메뉴 건너뛰기




Volumn 45, Issue 13, 2007, Pages 2859-2873

Evaluating artificial intelligence heuristics for a flexible Kanban system: Simultaneous Kanban controlling and scheduling

Author keywords

Flexible Kanban system; Heuristics; Kanban controlling; Scheduling; Search; Sequencing

Indexed keywords

FLEXIBLE KANBAN SYSTEM; KANBAN CONTROLLING; MACHINING COSTS; SEQUENCING;

EID: 34249076323     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540600806505     Document Type: Article
Times cited : (16)

References (43)
  • 1
    • 0027654294 scopus 로고
    • A systematic simulation approach for the design of JIT manufacturing systems
    • Abdou, G. and Dutta, S.P., A systematic simulation approach for the design of JIT manufacturing systems. J. Op. Manage., 1993, 11(3), 225-238.
    • (1993) J. Op. Manage , vol.11 , Issue.3 , pp. 225-238
    • Abdou, G.1    Dutta, S.P.2
  • 2
    • 0027353436 scopus 로고
    • Determining the number of Kanbans in multi-item Just-In-Time systems
    • Askin, R.G., Mitwasi, M.G. and Goldberg, J.D., Determining the number of Kanbans in multi-item Just-In-Time systems. IIE Trans., 1993, 25(1), 89-98.
    • (1993) IIE Trans , vol.25 , Issue.1 , pp. 89-98
    • Askin, R.G.1    Mitwasi, M.G.2    Goldberg, J.D.3
  • 3
    • 3242717669 scopus 로고    scopus 로고
    • Adaptive temperature control for simulated annealing: A comparative study
    • Azisi, N. and Zolfaghari, S., Adaptive temperature control for simulated annealing: a comparative study. Comp. & Op. Res., 2004, 31(14), 2439-2451.
    • (2004) Comp. & Op. Res , vol.31 , Issue.14 , pp. 2439-2451
    • Azisi, N.1    Zolfaghari, S.2
  • 4
    • 0000357181 scopus 로고
    • A model for continuous-review pull policies in serial inventory systems
    • Badinelli, R.D., A model for continuous-review pull policies in serial inventory systems. Op. Res., 1992, 40(1), 142-156.
    • (1992) Op. Res , vol.40 , Issue.1 , pp. 142-156
    • Badinelli, R.D.1
  • 5
    • 84990578213 scopus 로고
    • Simulation tests of FCFS and SPT sequencing in Kanban systems
    • Berkley, B.J., Simulation tests of FCFS and SPT sequencing in Kanban systems. Dec. Sci., 1993, 24(1), 218-227.
    • (1993) Dec. Sci , vol.24 , Issue.1 , pp. 218-227
    • Berkley, B.J.1
  • 6
    • 84985803928 scopus 로고
    • A simulation study of sequencing rules in a Kanban-controlled flow shop
    • Berkley, B.J. and Kiran, A.S., A simulation study of sequencing rules in a Kanban-controlled flow shop. Dec. Sci., 1991, 22(3), 559-582.
    • (1991) Dec. Sci , vol.22 , Issue.3 , pp. 559-582
    • Berkley, B.J.1    Kiran, A.S.2
  • 7
    • 0030270186 scopus 로고    scopus 로고
    • Integration of evolutionary programming and simulation to optimise a pull production system
    • Bowden, R.O., Hall, J.D. and Usher, J.M., Integration of evolutionary programming and simulation to optimise a pull production system. Comp. & Indust. Eng., 1996, 31(1-2), 217-220.
    • (1996) Comp. & Indust. Eng , vol.31 , Issue.1-2 , pp. 217-220
    • Bowden, R.O.1    Hall, J.D.2    Usher, J.M.3
  • 9
    • 34250074609 scopus 로고
    • Applying tabu search to the job-shop scheduling problem
    • Dell'Amico, M. and Trubian, M., Applying tabu search to the job-shop scheduling problem. Ann. Op. Res., 1993, 41, 231-252.
    • (1993) Ann. Op. Res , vol.41 , pp. 231-252
    • Dell'Amico, M.1    Trubian, M.2
  • 10
    • 0023343801 scopus 로고
    • Scheduling tasks with due dates in a fabrication/assembly process
    • Faaland, B. and Schmitt, T., Scheduling tasks with due dates in a fabrication/assembly process. Op. Res., 1987, 35(3), 378-388.
    • (1987) Op. Res , vol.35 , Issue.3 , pp. 378-388
    • Faaland, B.1    Schmitt, T.2
  • 11
  • 12
    • 10744220621 scopus 로고    scopus 로고
    • The Conwip production control system: Review and research issues
    • Framinan, J.M., Gonzales, P.L. and Ruiz-Usano, R., The Conwip production control system: Review and research issues. Prod. Plan. & Cont., 2003, 14(3), 255-265.
    • (2003) Prod. Plan. & Cont , vol.14 , Issue.3 , pp. 255-265
    • Framinan, J.M.1    Gonzales, P.L.2    Ruiz-Usano, R.3
  • 13
    • 0027684952 scopus 로고
    • The determination of the optimum number of Kanbans in a just-in-time production system
    • Fukukawa, T. and Hong, S-C., The determination of the optimum number of Kanbans in a just-in-time production system. Comp. & Indust. Eng., 1993, 24(4), 551-559.
    • (1993) Comp. & Indust. Eng , vol.24 , Issue.4 , pp. 551-559
    • Fukukawa, T.1    Hong, S.-C.2
  • 14
  • 16
    • 0141792665 scopus 로고    scopus 로고
    • A branch-and-bound-based local search method for the flow shop problem
    • Haouari, M. and Ladhari, T., A branch-and-bound-based local search method for the flow shop problem. J. Op. Res. Soc., 2003, 54(10), 1076-1084.
    • (2003) J. Op. Res. Soc , vol.54 , Issue.10 , pp. 1076-1084
    • Haouari, M.1    Ladhari, T.2
  • 17
    • 84989486136 scopus 로고
    • A simulation analysis of the Japanese just-in-time technique (with Kanbans) for a multi-line, multi-stage production system
    • Huang, P., Rees, L. and Taylor, B., A simulation analysis of the Japanese just-in-time technique (with Kanbans) for a multi-line, multi-stage production system. Dec. Sci., 1983, 14(3), 326-344.
    • (1983) Dec. Sci , vol.14 , Issue.3 , pp. 326-344
    • Huang, P.1    Rees, L.2    Taylor, B.3
  • 18
    • 0002691514 scopus 로고    scopus 로고
    • IT scheduling rules: A simulation evaluation
    • Hum, S.H. and Lee, C.K., IT scheduling rules: a simulation evaluation. Omega., 1998, 26(3), 381-395.
    • (1998) Omega , vol.26 , Issue.3 , pp. 381-395
    • Hum, S.H.1    Lee, C.K.2
  • 19
    • 0029387149 scopus 로고
    • A simulation analysis of sequencing alternatives for JIT lines using Kanbans
    • Lummus, R.R., A simulation analysis of sequencing alternatives for JIT lines using Kanbans. J. Op. Manage., 1995, 13(3), 183-191.
    • (1995) J. Op. Manage , vol.13 , Issue.3 , pp. 183-191
    • Lummus, R.R.1
  • 20
    • 0042217254 scopus 로고
    • Serial and parallel simulated annealing and tabu search algorithms for the traveling salesman problem
    • Malek, M., Guruswamy, M. and Pandya, M., Serial and parallel simulated annealing and tabu search algorithms for the traveling salesman problem. Ann. Op. Res., 1989, 21, 59-84.
    • (1989) Ann. Op. Res , vol.21 , pp. 59-84
    • Malek, M.1    Guruswamy, M.2    Pandya, M.3
  • 21
    • 0032156317 scopus 로고    scopus 로고
    • A rule induction approach for determining the number of kanbans in a just-in-time production system
    • Markham, I.S., Mathieu, R.G. and Wray, B.A., A rule induction approach for determining the number of kanbans in a just-in-time production system. Comp. Indust. Eng., 1998, 34(4), 717-727.
    • (1998) Comp. Indust. Eng , vol.34 , Issue.4 , pp. 717-727
    • Markham, I.S.1    Mathieu, R.G.2    Wray, B.A.3
  • 22
    • 0004779059 scopus 로고
    • A controlled search simulated annealing method for the single machine weighted tardiness problem
    • Matsuo, H., Suh, C.J. and Sullivan, R.S., A controlled search simulated annealing method for the single machine weighted tardiness problem. Ann. Op. Res., 1989, 21, 85-108.
    • (1989) Ann. Op. Res , vol.21 , pp. 85-108
    • Matsuo, H.1    Suh, C.J.2    Sullivan, R.S.3
  • 23
    • 84985779120 scopus 로고
    • An approximate solution to deterministic Kanban systems
    • Moeeni, F. and Chang, Y.-L., An approximate solution to deterministic Kanban systems. Dec. Sci., 1990, 21(3), 596-607.
    • (1990) Dec. Sci , vol.21 , Issue.3 , pp. 596-607
    • Moeeni, F.1    Chang, Y.-L.2
  • 26
    • 38249025037 scopus 로고
    • Simulated annealing for permutation flow-shop scheduling
    • Osman, I.H. and Potts, C.N., Simulated annealing for permutation flow-shop scheduling. OMEGA, 1989, 17(6), 551-557.
    • (1989) OMEGA , vol.17 , Issue.6 , pp. 551-557
    • Osman, I.H.1    Potts, C.N.2
  • 28
    • 0023365980 scopus 로고
    • Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of leadtime
    • Rees, L., Philipoom, P., Taylor, B. and Huang, P., Dynamically adjusting the number of kanbans in a just-in-time production system using estimated values of leadtime. IIE Trans., 1987, 19(2), 199-207.
    • (1987) IIE Trans , vol.19 , Issue.2 , pp. 199-207
    • Rees, L.1    Philipoom, P.2    Taylor, B.3    Huang, P.4
  • 29
    • 0032708083 scopus 로고    scopus 로고
    • Operations planning for a multi-stage kanban system
    • Sarker, B.R. and Balan, C.V., Operations planning for a multi-stage kanban system. Euro. J. Op. Res., 1999, 112(2), 284-303.
    • (1999) Euro. J. Op. Res , vol.112 , Issue.2 , pp. 284-303
    • Sarker, B.R.1    Balan, C.V.2
  • 30
    • 0001897929 scopus 로고
    • Optimal single-machine scheduling with earliness and tardiness penalties
    • Sidney, J.B., Optimal single-machine scheduling with earliness and tardiness penalties. Op. Res., 1977, 25, 62-69.
    • (1977) Op. Res , vol.25 , pp. 62-69
    • Sidney, J.B.1
  • 33
    • 0025700701 scopus 로고
    • Some efficient heuristic methods for the flow shop sequencing problem
    • Taillard, E.D., Some efficient heuristic methods for the flow shop sequencing problem. Euro, J. Op. Res., 1990, 47, 65-74.
    • (1990) Euro, J. Op. Res , vol.47 , pp. 65-74
    • Taillard, E.D.1
  • 34
    • 0000892122 scopus 로고
    • Parallel taboo search techniques for the job shop scheduling problem
    • Taillard, E.D., Parallel taboo search techniques for the job shop scheduling problem. ORSA J. Comp., 1994, 6(2), 108-117.
    • (1994) ORSA J. Comp , vol.6 , Issue.2 , pp. 108-117
    • Taillard, E.D.1
  • 35
    • 0344152926 scopus 로고    scopus 로고
    • Comparing reactive Kanban systems
    • Takahashi, K., Comparing reactive Kanban systems. Int. J. Prod. Res., 2003, 41(18), 4317-4337.
    • (2003) Int. J. Prod. Res , vol.41 , Issue.18 , pp. 4317-4337
    • Takahashi, K.1
  • 36
    • 0032655401 scopus 로고    scopus 로고
    • Reacting JIT ordering systems to the unstable changes in demand
    • Takahashi, K. and Nakamura, N., Reacting JIT ordering systems to the unstable changes in demand. Int. J. Prod. Res., 1999, 37(10), 2293-2313.
    • (1999) Int. J. Prod. Res , vol.37 , Issue.10 , pp. 2293-2313
    • Takahashi, K.1    Nakamura, N.2
  • 37
    • 0035898986 scopus 로고    scopus 로고
    • An adaptive approach to controlling Kanban systems
    • Tardif, V. and Maaseidvaag, L., An adaptive approach to controlling Kanban systems. Euro. J. Op. Res., 2001, 132(2), 411-424.
    • (2001) Euro. J. Op. Res , vol.132 , Issue.2 , pp. 411-424
    • Tardif, V.1    Maaseidvaag, L.2
  • 38
    • 0022562590 scopus 로고
    • Electronic spreadsheet implementation of a lot sizing procedure for a single-card Kanban system
    • Trevino, J. and McGinnis, L.F., Electronic spreadsheet implementation of a lot sizing procedure for a single-card Kanban system. Comp. & Indust. Eng., 1986, 11(1-4), 340-345.
    • (1986) Comp. & Indust. Eng , vol.11 , Issue.1-4 , pp. 340-345
    • Trevino, J.1    McGinnis, L.F.2
  • 39
    • 3242691440 scopus 로고    scopus 로고
    • Hybrid genetic algorithm for optimisation problems with permutation property
    • Wang, H.F. and Wu, K.U., Hybrid genetic algorithm for optimisation problems with permutation property. Comp. & Op. Res., 2004, 31(14), 2453-2471.
    • (2004) Comp. & Op. Res , vol.31 , Issue.14 , pp. 2453-2471
    • Wang, H.F.1    Wu, K.U.2
  • 40
    • 0000086539 scopus 로고
    • Genetic algorithm application to large-scale job-shop problems
    • edited by R. Mânner and B. Manderick, pp, Elsevier Science Publishers B.V, Amsterdam
    • Yamada, T. and Nakano, R.A., Genetic algorithm application to large-scale job-shop problems. In Parallel Problem Solving from Nature 2, edited by R. Mânner and B. Manderick, pp. 281-290, 1992 (Elsevier Science Publishers B.V.: Amsterdam).
    • (1992) Parallel Problem Solving from Nature 2 , pp. 281-290
    • Yamada, T.1    Nakano, R.A.2
  • 41
    • 5144226254 scopus 로고    scopus 로고
    • Tabu-search simulation optimisation approach for flow-shop scheduling with multiple processors - a case study
    • Yang, T. and Kuo, Y., Tabu-search simulation optimisation approach for flow-shop scheduling with multiple processors - a case study. Int. J. Prod. Res., 2004, 42(19), 4015-4030.
    • (2004) Int. J. Prod. Res , vol.42 , Issue.19 , pp. 4015-4030
    • Yang, T.1    Kuo, Y.2
  • 42
    • 0036722157 scopus 로고    scopus 로고
    • Minimising the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling
    • Yoon, S.H. and Ventura, J.A., Minimising the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling. Comp. & Op. Res., 2002, 29(10), 1301-1315.
    • (2002) Comp. & Op. Res , vol.29 , Issue.10 , pp. 1301-1315
    • Yoon, S.H.1    Ventura, J.A.2
  • 43
    • 0002528360 scopus 로고
    • Does manufacturing need a JIT revolution?
    • January-February
    • Zipkin, P., Does manufacturing need a JIT revolution? Harvard Business Review, 1991, January-February, 40-50.
    • (1991) Harvard Business Review , pp. 40-50
    • Zipkin, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.