-
2
-
-
0034288043
-
The analytical hierarchy process applied to maintenance strategy selection
-
Bevilacqua M., and Braglia M. The analytical hierarchy process applied to maintenance strategy selection. Reliab. Eng. Syst. Saf. 70 (2000) 71-83
-
(2000)
Reliab. Eng. Syst. Saf.
, vol.70
, pp. 71-83
-
-
Bevilacqua, M.1
Braglia, M.2
-
3
-
-
0242487685
-
Risk-based maintenance (RBM): a quantitative approach for maintenance/inspection scheduling and planning
-
Khan F.I., and Haddara M. Risk-based maintenance (RBM): a quantitative approach for maintenance/inspection scheduling and planning. J. Loss Prevent. Process Ind. 16 (2003) 561-573
-
(2003)
J. Loss Prevent. Process Ind.
, vol.16
, pp. 561-573
-
-
Khan, F.I.1
Haddara, M.2
-
4
-
-
0034248763
-
Risk-based hazardous protection and prevention by inspection and maintenance
-
Brown S.J., and May I.L. Risk-based hazardous protection and prevention by inspection and maintenance. Trans. ASME J. Press. Ves. Technol. 122 (2003) 362-367
-
(2003)
Trans. ASME J. Press. Ves. Technol.
, vol.122
, pp. 362-367
-
-
Brown, S.J.1
May, I.L.2
-
5
-
-
0141988590
-
Plant maintenance strategy: evidence from four British manufacturing firms
-
Cooke F.L. Plant maintenance strategy: evidence from four British manufacturing firms. J. Qual. Maint. Eng. 9 3 (2003) 239-249
-
(2003)
J. Qual. Maint. Eng.
, vol.9
, Issue.3
, pp. 239-249
-
-
Cooke, F.L.1
-
6
-
-
3242681338
-
Productivity enhancement using safety and maintenance integration: an overview
-
Raouf A. Productivity enhancement using safety and maintenance integration: an overview. Int. J. Syst. Cybernet. 33 7 (2004) 1116-1126
-
(2004)
Int. J. Syst. Cybernet.
, vol.33
, Issue.7
, pp. 1116-1126
-
-
Raouf, A.1
-
7
-
-
12344296488
-
Risk-based maintenance (RBM): a new approach for process plant inspecton and maintenance
-
Khan F.I., and Haddara M. Risk-based maintenance (RBM): a new approach for process plant inspecton and maintenance. Process Saf. Prog. 23 4 (2004) 252-265
-
(2004)
Process Saf. Prog.
, vol.23
, Issue.4
, pp. 252-265
-
-
Khan, F.I.1
Haddara, M.2
-
8
-
-
0021822958
-
Risk: a probabilistic concept
-
Nieuwhof G.W.E. Risk: a probabilistic concept. Reliab. Eng. 10 (1985) 183-188
-
(1985)
Reliab. Eng.
, vol.10
, pp. 183-188
-
-
Nieuwhof, G.W.E.1
-
9
-
-
0025246024
-
Using quantitative risk assessment in the chemical process industry
-
Arendt J.S. Using quantitative risk assessment in the chemical process industry. Reliab. Eng. Syst. Saf. 29 (1990) 133-149
-
(1990)
Reliab. Eng. Syst. Saf.
, vol.29
, pp. 133-149
-
-
Arendt, J.S.1
-
11
-
-
0037240333
-
Appropriate risk assessment methods for major accident establishments
-
Carter D.A., Hirst I.L., Maddison T.E., and Porter S.R. Appropriate risk assessment methods for major accident establishments. Trans. IChemE Process Saf. Environ. Prot. 81 B (2003) 12-18
-
(2003)
Trans. IChemE Process Saf. Environ. Prot.
, vol.81
, Issue.B
, pp. 12-18
-
-
Carter, D.A.1
Hirst, I.L.2
Maddison, T.E.3
Porter, S.R.4
-
12
-
-
2142815698
-
Risk-based maintenance of ethylene oxide production facilities
-
Khan F.I., and Haddara M. Risk-based maintenance of ethylene oxide production facilities. J. Hazard. Mater. A 108 (2004) 147-159
-
(2004)
J. Hazard. Mater. A
, vol.108
, pp. 147-159
-
-
Khan, F.I.1
Haddara, M.2
-
14
-
-
33947402088
-
-
R.L. Rogers, The RASE project risk assessment of unit operations and equipment, 2000, http://www.safetynet.de/.
-
-
-
-
15
-
-
0032127387
-
Techniques and methodologies of risk analysis in chemical process industries
-
Khan F.I., and Abbasi S.A. Techniques and methodologies of risk analysis in chemical process industries. J. Loss Prevent. Process Ind. 11 (1998) 261-277
-
(1998)
J. Loss Prevent. Process Ind.
, vol.11
, pp. 261-277
-
-
Khan, F.I.1
Abbasi, S.A.2
-
16
-
-
0022043416
-
Eliminating potential process hazards
-
Kletz T.A. Eliminating potential process hazards. Chem. Eng. (1985) 48-68
-
(1985)
Chem. Eng.
, pp. 48-68
-
-
Kletz, T.A.1
-
17
-
-
0024030235
-
Application of hazard and operability study to hazard evaluation of an absorption heat pump
-
Shafaghi A., and Cook F.B. Application of hazard and operability study to hazard evaluation of an absorption heat pump. IEEE Trans. Reliab. 37 2 (1988) 159-166
-
(1988)
IEEE Trans. Reliab.
, vol.37
, Issue.2
, pp. 159-166
-
-
Shafaghi, A.1
Cook, F.B.2
-
18
-
-
0024701954
-
Improve process safety reviews
-
Jacobs H.C. Improve process safety reviews. Hydrocarb. Process. (1989) 66-72
-
(1989)
Hydrocarb. Process.
, pp. 66-72
-
-
Jacobs, H.C.1
-
19
-
-
0025252165
-
Process risk evaluation-what method to use?
-
Montague D.F. Process risk evaluation-what method to use?. Reliab. Eng. Syst. Saf. 29 (1990) 27-53
-
(1990)
Reliab. Eng. Syst. Saf.
, vol.29
, pp. 27-53
-
-
Montague, D.F.1
-
20
-
-
0026230988
-
Oversights and mythology in a HAZOP program
-
Kelly W.J. Oversights and mythology in a HAZOP program. Hydrocarb. Process. (1991) 114-116
-
(1991)
Hydrocarb. Process.
, pp. 114-116
-
-
Kelly, W.J.1
-
21
-
-
0038096573
-
Lessons from HAZOP experiences
-
Jones D.W. Lessons from HAZOP experiences. Hydrocarb. Process. (1992) 77-80
-
(1992)
Hydrocarb. Process.
, pp. 77-80
-
-
Jones, D.W.1
-
22
-
-
0039503784
-
HAZOP-past and future
-
Kletz T.A. HAZOP-past and future. Reliab. Eng. Syst. Saf. 55 (1997) 263-266
-
(1997)
Reliab. Eng. Syst. Saf.
, vol.55
, pp. 263-266
-
-
Kletz, T.A.1
-
23
-
-
0032402065
-
Development of a hazard and operability-based method for identifying safety management vulnerabilities in high risk systems
-
Kennedy R., and Kirwan B. Development of a hazard and operability-based method for identifying safety management vulnerabilities in high risk systems. Saf. Sci. 30 (1998) 249-274
-
(1998)
Saf. Sci.
, vol.30
, pp. 249-274
-
-
Kennedy, R.1
Kirwan, B.2
-
24
-
-
0033220936
-
HAZID, a computer aid for hazard identification. 1. STOPHAZ package and the HAZID code: an overview, the issues and the structure
-
McCoy S.A., Wakeman S.J., Larkin F.D., Jefferson M.L., Chung P.W.H., Rushton A.G., Lees F.P., and Heino P.M. HAZID, a computer aid for hazard identification. 1. STOPHAZ package and the HAZID code: an overview, the issues and the structure. Trans. IChemE Process Saf. Environ. Prot. 77 B (1999) 317-327
-
(1999)
Trans. IChemE Process Saf. Environ. Prot.
, vol.77
, Issue.B
, pp. 317-327
-
-
McCoy, S.A.1
Wakeman, S.J.2
Larkin, F.D.3
Jefferson, M.L.4
Chung, P.W.H.5
Rushton, A.G.6
Lees, F.P.7
Heino, P.M.8
-
26
-
-
0031131614
-
OptHAZOP-an effective and optimum approach for HAZOP study
-
Khan F.I., and Abbasi S.A. OptHAZOP-an effective and optimum approach for HAZOP study. J. Loss Prevent. Process Ind. 10 3 (1997) 191-204
-
(1997)
J. Loss Prevent. Process Ind.
, vol.10
, Issue.3
, pp. 191-204
-
-
Khan, F.I.1
Abbasi, S.A.2
-
27
-
-
38249013946
-
Plant level safety analysis
-
Toola A. Plant level safety analysis. J. Loss Prevent. Process Ind. 5 2 (1992) 119-124
-
(1992)
J. Loss Prevent. Process Ind.
, vol.5
, Issue.2
, pp. 119-124
-
-
Toola, A.1
-
29
-
-
0035119389
-
Six steps to effectively update and revalidate PHAs
-
Smith K.E. Six steps to effectively update and revalidate PHAs. Chem. Eng. Prog. (2001) 70-77
-
(2001)
Chem. Eng. Prog.
, pp. 70-77
-
-
Smith, K.E.1
-
30
-
-
0142010412
-
On the ability of process hazard analysis to identify accidents
-
Baybutt P. On the ability of process hazard analysis to identify accidents. Process Saf. Prog. 22 3 (2003) 191-194
-
(2003)
Process Saf. Prog.
, vol.22
, Issue.3
, pp. 191-194
-
-
Baybutt, P.1
-
32
-
-
0036558213
-
Acrylic reactor runaway and explosion accident analysis
-
Kao C.S., and Ku K.H. Acrylic reactor runaway and explosion accident analysis. J. Loss Prevent. Process Ind. 15 (2002) 213-222
-
(2002)
J. Loss Prevent. Process Ind.
, vol.15
, pp. 213-222
-
-
Kao, C.S.1
Ku, K.H.2
-
33
-
-
9444239163
-
Risk-based maintenance model for offshore oil and gas pipelines: a case study
-
Dey P.K., Ogunlana S.O., and Naksuksakul S. Risk-based maintenance model for offshore oil and gas pipelines: a case study. J. Qual. Maint. Eng. 10 3 (2004) 169-183
-
(2004)
J. Qual. Maint. Eng.
, vol.10
, Issue.3
, pp. 169-183
-
-
Dey, P.K.1
Ogunlana, S.O.2
Naksuksakul, S.3
-
34
-
-
33947421883
-
Application of risk-based maintenance on materials handling systems
-
Masataka Y., Jun T., Hidenari B., Toshiharu K., and Akio F. Application of risk-based maintenance on materials handling systems. IHI Eng. Rev. 37 2 (2004) 52-58
-
(2004)
IHI Eng. Rev.
, vol.37
, Issue.2
, pp. 52-58
-
-
Masataka, Y.1
Jun, T.2
Hidenari, B.3
Toshiharu, K.4
Akio, F.5
-
35
-
-
0032108558
-
Recommendations on the use of expert judgement in safety and reliability engineering studies. Two offshore case studies
-
Hokstad P., Øien K., and Reinertsen R. Recommendations on the use of expert judgement in safety and reliability engineering studies. Two offshore case studies. Reliab. Eng. Syst. Saf. 61 (1998) 65-76
-
(1998)
Reliab. Eng. Syst. Saf.
, vol.61
, pp. 65-76
-
-
Hokstad, P.1
Øien, K.2
Reinertsen, R.3
-
36
-
-
0022020263
-
Rapid ranking of process hazards
-
Gillett J.E. Rapid ranking of process hazards. Process Eng. (1985) 19-22
-
(1985)
Process Eng.
, pp. 19-22
-
-
Gillett, J.E.1
-
37
-
-
0030344186
-
Simulation of accidents in a chemical industry using the software package MAXCRED
-
Khan F.I., and Abbasi S.A. Simulation of accidents in a chemical industry using the software package MAXCRED. Indian J. Chem. Technol. 3 (1996) 338-344
-
(1996)
Indian J. Chem. Technol.
, vol.3
, pp. 338-344
-
-
Khan, F.I.1
Abbasi, S.A.2
-
38
-
-
0010473839
-
A maximum credible accident analysis based quantitative risk assessment study of a chemical process industry
-
Khan F.I., and Abbasi S.A. A maximum credible accident analysis based quantitative risk assessment study of a chemical process industry. Indian Chem. Eng., Sec. B 39 2 (1997) 164-172
-
(1997)
Indian Chem. Eng., Sec. B
, vol.39
, Issue.2
, pp. 164-172
-
-
Khan, F.I.1
Abbasi, S.A.2
-
39
-
-
0003162867
-
Use maximum-credible accident scenarios for realistic and reliable risk assessment
-
Khan F.I. Use maximum-credible accident scenarios for realistic and reliable risk assessment. Chem. Eng. Prog. (2001) 56-64
-
(2001)
Chem. Eng. Prog.
, pp. 56-64
-
-
Khan, F.I.1
-
40
-
-
0036842331
-
A criterion for developing credible accident scenarios for risk assessment
-
Khan F.I., and Abbasi S.A. A criterion for developing credible accident scenarios for risk assessment. J. Loss Prevent. Process Ind. 15 (2002) 467-475
-
(2002)
J. Loss Prevent. Process Ind.
, vol.15
, pp. 467-475
-
-
Khan, F.I.1
Abbasi, S.A.2
-
41
-
-
0031272822
-
Accident hazard index: a multi attribute method for process industry hazard rating
-
Khan F.I., and Abbasi S.A. Accident hazard index: a multi attribute method for process industry hazard rating. Trans. IChemE Process Saf. Environ. Prot. 75 4 (1997) 217-224
-
(1997)
Trans. IChemE Process Saf. Environ. Prot.
, vol.75
, Issue.4
, pp. 217-224
-
-
Khan, F.I.1
Abbasi, S.A.2
-
45
-
-
0037999094
-
Hydroxylamine production: will a QRA help you decide?
-
Krishna K., Wang Y., Saraf S.R., Rogers W.J., Baldwin J.T., Gupta J.P., and Mannan M.S. Hydroxylamine production: will a QRA help you decide?. Reliab. Eng. Syst. Saf. 81 (2003) 215-224
-
(2003)
Reliab. Eng. Syst. Saf.
, vol.81
, pp. 215-224
-
-
Krishna, K.1
Wang, Y.2
Saraf, S.R.3
Rogers, W.J.4
Baldwin, J.T.5
Gupta, J.P.6
Mannan, M.S.7
-
46
-
-
0035294894
-
Safety weighted hazard index (SWeHI) a new user-friendly tool for swift yet comprehensive hazard identification and safety evaluation in chemical process industries
-
Khan F.I., Husain T., and Abbasi S.A. Safety weighted hazard index (SWeHI) a new user-friendly tool for swift yet comprehensive hazard identification and safety evaluation in chemical process industries. Trans. IChemE Process Saf. Environ. Prot. 79 B (2001) 65-80
-
(2001)
Trans. IChemE Process Saf. Environ. Prot.
, vol.79
, Issue.B
, pp. 65-80
-
-
Khan, F.I.1
Husain, T.2
Abbasi, S.A.3
-
49
-
-
0034632168
-
Analytical simulation and PROFAT. II. A new methodology and a computer automated tool for fault tree analysis in chemical process industries
-
Khan F.I., and Abbasi S.A. Analytical simulation and PROFAT. II. A new methodology and a computer automated tool for fault tree analysis in chemical process industries. J. Hazard. Mater. A 75 (2000) 1-27
-
(2000)
J. Hazard. Mater. A
, vol.75
, pp. 1-27
-
-
Khan, F.I.1
Abbasi, S.A.2
-
50
-
-
0020988170
-
Fault-tree analysis by fuzzy probability
-
Tanaka H., Fan L.T., Lai F.S., and Toguchi K. Fault-tree analysis by fuzzy probability. IEEE Trans. Reliab. 32 5 (1983) 453-457
-
(1983)
IEEE Trans. Reliab.
, vol.32
, Issue.5
, pp. 453-457
-
-
Tanaka, H.1
Fan, L.T.2
Lai, F.S.3
Toguchi, K.4
-
52
-
-
0033622659
-
A "worst case" methodology for risk assessment of major accident installations
-
Hirst I.L., and Carter D.A. A "worst case" methodology for risk assessment of major accident installations. Process Saf. Prog. 19 2 (2000) 78-85
-
(2000)
Process Saf. Prog.
, vol.19
, Issue.2
, pp. 78-85
-
-
Hirst, I.L.1
Carter, D.A.2
-
53
-
-
0025263783
-
Quantitative risk analysis in the chemical process industry
-
Van Sciver G.R. Quantitative risk analysis in the chemical process industry. Reliab. Eng. Syst. Saf. 29 (1990) 55-68
-
(1990)
Reliab. Eng. Syst. Saf.
, vol.29
, pp. 55-68
-
-
Van Sciver, G.R.1
-
54
-
-
0035545589
-
Risk assessment of LPG automotive refueling facilities
-
Melchers R.E., and Feutrill W.R. Risk assessment of LPG automotive refueling facilities. Reliab. Eng. Syst. Saf. 74 (2001) 283-290
-
(2001)
Reliab. Eng. Syst. Saf.
, vol.74
, pp. 283-290
-
-
Melchers, R.E.1
Feutrill, W.R.2
-
55
-
-
0041834757
-
Quantitative risk assessment for accidental release of titanium tetrachloride in a titanium sponge production plant
-
Roy P.K., Bhatt A., and Rajagopal C. Quantitative risk assessment for accidental release of titanium tetrachloride in a titanium sponge production plant. J. Hazard. Mater. A 102 (2003) 167-186
-
(2003)
J. Hazard. Mater. A
, vol.102
, pp. 167-186
-
-
Roy, P.K.1
Bhatt, A.2
Rajagopal, C.3
-
56
-
-
0031084782
-
Risk analysis of an epichlorohydrin manufacturing industry using the new computer automated tool MAXCRED
-
Khan F.I., and Abbasi S.A. Risk analysis of an epichlorohydrin manufacturing industry using the new computer automated tool MAXCRED. J. Loss Prevent. Process Ind. 10 2 (1997) 91-100
-
(1997)
J. Loss Prevent. Process Ind.
, vol.10
, Issue.2
, pp. 91-100
-
-
Khan, F.I.1
Abbasi, S.A.2
-
57
-
-
0031654743
-
Rapid quantitative risk assessment of a petrochemical industry using a new software MAXCRED
-
Khan F.I., and Abbasi S.A. Rapid quantitative risk assessment of a petrochemical industry using a new software MAXCRED. J. Cleaner Prod. 6 (1998) 9-22
-
(1998)
J. Cleaner Prod.
, vol.6
, pp. 9-22
-
-
Khan, F.I.1
Abbasi, S.A.2
-
58
-
-
0040182679
-
TORAP-a new tool for conducting rapid risk assessments in petroleum refineries and petrochemical industries
-
Khan F.I., and Abbasi S.A. TORAP-a new tool for conducting rapid risk assessments in petroleum refineries and petrochemical industries. Appl. Energ. 65 (2000) 187-210
-
(2000)
Appl. Energ.
, vol.65
, pp. 187-210
-
-
Khan, F.I.1
Abbasi, S.A.2
-
59
-
-
0037047786
-
Quantitative risk assessment improves refinery safety
-
Markowski A.S. Quantitative risk assessment improves refinery safety. Oil Gas J. (2002) 56-63
-
(2002)
Oil Gas J.
, pp. 56-63
-
-
Markowski, A.S.1
-
61
-
-
0033826927
-
Risk analysis of a typical chemical industry using ORA procedure
-
Khan F.I., and Abbasi S.A. Risk analysis of a typical chemical industry using ORA procedure. J. Loss Prevent. Process Ind. 14 (2001) 43-59
-
(2001)
J. Loss Prevent. Process Ind.
, vol.14
, pp. 43-59
-
-
Khan, F.I.1
Abbasi, S.A.2
-
62
-
-
0030241756
-
Risk assessment of process models
-
Kusaik A., and Zakarian A. Risk assessment of process models. Comput. Ind. Eng. 30 4 (1996) 599-610
-
(1996)
Comput. Ind. Eng.
, vol.30
, Issue.4
, pp. 599-610
-
-
Kusaik, A.1
Zakarian, A.2
-
63
-
-
0035546533
-
Estimation of probabilities and likely consequences of a chain of accidents (domino effect) in Manali Industrial Complex
-
Khan F.I., and Abbasi S.A. Estimation of probabilities and likely consequences of a chain of accidents (domino effect) in Manali Industrial Complex. J. Cleaner Prod. 9 (2001) 493-508
-
(2001)
J. Cleaner Prod.
, vol.9
, pp. 493-508
-
-
Khan, F.I.1
Abbasi, S.A.2
-
64
-
-
0242320548
-
Introduction to layers of protection analysis
-
Summers A.E. Introduction to layers of protection analysis. J. Hazard. Mater. 104 (2003) 163-168
-
(2003)
J. Hazard. Mater.
, vol.104
, pp. 163-168
-
-
Summers, A.E.1
-
65
-
-
2342458297
-
A predictive risk index for safety performance in process industries
-
Chen J.-R., and Yang Y.-T. A predictive risk index for safety performance in process industries. J. Loss Prevent. Process Ind. 17 (2004) 233-242
-
(2004)
J. Loss Prevent. Process Ind.
, vol.17
, pp. 233-242
-
-
Chen, J.-R.1
Yang, Y.-T.2
-
66
-
-
3442897147
-
Loss prevention in heavy industry: risk assessment of large gasholders
-
Bernaik A., and Libisova M. Loss prevention in heavy industry: risk assessment of large gasholders. J. Loss Prevent. Process Ind. 17 (2004) 271-278
-
(2004)
J. Loss Prevent. Process Ind.
, vol.17
, pp. 271-278
-
-
Bernaik, A.1
Libisova, M.2
-
67
-
-
33947431206
-
-
IAEA-TECDOC-727, Manual for the Classification and Prioritization of Risks Due to Major Accidents in the Process and Related Industries, International Atomic Energy Agency, Austria, 1996.
-
-
-
-
68
-
-
4644233338
-
Semi-quantitative fault tree analysis for process plant safety using frequency and probability ranges
-
Hauptamanns U. Semi-quantitative fault tree analysis for process plant safety using frequency and probability ranges. J. Loss Prevent. Process Ind. 17 (2004) 339-345
-
(2004)
J. Loss Prevent. Process Ind.
, vol.17
, pp. 339-345
-
-
Hauptamanns, U.1
-
70
-
-
0029219840
-
Process risk assessment-using science to "do it right"
-
Schlechter W. Process risk assessment-using science to "do it right". Int. J. Press. Ves. Pip. 61 (1995) 479-494
-
(1995)
Int. J. Press. Ves. Pip.
, vol.61
, pp. 479-494
-
-
Schlechter, W.1
-
71
-
-
0036205176
-
Can we make maintenance decisions on risk analysis results?
-
Backlund F., and Hannu J. Can we make maintenance decisions on risk analysis results?. J. Qual. Maint. Eng. 8 1 (2002) 77-91
-
(2002)
J. Qual. Maint. Eng.
, vol.8
, Issue.1
, pp. 77-91
-
-
Backlund, F.1
Hannu, J.2
-
72
-
-
5144225219
-
Risk-based inspection and maintenance systems for steam turbines
-
Fujiyama K., Nagai S., Akikuni Y., Fujiwara T., Furuya K., Matsumoto S., Takagi K., and Kawabata T. Risk-based inspection and maintenance systems for steam turbines. Int. J. Press. Ves. Pip. 81 10/11 (2004) 825-835
-
(2004)
Int. J. Press. Ves. Pip.
, vol.81
, Issue.10-11
, pp. 825-835
-
-
Fujiyama, K.1
Nagai, S.2
Akikuni, Y.3
Fujiwara, T.4
Furuya, K.5
Matsumoto, S.6
Takagi, K.7
Kawabata, T.8
-
73
-
-
16244421113
-
Development of a risk-based maintenance (RBM) strategy for a power-generating plant
-
Krishnasamy L., Khan F.I., and Haddara M. Development of a risk-based maintenance (RBM) strategy for a power-generating plant. J. Loss Prevent. Process Ind. 18 (2005) 69-81
-
(2005)
J. Loss Prevent. Process Ind.
, vol.18
, pp. 69-81
-
-
Krishnasamy, L.1
Khan, F.I.2
Haddara, M.3
-
75
-
-
0034881839
-
A risk-based maintenance model for inspection and maintenance of cross-country petroleum pipeline
-
Dey P.K. A risk-based maintenance model for inspection and maintenance of cross-country petroleum pipeline. J. Qual. Maint. Eng. 7 1 (2001) 25-41
-
(2001)
J. Qual. Maint. Eng.
, vol.7
, Issue.1
, pp. 25-41
-
-
Dey, P.K.1
-
76
-
-
10644243605
-
Risk-based inspection and maintenance (RBIM) multi-attribute decision making with aggregate risk analysis
-
Khan F.I., Sadiq R., and Haddara M. Risk-based inspection and maintenance (RBIM) multi-attribute decision making with aggregate risk analysis. Trans. IChemE Process Saf. Environ. Prot. 82 B6 (2004) 398-411
-
(2004)
Trans. IChemE Process Saf. Environ. Prot.
, vol.82
, Issue.B6
, pp. 398-411
-
-
Khan, F.I.1
Sadiq, R.2
Haddara, M.3
|