-
1
-
-
0003964033
-
-
MIT Center for Advanced Engineering Study, MIT Press, Cambridge MA
-
Deming W.E. Out of Crisis (1986), MIT Center for Advanced Engineering Study, MIT Press, Cambridge MA
-
(1986)
Out of Crisis
-
-
Deming, W.E.1
-
4
-
-
0003833625
-
-
Carnegie Mellon University, Pittsburgh, PA CMU/SEI-95-MM-003
-
Bate R., Kuhn D., Wells C., et al. A Systems Engineering Capability Maturity Model, Version 1.1 (1995), Carnegie Mellon University, Pittsburgh, PA CMU/SEI-95-MM-003
-
(1995)
A Systems Engineering Capability Maturity Model, Version 1.1
-
-
Bate, R.1
Kuhn, D.2
Wells, C.3
-
5
-
-
0024031604
-
The TAME Project: toward improvement-oriented software environment
-
Basili V.R., and Rombach H.D. The TAME Project: toward improvement-oriented software environment. IEEE Transactions on Software Engineering 14 6 (1988) 58-73
-
(1988)
IEEE Transactions on Software Engineering
, vol.14
, Issue.6
, pp. 58-73
-
-
Basili, V.R.1
Rombach, H.D.2
-
8
-
-
0004151305
-
-
Carnegie Mellon University, Pittsburgh, PA CMU/SEI-96-HB-002
-
Park R.E., Goethert W.B., and Florac W.A. Goal-Driven Software Measurement-A Guidebook (1996), Carnegie Mellon University, Pittsburgh, PA CMU/SEI-96-HB-002
-
(1996)
Goal-Driven Software Measurement-A Guidebook
-
-
Park, R.E.1
Goethert, W.B.2
Florac, W.A.3
-
9
-
-
0032296180
-
An approach to improving existing measurement framework
-
Mendonca M.G., Bhandari V.R., and Dawson J. An approach to improving existing measurement framework. IBM System Journal 37 4 (1998) 484-501
-
(1998)
IBM System Journal
, vol.37
, Issue.4
, pp. 484-501
-
-
Mendonca, M.G.1
Bhandari, V.R.2
Dawson, J.3
-
10
-
-
2342427050
-
An integrated evaluation system based on the continuous improvement model of IS performance
-
Leem C.S., and Kim I. An integrated evaluation system based on the continuous improvement model of IS performance. Industrial Management & Data Systems 104 2 (2004) 115-128
-
(2004)
Industrial Management & Data Systems
, vol.104
, Issue.2
, pp. 115-128
-
-
Leem, C.S.1
Kim, I.2
-
11
-
-
0001167750
-
Reengineering work: don't automate, obliterate
-
Hammer M. Reengineering work: don't automate, obliterate. Harvard Business Review (1990) 104-112
-
(1990)
Harvard Business Review
, pp. 104-112
-
-
Hammer, M.1
-
14
-
-
0003584837
-
-
CIMA, London
-
Fitzgerald L., Johnson R., Brignall S., Silvestro R., and Voss C. Performance Measurement in Service Business (1991), CIMA, London
-
(1991)
Performance Measurement in Service Business
-
-
Fitzgerald, L.1
Johnson, R.2
Brignall, S.3
Silvestro, R.4
Voss, C.5
-
17
-
-
0029275451
-
Business process re-engineering (BPR)-a study of the software tools currently available
-
Bradley P., Browne J., Jackson S., and Jagdev H. Business process re-engineering (BPR)-a study of the software tools currently available. Computers in Industry 25 3 (1995) 309-330
-
(1995)
Computers in Industry
, vol.25
, Issue.3
, pp. 309-330
-
-
Bradley, P.1
Browne, J.2
Jackson, S.3
Jagdev, H.4
-
18
-
-
24144451277
-
A review of performance measurement: towards performance management
-
Folan P., and Browne J. A review of performance measurement: towards performance management. Computers in Industry 56 (2005) 663-680
-
(2005)
Computers in Industry
, vol.56
, pp. 663-680
-
-
Folan, P.1
Browne, J.2
-
19
-
-
84986129868
-
Strategic intent, measurement capability, and operational success: making the connection
-
Fawcett S., Smith S., and Cooper M. Strategic intent, measurement capability, and operational success: making the connection. International Journal of Physical Distribution and Logistics 27 7 (1997) 410-421
-
(1997)
International Journal of Physical Distribution and Logistics
, vol.27
, Issue.7
, pp. 410-421
-
-
Fawcett, S.1
Smith, S.2
Cooper, M.3
-
21
-
-
0442319708
-
True measures of supply chain performance
-
Lapide L. True measures of supply chain performance. Supply Chain Management Review 4 July-August (3) (2000) 25-28
-
(2000)
Supply Chain Management Review
, vol.4
, Issue.July-August 3
, pp. 25-28
-
-
Lapide, L.1
-
22
-
-
84986164029
-
New criteria of performance management: a transition from enterprise to collaborative supply chain
-
Basu R. New criteria of performance management: a transition from enterprise to collaborative supply chain. Measuring Business Excellence 5 4 (2001) 7-12
-
(2001)
Measuring Business Excellence
, vol.5
, Issue.4
, pp. 7-12
-
-
Basu, R.1
-
23
-
-
0038292124
-
Feasibility of performance measurement system for supply chain: a process-based approach and measures
-
Chan F., and Qi H. Feasibility of performance measurement system for supply chain: a process-based approach and measures. Integrated Manufacturing Systems 14 3 (2003) 179-190
-
(2003)
Integrated Manufacturing Systems
, vol.14
, Issue.3
, pp. 179-190
-
-
Chan, F.1
Qi, H.2
-
24
-
-
0013352685
-
-
John Wiley & Sons, New York
-
Ostrenga M.R., Ozan T.R., Mcllhattan R.D., and Harwood M.D. The Ernst & Young Guide to Total Cost Management (1992), John Wiley & Sons, New York
-
(1992)
The Ernst & Young Guide to Total Cost Management
-
-
Ostrenga, M.R.1
Ozan, T.R.2
Mcllhattan, R.D.3
Harwood, M.D.4
-
25
-
-
84946245450
-
A commonsense management model
-
Yeh R.T., and Mittermeir R.T. A commonsense management model. IEEE Software 6 2 (1991) 23-33
-
(1991)
IEEE Software
, vol.6
, Issue.2
, pp. 23-33
-
-
Yeh, R.T.1
Mittermeir, R.T.2
-
26
-
-
34247154623
-
-
ESPRIT Consortium AMICE. CIMOSA: Open System Architecture for CIM, Springer-Verlag, Berlin, 1993.
-
-
-
-
27
-
-
34247135216
-
A dynamic PERT/CPM technique with compound number supporting enterprise process flexible scheduling
-
Harbin, China
-
Tan W.A., Li S., Zeng L.G., and Shen W. A dynamic PERT/CPM technique with compound number supporting enterprise process flexible scheduling. Proceedings of the International Conference on Advanced Design and Manufacture, January 8-10. Harbin, China (2006)
-
(2006)
Proceedings of the International Conference on Advanced Design and Manufacture, January 8-10
-
-
Tan, W.A.1
Li, S.2
Zeng, L.G.3
Shen, W.4
-
28
-
-
0036552460
-
Research on simulation-based auto-optimize technique in enterprise process modeling
-
Tan W.A., Zhou B.S., and Li M.S. Research on simulation-based auto-optimize technique in enterprise process modeling. Journal of Software 4 (2002) 706-712
-
(2002)
Journal of Software
, vol.4
, pp. 706-712
-
-
Tan, W.A.1
Zhou, B.S.2
Li, M.S.3
-
29
-
-
33746877573
-
Zero-time enterprise modeling with component assembly and process model optimization techniques
-
Shanghai, China, September 21-23
-
Tan W.A., Li S., and Yang F. Zero-time enterprise modeling with component assembly and process model optimization techniques. Proceedings of IEEE CIT2005/SOAIC2005. Shanghai, China, September 21-23 (2005)
-
(2005)
Proceedings of IEEE CIT2005/SOAIC2005
-
-
Tan, W.A.1
Li, S.2
Yang, F.3
-
31
-
-
34247147408
-
-
W.A. Tan, A Study and Development for Dynamic Optimizing Enterprise Process Technique and its Supporting Environment, Ph.D. Thesis, BeiHang University, BeiJing, 2001.
-
-
-
-
32
-
-
0003573348
-
-
Taylor and Francis, London, UK
-
Shen W., Norrie D.H., and Barthes J.P. Multi-Agent Systems for Concurrent Intelligent Design and Manufacturing (2001), Taylor and Francis, London, UK
-
(2001)
Multi-Agent Systems for Concurrent Intelligent Design and Manufacturing
-
-
Shen, W.1
Norrie, D.H.2
Barthes, J.P.3
|