메뉴 건너뛰기




Volumn 30, Issue 1, 1998, Pages 55-65

Buffering unbalanced assembly systems

Author keywords

[No Author keywords available]

Indexed keywords

HEURISTIC METHODS; INVENTORY CONTROL; OPTIMIZATION; PRODUCT DESIGN; PRODUCTION CONTROL; RANDOM PROCESSES;

EID: 0031697510     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408179808966437     Document Type: Article
Times cited : (42)

References (17)
  • 1
    • 0000816262 scopus 로고
    • Buffer allocation in unbalanced three-station serial lines
    • Powell, S.G., (1994) Buffer allocation in unbalanced three-station serial lines. International Journal of Production Research, 32, 2201–2217.
    • (1994) International Journal of Production Research , vol.32 , pp. 2201-2217
    • Powell, S.G.1
  • 2
    • 0029735339 scopus 로고
    • Optimal allocation of buffers to serial production lines with a bottleneck
    • Powell, S.G., and Pyke, D.F., (1994) Optimal allocation of buffers to serial production lines with a bottleneck. IIE TRANSACTIONS, 28, 18–29.
    • (1994) IIE TRANSACTIONS , vol.28 , pp. 18-29
    • Powell, S.G.1    Pyke, D.F.2
  • 3
    • 0023981046 scopus 로고
    • The role of work-in-process inventories in serial production lines
    • Conway, R.W., Maxwell, W.L., McClain, J.O., and Thomas, L.J., (1988) The role of work-in-process inventories in serial production lines. Operations Research, 36, 229–241.
    • (1988) Operations Research , vol.36 , pp. 229-241
    • Conway, R.W.1    Maxwell, W.L.2    McClain, J.O.3    Thomas, L.J.4
  • 4
    • 0023311310 scopus 로고
    • A study of work-time distributions on unpaced tasks
    • Knott, K., and Sury, R.J., (1987) A study of work-time distributions on unpaced tasks. IIE TRANSACTIONS, 19, 50–55.
    • (1987) IIE TRANSACTIONS , vol.19 , pp. 50-55
    • Knott, K.1    Sury, R.J.2
  • 5
    • 0001754984 scopus 로고
    • The effect of some design factors on the efficiency of production lines with vanable operation times
    • Hillier, F., and Boling, R., (1966) The effect of some design factors on the efficiency of production lines with vanable operation times. Journal of Industrial Engineering, 17 (12) 651–658.
    • (1966) Journal of Industrial Engineering , vol.17 , Issue.12 , pp. 651-658
    • Hillier, F.1    Boling, R.2
  • 6
    • 0018509376 scopus 로고
    • On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times
    • Hillier, F., and Boling, R., (1979) On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times. Management Science, 25, 721–728.
    • (1979) Management Science , vol.25 , pp. 721-728
    • Hillier, F.1    Boling, R.2
  • 7
    • 0026239015 scopus 로고
    • The effect of machine breakdowns and interstage storage on the performance of production line systems
    • Hillier, F., and So, K., (1991) The effect of machine breakdowns and interstage storage on the performance of production line systems. International Journal of Production Research, 29, 2043–2055.
    • (1991) International Journal of Production Research , vol.29 , pp. 2043-2055
    • Hillier, F.1    So, K.2
  • 8
    • 0027574248 scopus 로고
    • Some data for applying the bowl phenomenon to large production line systems
    • Hillier, F., and So, K., (1993) Some data for applying the bowl phenomenon to large production line systems. International Journal of Production Research, 31, 811–822.
    • (1993) International Journal of Production Research , vol.31 , pp. 811-822
    • Hillier, F.1    So, K.2
  • 9
    • 0001337659 scopus 로고
    • The effects of breakdowns and interstage storage on production line capacity
    • Freeman, M.C., (1964) The effects of breakdowns and interstage storage on production line capacity. Journal of Industrial Engineering, 15, 194–200.
    • (1964) Journal of Industrial Engineering , vol.15 , pp. 194-200
    • Freeman, M.C.1
  • 10
    • 85023829183 scopus 로고
    • The Goal (revised edn, North River Press, Croton-on-Hudson, NY
    • Goldratt, E.M., and Cox, J., (1986) The Goal (revised edn), North River Press, Croton-on-Hudson, NY.
    • (1986)
    • Goldratt, E.M.1    Cox, J.2
  • 11
    • 34249834508 scopus 로고
    • Manufacturing flow line systems a review of models and analytical results
    • Dallery, Y., and Gershwin, S.B., (1992) Manufacturing flow line systems a review of models and analytical results. Queueing Systems, 12, 3–94.
    • (1992) Queueing Systems , vol.12 , pp. 3-94
    • Dallery, Y.1    Gershwin, S.B.2
  • 13
    • 0027154533 scopus 로고
    • Optimal allocation of work in assembly systems
    • Baker, K.R., Powell, S.G., and Pyke, D.F., (1993) Optimal allocation of work in assembly systems. Management Science, 39 (1) 101–106.
    • (1993) Management Science , vol.39 , Issue.1 , pp. 101-106
    • Baker, K.R.1    Powell, S.G.2    Pyke, D.F.3
  • 14
    • 0022076035 scopus 로고
    • Approximation of general distributions by phase-type distributions
    • Altiok, T., (1985) Approximation of general distributions by phase-type distributions. AHE Transactions, 17 (2) 110–116.
    • (1985) AHE Transactions , vol.17 , Issue.2 , pp. 110-116
    • Altiok, T.1
  • 16
    • 0028464853 scopus 로고    scopus 로고
    • A predictive model for the throughput of unbuffered three-station serial lines
    • Baker, K.R., Powell, S.G., and Pyke, D.F., (1996) A predictive model for the throughput of unbuffered three-station serial lines. IIE TRANSACTIONS, 26 (4) 62–71.
    • (1996) IIE TRANSACTIONS , vol.26 , Issue.1 , pp. 62-71
    • Baker, K.R.1    Powell, S.G.2    Pyke, D.F.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.