메뉴 건너뛰기




Volumn 133, Issue 2, 2007, Pages 139-145

Residential building projects: Building cost indicators and drivers

Author keywords

Construction cost; Cost control; Cost estimates; Germany; Pricing

Indexed keywords

CONSTRUCTION COST; COST CONTROL; COST ESTIMATES; GROSS FLOOR AREA;

EID: 33846276572     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2007)133:2(139)     Document Type: Article
Times cited : (28)

References (14)
  • 1
    • 13944265044 scopus 로고    scopus 로고
    • Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression
    • Attalla, M., and Hegazy, T. (2003). " Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression.. " J. Constr. Eng. Manage., 129 (4), 405-411.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.4 , pp. 405-411
    • Attalla, M.1    Hegazy, T.2
  • 2
    • 84993089537 scopus 로고    scopus 로고
    • A comparative approach for modeling the cost of energy in sport facilities
    • Boussabaine, A. H. (2001). " A comparative approach for modeling the cost of energy in sport facilities.. " Facilities, 19 (5/6), 194-203.
    • (2001) Facilities , vol.19 , Issue.5-6 , pp. 194-203
    • Boussabaine, A.H.1
  • 3
    • 0039784095 scopus 로고
    • DIN Deutsches Institut für Normung (DIN). (Beuth, Berlin.
    • DIN Deutsches Institut für Normung (DIN). (1993). DIN 276 Kosten im Hochbau (building costs), Beuth, Berlin.
    • (1993) DIN 276 Kosten im Hochbau (Building Costs)
  • 5
    • 0036744325 scopus 로고    scopus 로고
    • Data modeling and the application of a neural network approach to the prediction of total construction costs
    • Emsley, M. E., Lowe, D. J., Duff, A. R., Harding, A., and Hickson, A. (2002). " Data modeling and the application of a neural network approach to the prediction of total construction costs.. " Constr. Manage. Econom., 20 (6), 465-472.
    • (2002) Constr. Manage. Econom. , vol.20 , Issue.6 , pp. 465-472
    • Emsley, M.E.1    Lowe, D.J.2    Duff, A.R.3    Harding, A.4    Hickson, A.5
  • 6
    • 0042689966 scopus 로고    scopus 로고
    • Influence of project type and procurement method on rework costs in building construction projects
    • Love, P. E. D. (2002). " Influence of project type and procurement method on rework costs in building construction projects.. " J. Constr. Eng. Manage., 128 (1), 18-29.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.1 , pp. 18-29
    • Love, P.E.D.1
  • 7
    • 12744250283 scopus 로고    scopus 로고
    • Time-cost relationships in Australian building construction projects
    • Love, P. E. D., Tse, R. Y. C., and Edwards, D. J. (2005). " Time-cost relationships in Australian building construction projects.. " J. Constr. Eng. Manage., 131 (2), 187-194.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.2 , pp. 187-194
    • Love, P.E.D.1    Tse, R.Y.C.2    Edwards, D.J.3
  • 8
    • 0037968270 scopus 로고    scopus 로고
    • Height and construction costs of buildings in Hong Kong
    • Picken, D. H., and Ilozor, B. D. (2003). " Height and construction costs of buildings in Hong Kong.. " Constr. Manage. Econom., 21 (2), 107-111.
    • (2003) Constr. Manage. Econom. , vol.21 , Issue.2 , pp. 107-111
    • Picken, D.H.1    Ilozor, B.D.2
  • 9
    • 33846309084 scopus 로고    scopus 로고
    • Verfahren der kostenermittlung, kostenkontrolle und kostensteuerung
    • BKI, Stuttgart, Germany
    • Ruf, H.-U. (2003). " Verfahren der kostenermittlung, kostenkontrolle und kostensteuerung.. " Handbuch Kostenplanung I Hochbau, BKI, Stuttgart, Germany, 90-109.
    • (2003) Handbuch Kostenplanung i Hochbau , pp. 90-109
    • Ruf, H.-U.1
  • 10
    • 12444322500 scopus 로고
    • Developments in contract price forecasting and bidding techniques
    • P. S.Brandon, ed., BSP Professional Books, London
    • Skitmore, R. M. (1990). " Developments in contract price forecasting and bidding techniques.. " Quantity surveying techniques: New directions, P. S. Brandon, ed., BSP Professional Books, London, 75-120.
    • (1990) Quantity Surveying Techniques: New Directions , pp. 75-120
    • Skitmore, R.M.1
  • 11
    • 0038604047 scopus 로고    scopus 로고
    • Forecast models for actual construction time and cost
    • Skitmore, R. M., and Ng, S. T. (2003). " Forecast models for actual construction time and cost.. " Build. Environ., 38 (8), 1075-1083.
    • (2003) Build. Environ. , vol.38 , Issue.8 , pp. 1075-1083
    • Skitmore, R.M.1    Ng, S.T.2
  • 12
    • 33846307994 scopus 로고    scopus 로고
    • Statistisches Bundesamt Deutschland. (Wiesbaden, Germany.
    • Statistisches Bundesamt Deutschland. (2005). " Preisindizes für den Neubau von wohngebäuden insgesamt.. " Statistisches bundesamt Deutschland, Wiesbaden, Germany.
    • (2005) Preisindizes für Den Neubau von Wohngebäuden Insgesamt
  • 13
    • 33846325315 scopus 로고    scopus 로고
    • A low-cost construction price index based on building functions
    • ICEC, Rotterdam, The Netherlands.
    • Thalmann, P. (1998). " A low-cost construction price index based on building functions.. " Proc., 15th Int. Cost Engineering Congress, ICEC, Rotterdam, The Netherlands.
    • (1998) Proc., 15th Int. Cost Engineering Congress
    • Thalmann, P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.