메뉴 건너뛰기




Volumn 26, Issue 3, 1998, Pages 381-395

JIT scheduling rules: A simulation evaluation

Author keywords

Just In Time; Scheduling; Simulation

Indexed keywords


EID: 0002691514     PISSN: 03050483     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0305-0483(97)00066-2     Document Type: Article
Times cited : (18)

References (25)
  • 3
    • 84985803928 scopus 로고
    • A simulation study of sequencing rules in a kanban-controlled flow shop
    • Berkley B. J., Kiran A. S. A simulation study of sequencing rules in a kanban-controlled flow shop. Decision Sciences. 22:1991;559-582.
    • (1991) Decision Sciences , vol.22 , pp. 559-582
    • Berkley, B.J.1    Kiran, A.S.2
  • 4
    • 84990578213 scopus 로고
    • Simulation tests of FCFS and SPT sequencing in kanban systems
    • Berkley, B. J., Simulation tests of FCFS and SPT sequencing in kanban systems. Decision Sciences, 1993a, 24, 218-227.
    • (1993) Decision Sciences , vol.24 , pp. 218-227
    • Berkley, B.J.1
  • 8
    • 0023699964 scopus 로고
    • The JIT production: A survey of its development and perception in the Hong Kong electronics industry
    • Cheng T. C. The JIT production: a survey of its development and perception in the Hong Kong electronics industry. Omega. 16:1988;25-32.
    • (1988) Omega , vol.16 , pp. 25-32
    • Cheng, T.C.1
  • 14
    • 84985818194 scopus 로고
    • Analysis and approximation of a JIT production line
    • Jordan S. Analysis and approximation of a JIT production line. Decision Sciences. 19:1988;672-681.
    • (1988) Decision Sciences , vol.19 , pp. 672-681
    • Jordan, S.1
  • 17
    • 0025262876 scopus 로고
    • A mathematical programming approach for determining workcentre lotsize in a JIT system with signal kanbans
    • Philipoom P. R., Rees L. P., Taylor B. W., Huang P. Y. A mathematical programming approach for determining workcentre lotsize in a JIT system with signal kanbans. International Journal of Production Research. 28:1990;1-15.
    • (1990) International Journal of Production Research , vol.28 , pp. 1-15
    • Philipoom, P.R.1    Rees, L.P.2    Taylor, B.W.3    Huang, P.Y.4
  • 21
    • 0029387149 scopus 로고
    • A simulation analysis of sequencing alternatives for JIT lines using kanbans
    • Lummus R. R. A simulation analysis of sequencing alternatives for JIT lines using kanbans. Journal of Operations Management. 13:1995;183-191.
    • (1995) Journal of Operations Management , vol.13 , pp. 183-191
    • Lummus, R.R.1
  • 22
    • 0029734386 scopus 로고    scopus 로고
    • Simultaneously determining the number of kanbans, container size, and the final-assembly sequences of products in a Just-in-time shop
    • Philipoom P. R., Rees L. P., Taylor B. W. Simultaneously determining the number of kanbans, container size, and the final-assembly sequences of products in a Just-in-time shop. International Journal of Production Research. 34:1996;51-69.
    • (1996) International Journal of Production Research , vol.34 , pp. 51-69
    • Philipoom, P.R.1    Rees, L.P.2    Taylor, B.W.3
  • 23
    • 0027813686 scopus 로고
    • Effect of buffer capacity and sequencing rules on single-card kanban system performance
    • Berkley, B. J., Effect of buffer capacity and sequencing rules on single-card kanban system performance. International Journal of Production Research, 1993b, 31, 2875-2893.
    • (1993) International Journal of Production Research , vol.31 , pp. 2875-2893
    • Berkley, B.J.1
  • 24
    • 0040467953 scopus 로고
    • Prioritization of kanbans in the case of a single station serving multiple downstream stations
    • Chao X., Das S. K., Nagendra P. Prioritization of kanbans in the case of a single station serving multiple downstream stations. International Journal of Production Research. 33:1995;377-389.
    • (1995) International Journal of Production Research , vol.33 , pp. 377-389
    • Chao, X.1    Das, S.K.2    Nagendra, P.3
  • 25
    • 0001071723 scopus 로고
    • A kanban-based simulation study of a mixed model Just-in-time manufacturing line
    • Yavuz I. H., Satir A. A kanban-based simulation study of a mixed model Just-in-time manufacturing line. International Journal of Production Research. 33:1995;1027-1048.
    • (1995) International Journal of Production Research , vol.33 , pp. 1027-1048
    • Yavuz, I.H.1    Satir, A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.