메뉴 건너뛰기




Volumn 11, Issue 3-4, 2002, Pages 383-404

Decision support for project management using a chronographic approach

Author keywords

Chronograph; CPM; DDS; Planning; Scheduling; Time Scaled

Indexed keywords


EID: 85015594216     PISSN: 12460125     EISSN: 21167052     Source Type: Journal    
DOI: 10.3166/jds.11.383-404     Document Type: Article
Times cited : (22)

References (63)
  • 1
    • 0026896015 scopus 로고    scopus 로고
    • A Knowledge-based Decision Support System for Project Management
    • ARINZE, B., and PARTOVI, F., A Knowledge-based Decision Support System for Project Management. Computers Operations Research, 19 (5) 321–334.
    • Computers Operations Research , vol.19 , Issue.5 , pp. 321-334
    • Arinze, B.1    Partovi, F.2
  • 3
    • 0042887546 scopus 로고    scopus 로고
    • Design Aspects of an Advanced Model-Oriented DSS for Scheduling Problems in Civil Engineering
    • BARTUSCH, M., MÖHRING, R. H., and RADERMACHER, F. J., Design Aspects of an Advanced Model-Oriented DSS for Scheduling Problems in Civil Engineering. Decision Support Systems, 5321–344.
    • Decision Support Systems , vol.5 , pp. 321-344
    • Bartusch, M.1    Möhring, R.H.2    Radermacher, F.J.3
  • 8
    • 0024087561 scopus 로고
    • Explanation of Construction Engineering Knowledge in Expert Systems
    • September
    • DIEKMANN, J. E., and KRAIEM, Z., 1988. Explanation of Construction Engineering Knowledge in Expert Systems. ASCE Journal of Construction Engineering and Management, 114 (3) September:364–389.
    • (1988) ASCE Journal of Construction Engineering and Management , vol.114 , Issue.3 , pp. 364-389
    • Diekmann, J.E.1    Kraiem, Z.2
  • 10
    • 85024513610 scopus 로고    scopus 로고
    • Proceedings of the International Conference on Application of Artificial Intelligence Techniques to Civil and Structural Engineering, London, U.K.: City University
    • ECHEVERRY, D., IBBS, C. W., and KIM, S., A knowledge-based approach to support the generation of construction schedules. Proceedings of the International Conference on Application of Artificial Intelligence Techniques to Civil and Structural Engineering. pp. 59–66. London, U.K.:City University.
    • A knowledge-based approach to support the generation of construction schedules , pp. 59-66
    • Echeverry, D.1    Ibbs, C.W.2    Kim, S.3
  • 14
    • 0000968059 scopus 로고    scopus 로고
    • A simple Algorithm for finding maximum network flows and an application to the Hitchcok problem
    • FORD, L. R., and ET FULKERSON, D. R., A simple Algorithm for finding maximum network flows and an application to the Hitchcok problem. Journal Canadien des Mathématiques, 9210–218.
    • Journal Canadien des Mathématiques , vol.9 , pp. 210-218
    • Ford, L.R.1    Et Fulkerson, D.R.2
  • 15
    • 84982522109 scopus 로고    scopus 로고
    • ISIS–a knowledge-based system for factory scheduling
    • FOX, M. S., and SMITH, S. F., ISIS–a knowledge-based system for factory scheduling. Expert Systems, 1 (1) 25–47.
    • Expert Systems , vol.1 , Issue.1 , pp. 25-47
    • Fox, M.S.1    Smith, S.F.2
  • 18
    • 0001287631 scopus 로고
    • Expected Critical Path lenghts in Pert Networks
    • FULKERSON, D. R., 1962. Expected Critical Path lenghts in Pert Networks. Operations Research, 10:808–817.
    • (1962) Operations Research , vol.10 , pp. 808-817
    • Fulkerson, D.R.1
  • 19
    • 0023346288 scopus 로고
    • The Nature and Evaluation of Commercial Expert System Building Tools
    • May
    • GEVARTER, W. B., 1987. The Nature and Evaluation of Commercial Expert System Building Tools. Computer Journal, May:24–41.
    • (1987) Computer Journal , pp. 24-41
    • Gevarter, W.B.1
  • 20
    • 85024564227 scopus 로고    scopus 로고
    • Quelques problèmes méthodologiques actuels en gestion de projets
    • GIARD, V., Quelques problèmes méthodologiques actuels en gestion de projets. Revue française de gestion industrielle, 2/199151–68.
    • Revue française de gestion industrielle , vol.2 , pp. 51-68
    • Giard, V.1
  • 21
  • 22
    • 0000031487 scopus 로고
    • Attempts to validate certain PERT statistics
    • GRUBBS, F. F., 1962. Attempts to validate certain PERT statistics. Operations Research, 10:912–915.
    • (1962) Operations Research , vol.10 , pp. 912-915
    • Grubbs, F.F.1
  • 24
    • 4243983195 scopus 로고
    • Modelling activity dependencies for building construction project scheduling
    • VTT Publications, Technical Research Centre of Finland, ESPOO 1993
    • KÄHKÖNEN, K., 1993. “ Modelling activity dependencies for building construction project scheduling ”. In Laboratory of Urban Planning and Building Design, Vol. 153, 68–130. VTT Publications. Technical Research Centre of Finland, ESPOO 1993
    • (1993) Laboratory of Urban Planning and Building Design , vol.153 , pp. 68-130
    • Kähkönen, K.1
  • 26
    • 85044160449 scopus 로고
    • Proceedings Eastern Joint Computer Conference, Boston. : December
    • KELLY, J. E., Jr. and WALKER, M., 1959. Critical-Path Planning and Scheduling. Proceedings Eastern Joint Computer Conference. December1-31959, Boston. pp. 160–173.
    • (1959) Critical-Path Planning and Scheduling , pp. 160-173
    • Kelly, J.E.1    Walker, M.2
  • 27
    • 0001620447 scopus 로고
    • Critical-Path Planning and Scheduling: Mathematical Basis
    • KELLY, J. E., Jr. 1960. Critical-Path Planning and Scheduling:Mathematical Basis. Operations Research, 8:296–320.
    • (1960) Operations Research , vol.8 , pp. 296-320
    • Kelly, J.E.1
  • 28
    • 0004749860 scopus 로고
    • The Application of the Line of Balance Technique to the construction industry
    • July
    • KHISTY, C. J., 1970. The Application of the Line of Balance Technique to the construction industry. Indian Concrete J., July:297–320.
    • (1970) Indian Concrete J. , pp. 297-320
    • Khisty, C.J.1
  • 31
    • 0024082622 scopus 로고
    • Artificial Intelligence Techniques for Generating Construction Projects Plans
    • September
    • LEVITT, R. E., KARTAM, N. A., and AND KUNZ, J. C., 1988. Artificial Intelligence Techniques for Generating Construction Projects Plans. ASCE Journal of Construction Engineering and Management, 114 (3) September:329–343.
    • (1988) ASCE Journal of Construction Engineering and Management , vol.114 , Issue.3 , pp. 329-343
    • Levitt, R.E.1    Kartam, N.A.2    Kunz, J.C.3
  • 34
  • 37
    • 0021625335 scopus 로고
    • The CPM Technique in Construction: A critique
    • MASON, D., 1984. The CPM Technique in Construction:A critique. AACE Transactions
    • (1984) AACE Transactions
    • Mason, D.1
  • 39
    • 0021183660 scopus 로고
    • Proceedings of 3rd. Conference in Computing in Civil Engineering, San-Diaego, USA. : ASCE, April
    • MIRESCO, E. T., 1984. ICES-PROJECT\I Adaptation for microcomputer. Proceedings of 3rd. Conference in Computing in Civil Engineering. April2-61984, San-Diaego, USA. pp. 439–448. ASCE.
    • (1984) ICES-PROJECT\I Adaptation for microcomputer , pp. 439-448
    • Miresco, E.T.1
  • 40
    • 85024597654 scopus 로고    scopus 로고
    • Proceedings of Second International conference on computing in Civil Engineering, Hangzhou, China: June
    • MIRESCO, E. T., PROJECT\I-80, an ICES\PROJECT\I like systems for microcomputers. Proceedings of Second International conference on computing in Civil Engineering. June5-91985. pp. 419–433. Hangzhou, China
    • PROJECT\I-80, an ICES\PROJECT\I like systems for microcomputers , pp. 419-433
    • Miresco, E.T.1
  • 41
    • 33644681346 scopus 로고
    • Proceedings of the 6th International Conference on Computing in Civil and Building Engineering, Berlin, Germany. : July
    • MIRESCO, E. T., and POMEROL, J.-Ch., 1995. A Knowledge-Based Decision Support System for Construction Project Management. Proceedings of the 6th International Conference on Computing in Civil and Building Engineering. July12-151995, Berlin, Germany. pp. 1501–1507.
    • (1995) A Knowledge-Based Decision Support System for Construction Project Management , pp. 1501-1507
    • Miresco, E.T.1    Pomerol, J.-C.2
  • 42
    • 85024540264 scopus 로고    scopus 로고
    • Un modèle de représentation graphique des connaissances pour la gestion de projets de construction
    • MIRESCO, E. T., and POMEROL, J.-Ch., Un modèle de représentation graphique des connaissances pour la gestion de projets de construction. Revue Internationale en gestion et management de projets, II (1) 4–16.
    • Revue Internationale en gestion et management de projets , vol.2 , Issue.1 , pp. 4-16
    • Miresco, E.T.1    Pomerol, J.-C.2
  • 43
    • 80053134594 scopus 로고
    • Consideration of PERT Assumptions
    • MURRAY, J. E., 1963. Consideration of PERT Assumptions. IEEE Trans., EM-10:94–99.
    • (1963) IEEE Trans. , vol.EM-10 , pp. 94-99
    • Murray, J.E.1
  • 45
    • 0016643558 scopus 로고
    • VPM scheduling for high-rise building
    • O'BRIEN, J. J., 1975. VPM scheduling for high-rise building. Journal of construction division, 101 (4):895–905.
    • (1975) Journal of construction division , vol.101 , Issue.4 , pp. 895-905
    • O'brien, J.J.1
  • 46
    • 0019044266 scopus 로고
    • Critical path scheduling an overview and a practical alternative
    • July
    • PINNELL, S. S., 1980. Critical path scheduling an overview and a practical alternative. Civil engineering–ASCE, July:66–70.
    • (1980) Civil engineering–ASCE , pp. 66-70
    • Pinnell, S.S.1
  • 47
    • 28244475877 scopus 로고
    • Artificial Intelligence and Human Decision Making
    • Slowinski R., (ed)
    • POMEROL, J.-Ch., 1995. “ Artificial Intelligence and Human Decision Making ”. In Semi- Planary Papers of 14th Euro Edited by:Slowinski, R., 169–196.
    • (1995) Semi- Planary Papers of 14th Euro , pp. 169-196
    • Pomerol, J.-C.1
  • 48
    • 0021604107 scopus 로고
    • A Scheduling Tool for Smaller Jobs
    • RAHBAR, F., 1984. A Scheduling Tool for Smaller Jobs. AACE Transactions
    • (1984) AACE Transactions
    • Rahbar, F.1
  • 49
    • 0343171053 scopus 로고
    • Project Management Knowledge Engineering System
    • RAHBAR, F. F., YATES, J. K., and SPENCER, G. R., 1991. Project Management Knowledge Engineering System. Cost Engineering, 33 (7):15–23.
    • (1991) Cost Engineering , vol.33 , Issue.7 , pp. 15-23
    • Rahbar, F.F.1    Yates, J.K.2    Spencer, G.R.3
  • 51
    • 0022757348 scopus 로고
    • An Evaluation of Expert Systems Development Tools
    • July
    • RICHER, H. M., 1986. An Evaluation of Expert Systems Development Tools. Expert Systems, 3 (3) July:166–183.
    • (1986) Expert Systems , vol.3 , Issue.3 , pp. 166-183
    • Richer, H.M.1
  • 52
    • 0347124420 scopus 로고
    • Contribution de la théorie des graphes à l’étude de certains problèmes linéaires
    • séances du 27 avril
    • ROY, B., 1959. Contribution de la théorie des graphes à l’étude de certains problèmes linéaires. C.R. Acad. Sciences, T. 248 séances du 27 avril:2437–2439.
    • (1959) C.R. Acad. Sciences , vol.248 , pp. 2437-2439
    • Roy, B.1
  • 58
    • 44049120724 scopus 로고
    • Towards an intelligent planning system
    • Novemnber
    • SMITH, S., 1992. Towards an intelligent planning system. International Journal of Project Management, 10 (4) Novemnber:213–218.
    • (1992) International Journal of Project Management , vol.10 , Issue.4 , pp. 213-218
    • Smith, S.1
  • 61
    • 44949283100 scopus 로고
    • Towards a knowledge-based model of project management
    • August
    • TAYLOR, R. M., 1991. Towards a knowledge-based model of project management. International Journal of Project Management, 9 (3) August:169–177.
    • (1991) International Journal of Project Management , vol.9 , Issue.3 , pp. 169-177
    • Taylor, R.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.