메뉴 건너뛰기




Volumn 32, Issue 5-6, 2007, Pages 516-530

Modelling and simulation analysis of process alternatives in the cellular manufacturing of axially symmetric parts

Author keywords

Burnishing process; Cellular manufacturing; Clusters analysis; Machining; Process modelling; Simulation analysis

Indexed keywords

CELLULAR MANUFACTURING; COMPUTER SIMULATION; DATABASE SYSTEMS; FLEXIBLE MANUFACTURING SYSTEMS; OPTIMIZATION; PROCESS PLANNING;

EID: 33847704064     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-005-0366-5     Document Type: Review
Times cited : (15)

References (28)
  • 1
    • 0036876155 scopus 로고    scopus 로고
    • Next generation factory layouts: Research challenges and recent progress
    • Benjaafar S, Heragu SS, Irani SA (2002) Next generation factory layouts: research challenges and recent progress. Interfaces 32(6):58-76
    • (2002) Interfaces , vol.32 , Issue.6 , pp. 58-76
    • Benjaafar, S.1    Heragu, S.S.2    Irani, S.A.3
  • 3
    • 0036535815 scopus 로고    scopus 로고
    • Trends and perspectives in flexible and reconfigurable manufacturing systems
    • Mehrabi MG, Ulsoy AG, Koren Y, Heytler P (2002) Trends and perspectives in flexible and reconfigurable manufacturing systems. J Intell Manuf 13(2):135-146
    • (2002) J Intell Manuf , vol.13 , Issue.2 , pp. 135-146
    • Mehrabi, M.G.1    Ulsoy, A.G.2    Koren, Y.3    Heytler, P.4
  • 4
    • 0033329118 scopus 로고    scopus 로고
    • Ponnambalam SG, Aravindan P, Raghu Rami Reddy K (1999) Analysis of group - scheduling heuristics in a manufacturing cell. Int J Adv Manuf Technol 15(12):914-932
    • Ponnambalam SG, Aravindan P, Raghu Rami Reddy K (1999) Analysis of group - scheduling heuristics in a manufacturing cell. Int J Adv Manuf Technol 15(12):914-932
  • 6
    • 0030673573 scopus 로고    scopus 로고
    • Cellular decomposition of manufacturing facilities using resource elements
    • Gindy NNZ, Ratchev TM (1997) Cellular decomposition of manufacturing facilities using resource elements. Integ Manuf Syst 8(4):215-222
    • (1997) Integ Manuf Syst , vol.8 , Issue.4 , pp. 215-222
    • Gindy, N.N.Z.1    Ratchev, T.M.2
  • 7
    • 0025682904 scopus 로고
    • Multiple routings and capacity considerations in group technology applications
    • Nagi R, Harhalakis G, Proth JM (1990) Multiple routings and capacity considerations in group technology applications. Int J Prod Res 28(12):2243-2257
    • (1990) Int J Prod Res , vol.28 , Issue.12 , pp. 2243-2257
    • Nagi, R.1    Harhalakis, G.2    Proth, J.M.3
  • 8
    • 0034769610 scopus 로고    scopus 로고
    • Concurrent process and facility prototyping for formation of virtual manufacturing cells
    • Ratchev TM (2001) Concurrent process and facility prototyping for formation of virtual manufacturing cells. Integ Manuf Syst 12(4):306-315
    • (2001) Integ Manuf Syst , vol.12 , Issue.4 , pp. 306-315
    • Ratchev, T.M.1
  • 9
    • 0003373617 scopus 로고    scopus 로고
    • Modelling and analysis of machine sharing in manufacturing systems
    • Benjaafar S (1996) Modelling and analysis of machine sharing in manufacturing systems. Eur J Oper Res 91(1):56-73
    • (1996) Eur J Oper Res , vol.91 , Issue.1 , pp. 56-73
    • Benjaafar, S.1
  • 10
    • 0031248051 scopus 로고    scopus 로고
    • A design methodology for the fractal layout organization
    • Venkatadri U, Rardin R, Montreuil B (1997) A design methodology for the fractal layout organization. HE Trans 29 (10):911-924
    • (1997) HE Trans , vol.29 , Issue.10 , pp. 911-924
    • Venkatadri, U.1    Rardin, R.2    Montreuil, B.3
  • 11
    • 0032184296 scopus 로고    scopus 로고
    • Machine sharing in manufacturing systems: Total flexibility versus chaining
    • Sheikhzadeh M, Benjaafar S, Gupta D (1998) Machine sharing in manufacturing systems: total flexibility versus chaining. Int J Flex Manuf Syst 10(4):351-378
    • (1998) Int J Flex Manuf Syst , vol.10 , Issue.4 , pp. 351-378
    • Sheikhzadeh, M.1    Benjaafar, S.2    Gupta, D.3
  • 16
    • 0032648655 scopus 로고    scopus 로고
    • Integrating flexible process plans with scheduling in flexible manufacturing systems
    • Saygin C, Kilic SE (1999) Integrating flexible process plans with scheduling in flexible manufacturing systems. Int J Adv Manuf Technol 15(4):268-280
    • (1999) Int J Adv Manuf Technol , vol.15 , Issue.4 , pp. 268-280
    • Saygin, C.1    Kilic, S.E.2
  • 17
    • 0034316213 scopus 로고    scopus 로고
    • Simulation as an essential tool for advanced manufacturing technology problems
    • O'Kane JF, Spenceley JR, Taylor R (2000) Simulation as an essential tool for advanced manufacturing technology problems. J Mater Process Technol 107(1):412-424
    • (2000) J Mater Process Technol , vol.107 , Issue.1 , pp. 412-424
    • O'Kane, J.F.1    Spenceley, J.R.2    Taylor, R.3
  • 18
    • 0006033920 scopus 로고    scopus 로고
    • A hierarchic approach to production planning and scheduling of a flexible manufacturing system - an evaluation of due-date assignment rules
    • Persi P, Ukovich W, Pesenti R, Nicolich M (1999) A hierarchic approach to production planning and scheduling of a flexible manufacturing system - an evaluation of due-date assignment rules. Robot Com-Integ Manuf 15(5):373-385
    • (1999) Robot Com-Integ Manuf , vol.15 , Issue.5 , pp. 373-385
    • Persi, P.1    Ukovich, W.2    Pesenti, R.3    Nicolich, M.4
  • 21
    • 2442422224 scopus 로고    scopus 로고
    • A tradeoff analysis between process plan selection and cell formation in cellular manufacturing
    • Kizil M, Özbayrak M (2004) A tradeoff analysis between process plan selection and cell formation in cellular manufacturing. Int J Adv Manuf Technol 23(7-8):501-506
    • (2004) Int J Adv Manuf Technol , vol.23 , Issue.7-8 , pp. 501-506
    • Kizil, M.1    Özbayrak, M.2
  • 22
    • 33847722856 scopus 로고
    • A practical method for design of hybrid-type production facilities
    • TR 1994-17, ISR, University of Maryland, USA
    • Harhalakis G, Lu T, Minis I, Nagi R (1994) A practical method for design of hybrid-type production facilities. Technical research report TR 1994-17, ISR, University of Maryland, USA
    • (1994) Technical research report
    • Harhalakis, G.1    Lu, T.2    Minis, I.3    Nagi, R.4
  • 23
    • 84985788221 scopus 로고
    • Partitioning work centers for group technology: Analytical extension and shop-level simulation investigation
    • Suresh SC (1992) Partitioning work centers for group technology: analytical extension and shop-level simulation investigation. Decision Sci 23(2):267-290
    • (1992) Decision Sci , vol.23 , Issue.2 , pp. 267-290
    • Suresh, S.C.1
  • 24
    • 0023330558 scopus 로고
    • A robustness approach to facilities design
    • Rosenblatt MJ, Lee HL (1987) A robustness approach to facilities design. Int J Prod Res 25(4):479-486
    • (1987) Int J Prod Res , vol.25 , Issue.4 , pp. 479-486
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 25
    • 0027005571 scopus 로고
    • Algorithms for robust single and multiple period layout planning for manufacturing systems
    • Kouvelis P, Kurawarwala AA, Gutierrez GJ (1992) Algorithms for robust single and multiple period layout planning for manufacturing systems. Eur J Oper Res 63(2):287-303
    • (1992) Eur J Oper Res , vol.63 , Issue.2 , pp. 287-303
    • Kouvelis, P.1    Kurawarwala, A.A.2    Gutierrez, G.J.3
  • 27
    • 33847739569 scopus 로고    scopus 로고
    • Analyse-it for MS Excel (2003) General statistics evaluation version 1.71, Analyse-it Software Ltd, Leeds, UK. Home page at
    • Analyse-it for MS Excel (2003) General statistics (evaluation version 1.71). Analyse-it Software Ltd., Leeds, UK. Home page at http://www.analyse-it. com
  • 28
    • 33847745232 scopus 로고
    • The Statistics Homepage, Home page at
    • The Statistics Homepage (1984-2005) StatSoft Inc. Home page at http://www.statsoft.com/textbook/stathome.html
    • (1984) StatSoft Inc


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.