems: a framework of strategies, policies and methods. Journal of Scheduling 6 (2003) 39-62
    • (2003) Journal of Scheduling , vol.6 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Edward, L.3
  • 24
    • 34447337399 scopus 로고    scopus 로고
    • Van Dyke Parunak, MASCOT: A Virtual Factory for Research and Development in Manufacturing Scheduling and Control, Industrial Technology Institute-ITI Tech Memo 93-02 (1993).
  • 25
    • 0002679890 scopus 로고
    • Benchmarks, testbeds, controlled experimentation, and the design of agent architectures
    • Hanks S., Pollack M.E., and Cohen P. Benchmarks, testbeds, controlled experimentation, and the design of agent architectures. AI Magazine 14 4 (1993) 17-42
    • (1993) AI Magazine , vol.14 , Issue.4 , pp. 17-42
    • Hanks, S.1    Pollack, M.E.2    Cohen, P.3
  • 26
    • 33845626540 scopus 로고    scopus 로고
    • Proposal of a performance measurement system for the evaluation of scheduling solutions
    • Cavalieri S., and Terzi S. Proposal of a performance measurement system for the evaluation of scheduling solutions. International Journal of Manufacturing Technology and Management 8 1/2/3 (2006) 248-263
    • (2006) International Journal of Manufacturing Technology and Management , vol.8 , Issue.1-2 -3 , pp. 248-263
    • Cavalieri, S.1    Terzi, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.