메뉴 건너뛰기




Volumn 32, Issue 6, 2002, Pages 58-76

Next generation factory layouts: Research challenges and recent progress

Author keywords

Facilities equipment planning: layout; Manufacturing: performance productivity, strategy

Indexed keywords


EID: 0036876155     PISSN: 00922102     EISSN: None     Source Type: Journal    
DOI: 10.1287/inte.32.6.58.6473     Document Type: Article
Times cited : (149)

References (75)
  • 1
    • 84911285274 scopus 로고
    • Dynamic layout strategies for flexible manufacturing systems
    • Afentakis, P., R. A. Millen, M. M. Salomon. 1990. Dynamic layout strategies for flexible manufacturing systems. Internat. J. Production Res. 28(2) 311-323.
    • (1990) Internat. J. Production Res. , vol.28 , Issue.2 , pp. 311-323
    • Afentakis, P.1    Millen, R.A.2    Salomon, M.M.3
  • 2
    • 0033098485 scopus 로고    scopus 로고
    • An empirical evaluation of holonic and fractal layouts. Internat
    • Askin, R. G. 1999. An empirical evaluation of holonic and fractal layouts. Internat, J. Production Res. 37(5) 961-978.
    • (1999) J. Production Res. , vol.37 , Issue.5 , pp. 961-978
    • Askin, R.G.1
  • 3
    • 0011758550 scopus 로고    scopus 로고
    • A material flow based evaluation of layout alternatives for agile manufacturing
    • R. J. Graves, L. F. McGinnis, D. J. Medeiros, R. E. Ward, M. R. Wilhelm, eds. Braun-Brumfield, Ann Arbor, MI
    • _, N. H. Lundgren, F. Ciarallo. 1997. A material flow based evaluation of layout alternatives for agile manufacturing. R. J. Graves, L. F. McGinnis, D. J. Medeiros, R. E. Ward, M. R. Wilhelm, eds. Progress in Material Handling Research. Braun-Brumfield, Ann Arbor, MI, 71-90.
    • (1997) Progress in Material Handling Research , pp. 71-90
    • Lundgren, N.H.1    Ciarallo, F.2
  • 4
    • 85036721567 scopus 로고
    • Flexible workstations cut work in process
    • September issue. Retrieved June 2
    • Assembly Magazine (online edition). 1995. Flexible workstations cut work in process. September issue. Retrieved June 2, 2002 〈www.assemblymag.com〉.
    • (1995) Assembly Magazine (Online Edition)
  • 6
    • 0027590069 scopus 로고
    • The dynamics of plant layout
    • Balakrishnan, J. 1993. The dynamics of plant layout. Management Sci. 39(5) 654-655.
    • (1993) Management Sci. , vol.39 , Issue.5 , pp. 654-655
    • Balakrishnan, J.1
  • 7
    • 0032134718 scopus 로고    scopus 로고
    • Dynamic layout algorithms: A state of the art survey
    • _, C. H. Cheng. 1998. Dynamic layout algorithms: A state of the art survey. Omega 26(4) 507-521.
    • (1998) Omega , vol.26 , Issue.4 , pp. 507-521
    • Cheng, C.H.1
  • 8
    • 0026827205 scopus 로고
    • Solutions for the constrained dynamic facility layout problem
    • _, F. R. Jacobs, M. A. Venkataramanan. 1992. Solutions for the constrained dynamic facility layout problem. Eur. J. Oper. Res. 57(2) 280-286.
    • (1992) Eur. J. Oper. Res. , vol.57 , Issue.2 , pp. 280-286
    • Jacobs, F.R.1    Venkataramanan, M.A.2
  • 9
    • 0000921711 scopus 로고
    • The dynamics of plant layout
    • Batta, R. 1987. The dynamics of plant layout. Management Sci. 33(8) 1065.
    • (1987) Management Sci. , vol.33 , Issue.8 , pp. 1065
    • Batta, R.1
  • 10
    • 0003257906 scopus 로고
    • Machine sharing in cellular manufacturing systems
    • A. K. Kamrani, H. R. Parasei, D. H. Liles, eds. Elsevier Science B. V., Amsterdam, The Netherlands
    • Benjaafar, S. 1995. Machine sharing in cellular manufacturing systems. A. K. Kamrani, H. R. Parasei, D. H. Liles, eds. Planning, Design, and Analysis of Cellular Manufacturing Systems. Elsevier Science B. V., Amsterdam, The Netherlands.
    • (1995) Planning, Design, and Analysis of Cellular Manufacturing Systems
    • Benjaafar, S.1
  • 12
    • 0012911725 scopus 로고    scopus 로고
    • Design of plant layouts with queueing effects
    • _. 2002. Design of plant layouts with queueing effects. Management Sci. 48(5) 679-704.
    • (2002) Management Sci. , vol.48 , Issue.5 , pp. 679-704
  • 13
    • 0034467669 scopus 로고    scopus 로고
    • Design of flexible plant layouts
    • _, M. Sheikhzadeh. 2000. Design of flexible plant layouts. IIE Trans. 32(4) 309-322.
    • (2000) IIE Trans. , vol.32 , Issue.4 , pp. 309-322
    • Sheikhzadeh, M.1
  • 14
    • 0012961409 scopus 로고    scopus 로고
    • Layout design in dynamic environments: Strategies and quantitative indices
    • Forthcoming
    • Braglia, M., S. Zanoni, L. Zavanella. 2002. Layout design in dynamic environments: Strategies and quantitative indices. Internat, J. Production Res. Forthcoming.
    • (2002) Internat, J. Production Res.
    • Braglia, M.1    Zanoni, S.2    Zavanella, L.3
  • 15
    • 0012912683 scopus 로고
    • Evaluating the flexibility of facilities layouts using estimated relayout costs
    • Birmingham, U.K.
    • Bullington, S. F., D. B. Webster. 1987. Evaluating the flexibility of facilities layouts using estimated relayout costs. Proc. IXth Internat. Conf. Production Res. Birmingham, U.K., 2230-2236.
    • (1987) Proc. IXth Internat. Conf. Production Res. , pp. 2230-2236
    • Bullington, S.F.1    Webster, D.B.2
  • 16
    • 0028518432 scopus 로고
    • Genetic search and the dynamic facility layout problem
    • Conway, D. G., M. A. Venkataramanan. 1994. Genetic search and the dynamic facility layout problem. Comput. Oper. Res. 21(8) 955-960.
    • (1994) Comput. Oper. Res. , vol.21 , Issue.8 , pp. 955-960
    • Conway, D.G.1    Venkataramanan, M.A.2
  • 17
    • 0003454345 scopus 로고
    • Ph.D. dissertation, School of Industrial Engineering, Purdue University, West Lafayette, IN
    • Drolet, J. R. 1989. Scheduling virtual cellular manufacturing systems. Ph.D. dissertation, School of Industrial Engineering, Purdue University, West Lafayette, IN.
    • (1989) Scheduling Virtual Cellular Manufacturing Systems
    • Drolet, J.R.1
  • 18
    • 0002916909 scopus 로고    scopus 로고
    • Souping up the supply chain
    • Engardio, P. 1998. Souping up the supply chain. Bus. Week (August) 24-31, 110-112.
    • (1998) Bus. Week , Issue.AUGUST , pp. 24-31
    • Engardio, P.1
  • 19
    • 0013015085 scopus 로고    scopus 로고
    • Less automation means more productivity at Sun Microsystems
    • Feare, T. 1997. Less automation means more productivity at Sun Microsystems. Modern Materials Handling (November 1) 22-25.
    • (1997) Modern Materials Handling , Issue.NOVEMBER 1 , pp. 22-25
    • Feare, T.1
  • 20
    • 0000085786 scopus 로고    scopus 로고
    • Mass customization at Hewlett Packard: The power of postponement
    • Feitzinger, E., H. Lee. 1997. Mass customization at Hewlett Packard: The power of postponement. Harvard Bus. Rev. 75(1) 116-121.
    • (1997) Harvard Bus. Rev. , vol.75 , Issue.1 , pp. 116-121
    • Feitzinger, E.1    Lee, H.2
  • 21
    • 0022785585 scopus 로고
    • A simulation comparison of group technology with traditional job shop manufacturing
    • Flynn, B. B., F. R. Jacobs. 1986. A simulation comparison of group technology with traditional job shop manufacturing. Internat. J. Production Res. 24(5) 1171-1192.
    • (1986) Internat. J. Production Res. , vol.24 , Issue.5 , pp. 1171-1192
    • Flynn, B.B.1    Jacobs, F.R.2
  • 22
    • 0030869878 scopus 로고    scopus 로고
    • Minimizing work-in-process and material handling in the facilities layout problem
    • Fu, M. C., B. K. Kaku. 1997. Minimizing work-in-process and material handling in the facilities layout problem. IIE Trans. 29(1) 29-36.
    • (1997) IIE Trans. , vol.29 , Issue.1 , pp. 29-36
    • Fu, M.C.1    Kaku, B.K.2
  • 23
    • 85036692067 scopus 로고    scopus 로고
    • The asset paradox
    • Gibson, P. 2000. The asset paradox. Electronic Bus, Magazine 26(4) 120-126 〈www.eb-mag.com〉.
    • (2000) Electronic Bus, Magazine , vol.26 , Issue.4 , pp. 120-126
    • Gibson, P.1
  • 24
    • 0033226199 scopus 로고    scopus 로고
    • The effect of trailer scheduling on the layout of freight terminals
    • Gue, K. 1999, The effect of trailer scheduling on the layout of freight terminals. Transportation Sci. 33(4) 419-428.
    • (1999) Transportation Sci. , vol.33 , Issue.4 , pp. 419-428
    • Gue, K.1
  • 26
    • 0012963222 scopus 로고
    • Flexibility in layouts: A simulation approach
    • Gupta, R. M. 1986. Flexibility in layouts: A simulation approach. Material Flow 3(4) 243-250.
    • (1986) Material Flow , vol.3 , Issue.4 , pp. 243-250
    • Gupta, R.M.1
  • 27
    • 0028377942 scopus 로고
    • Group technology and cellular manufacturing
    • Heragu, S. S. 1994. Group technology and cellular manufacturing. IEEE Trans. Systems, Man, Cybernetics 24(2) 203-215.
    • (1994) IEEE Trans. Systems, Man, Cybernetics , vol.24 , Issue.2 , pp. 203-215
    • Heragu, S.S.1
  • 28
    • 0004269080 scopus 로고    scopus 로고
    • PWS Publishing, Boston, MA
    • _. 1997. Facilities Design. PWS Publishing, Boston, MA.
    • (1997) Facilities Design
  • 32
    • 0016950002 scopus 로고
    • CRAFT-M for layout arrangement
    • Hicks, P. E., T. E. Cowan. 1976. CRAFT-M for layout arrangement. Indust. Engrg. 8(5) 30-35.
    • (1976) Indust. Engrg. , vol.8 , Issue.5 , pp. 30-35
    • Hicks, P.E.1    Cowan, T.E.2
  • 33
    • 85036717794 scopus 로고    scopus 로고
    • Highly productive and reconfigurable manufacturing systems
    • Technical project report, Retrieved September
    • Ikegaya, A. 2000. Highly productive and reconfigurable manufacturing systems. Technical project report, Intelligent Manufacturing Systems Initiative. Retrieved September 2001 〈www.ims.org〉.
    • (2000) Intelligent Manufacturing Systems Initiative
    • Ikegaya, A.1
  • 34
    • 0034204916 scopus 로고    scopus 로고
    • Custom design of facility layouts for multi-product facilities using layout modules
    • Irani, S. A., H. Huang. 2000. Custom design of facility layouts for multi-product facilities using layout modules. IEEE Trans. Robotics Automation 16 259-267.
    • (2000) IEEE Trans. Robotics Automation , vol.16 , pp. 259-267
    • Irani, S.A.1    Huang, H.2
  • 35
    • 0027574249 scopus 로고
    • Virtual manufacturing cells: Exploiting layout design and intercell flows for the machine sharing problem
    • _, T. M. Cavalier, P. H. Cohen. 1993. Virtual manufacturing cells: Exploiting layout design and intercell flows for the machine sharing problem. Internat. J. Production Res. 31(4) 791-810.
    • (1993) Internat. J. Production Res. , vol.31 , Issue.4 , pp. 791-810
    • Cavalier, T.M.1    Cohen, P.H.2
  • 36
    • 0000459620 scopus 로고    scopus 로고
    • A tabu-search heuristic for the dynamic plant layout problem
    • Kaku, B. K., J. B. Mazzola. 1997. A tabu-search heuristic for the dynamic plant layout problem. INFORMS J. Comput. 9(4) 374-384.
    • (1997) INFORMS J. Comput. , vol.9 , Issue.4 , pp. 374-384
    • Kaku, B.K.1    Mazzola, J.B.2
  • 38
    • 0032685930 scopus 로고    scopus 로고
    • Facility layout design in a changing environment
    • Kochhar, J. S., S. S. Heragu. 1999. Facility layout design in a changing environment. Internat. J. Production Res. 37(11) 2429-2446.
    • (1999) Internat. J. Production Res. , vol.37 , Issue.11 , pp. 2429-2446
    • Kochhar, J.S.1    Heragu, S.S.2
  • 40
    • 0026168861 scopus 로고
    • Single and multiple period layout models for automated manufacturing systems
    • Kouvelis, P., A. S. Kiran. 1991. Single and multiple period layout models for automated manufacturing systems. Eur. J. Oper. Res. 52(3) 300-314.
    • (1991) Eur. J. Oper. Res. , vol.52 , Issue.3 , pp. 300-314
    • Kouvelis, P.1    Kiran, A.S.2
  • 41
    • 0027005571 scopus 로고
    • Algorithms for robust single period and multiple period layout planning for manufacturing systems
    • _, A. A. Kurawarwala, G. J. Gutierrez. 1992. Algorithms for robust single period and multiple period layout planning for manufacturing systems. Eur. J. Oper. Res. 63(2) 287-303.
    • (1992) Eur. J. Oper. Res. , vol.63 , Issue.2 , pp. 287-303
    • Kurawarwala, A.A.1    Gutierrez, G.J.2
  • 42
    • 0023364439 scopus 로고
    • The facility layout problem
    • Kusiak, A., S. S. Heragu. 1987. The facility layout problem. Eur. J. Oper. Res. 29(3) 229-251.
    • (1987) Eur. J. Oper. Res. , vol.29 , Issue.3 , pp. 229-251
    • Kusiak, A.1    Heragu, S.S.2
  • 43
    • 0027559579 scopus 로고
    • Quadratic assignment algorithms for the dynamic layout problem
    • Lacksonen, T.A., E. E. Enscore. 1993. Quadratic assignment algorithms for the dynamic layout problem. Internat. J. Production Res. 31(3) 503-517.
    • (1993) Internat. J. Production Res. , vol.31 , Issue.3 , pp. 503-517
    • Lacksonen, T.A.1    Enscore, E.E.2
  • 44
    • 0012954849 scopus 로고    scopus 로고
    • Working paper, Department of Mechanical Engineering, University of Minnesota, Minneapolis, MN
    • Lahmar, M., S. Benjaafar. 2002. Design of dynamic distributed layouts. Working paper, Department of Mechanical Engineering, University of Minnesota, Minneapolis, MN.
    • (2002) Design of Dynamic Distributed Layouts
    • Lahmar, M.1    Benjaafar, S.2
  • 45
    • 0030734685 scopus 로고    scopus 로고
    • Modeling the costs and benefits of delayed product differentiation
    • Lee, H. L., C. S. Tang. 1997. Modeling the costs and benefits of delayed product differentiation. Management Sci. 43(1) 40-53.
    • (1997) Management Sci. , vol.43 , Issue.1 , pp. 40-53
    • Lee, H.L.1    Tang, C.S.2
  • 46
    • 85036710331 scopus 로고    scopus 로고
    • Special report - The top 100 contract manufacturers
    • Retrieved June 2
    • McHale, T. 1999. Special report-The top 100 contract manufacturers. Electronic Bus. Magazine (August). Retrieved June 2, 2002 〈www.eb-mag.com〉.
    • (1999) Electronic Bus. Magazine , Issue.AUGUST
    • McHale, T.1
  • 47
    • 33749834100 scopus 로고    scopus 로고
    • The facility layout problem: Recent and emerging trends and perspectives
    • Meller, R., K. Y. Gau. 1996a. The facility layout problem: Recent and emerging trends and perspectives. J. Manufacturing Systems 15(5) 351-366.
    • (1996) J. Manufacturing Systems , vol.15 , Issue.5 , pp. 351-366
    • Meller, R.1    Gau, K.Y.2
  • 48
    • 0030270848 scopus 로고    scopus 로고
    • Facility layout objective functions and robust layouts. Internat
    • _, _. 1996b. Facility layout objective functions and robust layouts. Internat. J. Production Res. 34(10) 2727-2742.
    • (1996) J. Production Res. , vol.34 , Issue.10 , pp. 2727-2742
  • 49
    • 0033080246 scopus 로고    scopus 로고
    • Fractal layout organization for job shop environments
    • Montreuil, B. 1999. Fractal layout organization for job shop environments. Internat. J. Production Res. 37(3) 501-521.
    • (1999) Internat. J. Production Res. , vol.37 , Issue.3 , pp. 501-521
    • Montreuil, B.1
  • 50
    • 0026985334 scopus 로고
    • Dynamic layout design given a scenario tree of probable futures
    • _, A. LaForge. 1992. Dynamic layout design given a scenario tree of probable futures. Eur. J. Oper. Res. 63(2) 271-286.
    • (1992) Eur. J. Oper. Res. , vol.63 , Issue.2 , pp. 271-286
    • LaForge, A.1
  • 51
    • 0026172794 scopus 로고
    • Strategic interpolative design of dynamic manufacturing systems layout
    • _, U. Venkatadri. 1991. Strategic interpolative design of dynamic manufacturing systems layout. Management Sci. 37(6) 682-694.
    • (1991) Management Sci. , vol.37 , Issue.6 , pp. 682-694
    • Venkatadri, U.1
  • 52
    • 0002854830 scopus 로고
    • Technical Report No. 91-76, Faculty of Management, Laval University, Montreal, Québec, Canada
    • _, _, P. Lefrançois. 1991. Holographic layout of manufacturing systems. Technical Report No. 91-76, Faculty of Management, Laval University, Montreal, Québec, Canada.
    • (1991) Holographic Layout of Manufacturing Systems
    • Lefrançois, P.1
  • 53
    • 0003818241 scopus 로고    scopus 로고
    • National Academy Press, Washington, DC
    • National Research Council. 1998. Visionary Manufacturing Challenges for 2020. National Academy Press, Washington, DC.
    • (1998) Visionary Manufacturing Challenges for 2020
  • 56
    • 0022516277 scopus 로고
    • The dynamics of plant layout
    • Rosenblatt, M. J. 1986. The dynamics of plant layout. Management Sci. 32(1)76-86.
    • (1986) Management Sci. , vol.32 , Issue.1 , pp. 76-86
    • Rosenblatt, M.J.1
  • 57
    • 84952167046 scopus 로고
    • The single period stochastic plant layout problem
    • _, D. H. Kropp. 1992. The single period stochastic plant layout problem. IIE Trans. 24(2) 169-176.
    • (1992) IIE Trans. , vol.24 , Issue.2 , pp. 169-176
    • Kropp, D.H.1
  • 58
    • 0023330558 scopus 로고
    • A robustness approach to facilities design
    • _, H. L. Lee. 1987. A robustness approach to facilities design. Internat. J. Production Res. 25(4) 479-486.
    • (1987) Internat. J. Production Res. , vol.25 , Issue.4 , pp. 479-486
    • Lee, H.L.1
  • 59
    • 0013016339 scopus 로고
    • Comparison of equivalent pure cellular and functional production environments using simulation
    • Sarper, H., T. J. Greene. 1993. Comparison of equivalent pure cellular and functional production environments using simulation. Internat. J. Comput. Integrated Manufacturing 6(4) 221-236.
    • (1993) Internat. J. Comput. Integrated Manufacturing , vol.6 , Issue.4 , pp. 221-236
    • Sarper, H.1    Greene, T.J.2
  • 61
    • 84990614224 scopus 로고
    • Cellular versus functional layout under a variety of shop operating conditions
    • Shafer, S. M., J. M. Charnes. 1993. Cellular versus functional layout under a variety of shop operating conditions. Decision Sci. 24(3) 665-681.
    • (1993) Decision Sci. , vol.24 , Issue.3 , pp. 665-681
    • Shafer, S.M.1    Charnes, J.M.2
  • 62
    • 0019024645 scopus 로고
    • Flexible facilities design
    • Shore, R. H., J. A. Tompkins. 1980. Flexible facilities design. AIIE Trans. 12(2) 200-205.
    • (1980) AIIE Trans. , vol.12 , Issue.2 , pp. 200-205
    • Shore, R.H.1    Tompkins, J.A.2
  • 64
    • 0028406510 scopus 로고
    • Coping with the loss of pooling synergy in cellular manufacturing systems
    • Suresh, N., J. Meredith. 1994. Coping with the loss of pooling synergy in cellular manufacturing systems. Management Sci. 40(4) 466-483.
    • (1994) Management Sci. , vol.40 , Issue.4 , pp. 466-483
    • Suresh, N.1    Meredith, J.2
  • 65
    • 0002605502 scopus 로고
    • Modularity and flexibility: Dealing with future shock in facilities design
    • Tompkins, J. A. 1980. Modularity and flexibility: Dealing with future shock in facilities design. Indust. Engrg. 22(9) 78-81.
    • (1980) Indust. Engrg. , vol.22 , Issue.9 , pp. 78-81
    • Tompkins, J.A.1
  • 67
    • 0026831704 scopus 로고
    • Computational performance and efficiency of lower bound procedures for the dynamic facility layout problem
    • Urban, T. L. 1992. Computational performance and efficiency of lower bound procedures for the dynamic facility layout problem. Eur. J. Oper. Res. 57(2) 271-279.
    • (1992) Eur. J. Oper. Res. , vol.57 , Issue.2 , pp. 271-279
    • Urban, T.L.1
  • 68
    • 0027632929 scopus 로고
    • A heuristic for the dynamic layout problem
    • _. 1993. A heuristic for the dynamic layout problem. IIE Trans. 25(4) 57-63.
    • (1993) IIE Trans. , vol.25 , Issue.4 , pp. 57-63
  • 69
    • 0032364642 scopus 로고    scopus 로고
    • Solution procedures for the dynamic facility layout problem
    • _. 1998. Solution procedures for the dynamic facility layout problem. Ann. Oper. Res. 76 323-342.
    • (1998) Ann. Oper. Res. , vol.76 , pp. 323-342
  • 70
    • 0031248051 scopus 로고    scopus 로고
    • A design methodology for the fractal layout organization
    • Venkatadri, U., R. Rardin, B. Montreuil. 1997. A design methodology for the fractal layout organization. IIE Trans. 29(10) 911-924.
    • (1997) IIE Trans. , vol.29 , Issue.10 , pp. 911-924
    • Venkatadri, U.1    Rardin, R.2    Montreuil, B.3
  • 72
    • 0024731850 scopus 로고
    • Cellular manufacturing in the U.S. industry: A survey of users
    • Wemmerlöv, U., L. N. Hyer. 1989. Cellular manufacturing in the U.S. industry: A survey of users. Internat. J. Production Res. 27(9) 1511-1530.
    • (1989) Internat. J. Production Res. , vol.27 , Issue.9 , pp. 1511-1530
    • Wemmerlöv, U.1    Hyer, L.N.2
  • 73
    • 0034651055 scopus 로고    scopus 로고
    • Empirical findings on manufacturing cell design
    • _, D. J. Johnson. 2000. Empirical findings on manufacturing cell design. Internat. J. Production Res. 38(3) 481-507.
    • (2000) Internat. J. Production Res. , vol.38 , Issue.3 , pp. 481-507
    • Johnson, D.J.1
  • 74
    • 0012912295 scopus 로고    scopus 로고
    • Super factory-or super headache
    • Wheatley, J. 2000. Super factory-or super headache. Bus. Week (July) 31, 66.
    • (2000) Bus. Week , Issue.JULY , pp. 31
    • Wheatley, J.1
  • 75
    • 0032122942 scopus 로고    scopus 로고
    • Flexible machine layout design for dynamic and uncertain production environments
    • Yang, T., B. A. Peters. 1998. Flexible machine layout design for dynamic and uncertain production environments. Eur. J. Oper. Res. 108(1) 49-64.
    • (1998) Eur. J. Oper. Res. , vol.108 , Issue.1 , pp. 49-64
    • Yang, T.1    Peters, B.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.